A procurement brief that only says “high gloss melamine cabinets, as per drawing” will come back with three different quotations from three different factories — and none of them will be comparable. The gap is almost never in the door colour. It is in what sits behind that colour: the substrate, how the gloss surface is formed, which edge is used to close it, and who has signed off on the sheen and the hardware before production starts. The checklist below is the specification detail we ask our own kitchen project clients to fill in for high gloss melamine cabinets, so that every quotation lands on the same basis.
What a high gloss melamine door is actually made of
Two things get conflated in kitchen tenders. The first is the board — usually a particleboard or MDF core that carries the structure, holds the hinge screws and determines how well the door keeps square over years of humidity change. The second is the decorative surface laminated onto it, which is what your client sees and what the brief calls “melamine”. A short gloss melamine door is a straightforward combination. A tall gloss door on a bank of pantry units is not: the core has to be specified for size, the fixing method has to match the load, and the surface has to be able to survive being opened hundreds of times a day.
That distinction matters when you compare prices. Two suppliers can quote the same RAL colour at very different rates because one is laminating a denser core with a heavier decorative layer and a machined edge, while the other is not. Put both layers in the brief separately — core type and thickness, surface system, edge system — and the comparison becomes possible.
The six items that belong in the brief
1. Sheen level and colour reference. “High gloss” is a family, not a value. State the target sheen band you want approved, name the colour by RAL or NCS code, and require a physical door sample for sign-off rather than a render or a screen proof. Gloss reads differently on a 450 mm drawer front than on a 2,400 mm full-height door, so ask for the sample in the largest size you are buying.
2. Core and thickness. State the board type and panel thickness per element — doors, carcases, shelves — and state, door by door, which ones exceed the panel sizes your supplier treats as standard and therefore need a different core build or fixing pattern. Made-to-measure sizing is standard on our minimalist slab melamine cabinets and the rest of the melamine kitchen range, which is exactly why the size limits need to be settled in writing before drawings are issued.
3. Edge system. On a gloss door the edge is where quality shows first. Specify how the long edges and short edges are closed, who pays for the colour-matched joint, and what the acceptance test is: run a fingernail along the joint and it should not catch. Ask the supplier to state which edge system they will use on radiused or handleless profiles, because those consume more material and more labour.
4. Hardware schedule. Hinges, slides, lift systems, legs and brackets are usually quoted as an allowance, then upgraded later at a markup. Name the brand or the performance class per item, state soft-close where you want it, and confirm load ratings for drawer runs that will carry pots. Our built-in kitchen cabinet supply includes matching hinges, drawer slide rails, support legs and connecting brackets, so hardware belongs in the same line items as the doors — see custom built-in kitchen cabinets for hotel, apartment and residential work.
5. Handling, packing and site sequence. Gloss panels show handling marks long before installation day. Specify individual protective film on every gloss face, the carton and pallet build, corner protection, and — for multi-unit or multi-floor projects — the delivery sequence by flat or by level. This is a commercial line item, not an afterthought, and it changes container loading.
6. Acceptance criteria and snag process. Write down what you will reject: sheen variation between adjacent doors within one kitchen, visible edge joints, colour deviation from the signed sample, warping beyond the agreed tolerance. Then state who inspects, when, and how replacements are produced. A snag list with a named owner closes out faster than an argument on site.
Finish families to compare against the design intent
Once the specification above is fixed, swapping the surface becomes a controlled decision instead of a change order. Within our melamine kitchen collection you can specify two tone melamine cabinets where the island and tall bank need to read as separate volumes, wood grain melamine cabinets when a warm grain has to sit against a gloss accent, and textured melamine cabinets where fingerprints and light spill are the practical concern — corridor kitchens in serviced apartments, family villas, and any kitchen that will be photographed at dusk with downlights above it.
If the project calls for a deeper mirror-like surface than the melamine range delivers, we also supply high gloss acrylic cabinets. Specify both options in the same brief with the same core and edge requirements and let the quotation show you the real cost of the extra depth of gloss.
Working drawings, samples and sign-off
The order only becomes safe at three signatures: the signed door sample, the approved set of dimensioned working drawings, and the confirmed hardware schedule. Drawings should show elevations with appliance cut-outs and clearances, section details at the edge profile and at handleless reveals, service runs for integrated appliances, and a numbered schedule that ties every door to a room, a size, a finish code and an edge code. That schedule is also your snag list and your spare-parts reference years later.
We produce these cabinets under the same custom and OEM process used across our fit-out projects — custom and OEM service covers bespoke finishes, textures and prototyping before series production. Send us your brief and drawings and we will mark up what is missing, price the specification as written, and produce a sample door for sign-off before any panel is cut.
Send your cabinet specification to SANTERSON — furniture and building materials for villa, hospitality and office projects, with production, door-to-door delivery, installation and after-sales support under one contract.