A flush interior door looks simple from a distance: a flat panel, no visible frame, no architrave, sitting level with the wall. That simplicity is exactly why it is so easy to specify badly. The visual result depends less on the door leaf itself than on what the designer and the buyer agreed before production started — opening direction, wall build-up, floor levels, hardware, finish and who is responsible for each interface. This guide sets out the alignment points we see make the difference between a clean, invisible opening and a snag list.

Start with the door schedule, not the product page

Our Santerson Flush Interior Doors sit within the wider Interior Doors collection, alongside decorative interior doors and standard interior hinged doors. Every one of them is made to measure, with material and finish options selected per project, and layout tailored to the space. That configurability is the reason a single "flush door" line item on a bill of quantities causes problems: it does not yet say enough for anyone to price or build anything.

Before a quotation makes sense, we ask designers and buyers to bring the same four columns to the table for every opening:

  • Location and quantity — which room, how many leaves, and whether the same finish continues across several openings.
  • Clear opening size and finished floor level — rough opening plus the completed floor build-up on both sides of the wall.
  • Operation type — hinged, sliding or pocket, and the swing direction or pocket depth required.
  • Finish intent — painted flush to the wall, wood veneer to match joinery, or a decorative surface that stays visible.

Those four columns are what we can price and manufacture against. Everything below expands on them.

Agree the operation type before agreeing the look

Designers usually choose a flush door for its appearance, but the operating mechanism decides how much structure the wall has to carry. Our flush hinged doors need concealed hinges and a frame detail that can take the leaf weight at the chosen height. Flush sliding doors need a track, a running clearance and a pocket or an overlap wall. Wood veneer pocket doors and glass pocket doors need a cavity deep enough to receive the leaf, which is a framing decision long before the door is ordered.

The practical alignment point: the buyer confirms the structural and framing scope on site, the designer confirms that the chosen operation still works with furniture layout and circulation, and both are recorded in the schedule. When this is left open, the door arrives correctly made for an opening that was never built for it.

Decide how the door meets the wall

Flush detailing lives or dies at the junction. In our Flush / Concealed Doors range, flush wall aligned doors are specified so that the leaf sits in line with the finished wall surface rather than standing proud of it. Whether that reads as seamless depends on three things that sit outside the door itself:

  • Wall build-up and total thickness — the frame has to match the completed wall, including plasterboard, render or cladding layers.
  • Joint treatment — a shadow gap, a flush reveal or a continuous surface each needs a different detail drawn in advance.
  • Floor threshold — the gap under the leaf depends on the finished floor level on both sides, including any transition strip.

Where the door should disappear entirely, we also supply handleless concealed doors, which remove visible ironmongery from the elevation, and decorative concealed doors for openings that carry a pattern or panel line through them. Buyers should confirm early whether hardware is being hidden by design or simply not yet chosen, because the two lead to different wall and frame details.

Match the door to the wall it sits in

The most consistent results come from specifying the door and the surrounding surface as one item rather than two trades. Our Paneling Systems collection includes wood veneer panels, matte lacquer panels and textured panels, all made to measure with finish options selected per project. Pairing a wood veneer hinged door with matching veneer wall panels means one supplier controls the grain direction, the sheen level and the edge detail across the whole elevation.

The same logic applies to integrated openings. Our integrated door and paneling work, and related wall panel systems and custom niche paneling, let a hidden door sit within a run of panelling with the module lines carried through. For those situations the alignment point is drawing-level: who sets the module grid, and does the door leaf fall on it or across it.

Fix dimensions from site, not from the first drawing

Every door we make is made to measure, so the dimension set has to come from a settled condition. We ask buyers to confirm final openings after wall finishes and floor levels are fixed, and to state clearly which numbers are rough opening, finished opening and leaf size. Where a project is still developing, we work from the design intent for pricing and then re-confirm before production. Product pages give a configurable overview rather than a fixed specification sheet, so dimensions and selected specifications should always be confirmed for each project.

Two details are worth settling in writing: door height relative to ceiling lines — full-height leaves that run to the soffit need a level ceiling line to follow — and the relationship between adjacent openings, since a series of flush doors along one corridor reads as successful only if the reveals and levels repeat.

Put the interfaces on one page

For villa and apartment projects, we act as a one-stop project furnishing supplier, covering doors, joinery, wall systems and fit-out products under one coordination scope. That is useful here for one specific reason: the interfaces stop being arguments between separate suppliers. As a custom furniture and interior products manufacturer, we can produce the door leaf, the frame detail and the surrounding panelling against the same drawings, so grain, sheen and module lines are carried through rather than approximated.

Our project process runs through consultation, design and planning, production, logistics, installation and after-sales support. For flush doors specifically, we suggest designers and buyers agree three practical items before order: the door schedule with all four columns above; a marked-up elevation showing every opening in its wall context; and a named contact for site dimension checks. That single page prevents most of the rework we see on door packages.

If you are specifying a flush door package for a villa or apartment project, send us the schedule and the relevant elevations and we will confirm what can be made to measure, which finish options apply, and where site verification is still needed.