A quotation that lists "one piece toilet, modern style" and a unit price is easy to compare and hard to trust. Two quotes for the same bathroom can look identical on the summary line and still differ in drain orientation, seat hardware, packing and delivery terms. If you are sourcing washdown one piece toilets for a villa, apartment block or hotel room floor, the following checklist is what we recommend confirming line by line before you place an order.

1. Confirm the model name and the series it belongs to

Ask for the exact model code on the quotation, not just a description. Our 1003A is a modern washdown one piece toilet in vitreous ceramic with a glossy glaze and a seamless tank-to-bowl body. A model code lets you match the sample, the packing mark, the drawing and the invoice to the same item; a generic description invites substitutions during production.

It is also worth asking which series the model sits in. Sanitary ware is usually bought as a set — water closet, basin, bidet — and matching series simplify both the design and the spare-parts plan later on.

2. State the trap type and rough-in dimension

This is the single most common cause of returned toilets. The 1003A supports two installation types: a P-trap wall drain with 180 mm rough-in, and an S-trap floor drain with 250 mm rough-in. A quotation that simply says "floor drain" or "wall drain" is incomplete — it should name the trap type and the rough-in distance, and those figures should match the plumbing drawings for your site.

Mixed projects are normal. Guest rooms on one floor may sit over a floor slab while a top-floor bathroom uses a wall outlet. If that applies to you, ask for both configurations to be quoted as separate lines with separate item codes, so nothing gets consolidated into one SKU at production.

3. Check the flushing design and what is claimed about water use

Washdown flushing uses a wide trapway and a wash ring to carry waste down quickly, which suits most residential and hotel layouts. The quotation should describe the flush mechanism, and if it states a per-flush water volume or a dual-flush button option, ask for the corresponding test documentation rather than accepting the figure on the line item alone. Where a supplier's own pages give different figures in different places, get the number confirmed in writing for your order.

4. Ask what is included: seat, fixing set, and connection parts

A toilet price can cover the ceramic alone, or ceramic plus seat, floor fixings, wax ring or seal, and the water connection set. Ask for an itemised inclusions list per unit, with the seat material stated (for example slow-close). Then check what is expected to be bought locally versus shipped. Rough-in parts and seals are often cheaper and faster to source near site, and getting that split wrong creates a holding cost on a container you did not plan for.

5. Read the packing specification, not just the carton count

Ceramics travel badly when packing is treated as an afterthought. Ask how each unit is protected — corner protection, internal bracing, glaze-facing orientation — and how many units go on a pallet or per carton. For mixed orders of bathroom sanitary fixtures, ask for the packing list format in advance so your receiving team can reconcile cartons against rooms rather than against SKUs.

6. Get the quantity break and MOQ in writing

Unit prices move with volume, and small projects often split an order across phases. Ask for the price break table, the minimum order quantity per model, and whether a phased release keeps the original price. Our custom and OEM service works with flexible minimum order quantities, so if your room count is unusual, say so early — it changes what is worth tooling or branding.

7. Match certification claims to documents

The 1003A is listed as CE certified. If your project requires specific marks for submission, name them in the enquiry and ask which certificates are actually held for that model, with validity dates. Do not assume a certificate shown on one product page applies to the whole catalogue; different models in the same category can carry different documentation.

8. Verify the delivery terms line by line

Compare quotes on the same Incoterm. A landed cost changes depending on whether the price is ex-works, FOB or door-to-door, and on who handles customs paperwork, cargo insurance and last-mile delivery to site. We arrange freight forwarding by sea, air and rail with commercial invoices, packing lists and certificates of origin, but duties, transit time and delivery scope should be confirmed for your specific destination in writing before you sign.

9. Ask how spares and claims are handled after handover

A hotel or apartment owner lives with this range for years. Seats, flush mechanisms and buttons wear before the ceramic does. The quotation or contract should state which spare parts are available for the model, in what quantity, at what cost, and for how long after delivery — plus who handles a damaged-unit claim once cartons have been opened across multiple floors.

10. Compare like for like before you choose on price

Put every quote into the same table: model code, trap type and rough-in, flush mechanism, inclusions, packing, price break, certificates, Incoterm, spares terms. In our own experience with project enquiries, the cheapest headline unit price is often the one where the seat, the fixings or the delivery scope was quietly left out.

If you are specifying ceramic WCs for a residential or hospitality fit-out, send us your drawings and room schedule through our contact page, and we will return an itemised quotation with trap options, inclusions and packing shown line by line.