A swim spa that looks right on a mood board can still stall on site if the slab, the power and the access route were never drawn around it. The Outdoor Swim Spa WS-S06M is a long-shell outdoor swim and hydrotherapy unit in our configurable range, and like the rest of that range it only behaves once three parties agree on the same numbers: the architect or interior designer, the landscape or civil contractor, and the factory that builds the cabinet. This guide walks through the drawings and site information we need from your team, stage by stage, so the unit arrives to a prepared pad rather than to a set of surprises.

Start From the Catalog Envelope, Not the Rendering

The first job is to convert a picture into an envelope. The catalog entry for WS-S06M lists overall dimensions of 5900 × 2200 × 1610 mm. Treat that as the shell footprint and height you must clear, then add what your own detail has to provide around it: working space for the pump and filter compartment, a path wide enough to carry the unit in, and clearance for anyone who later opens a service panel. Design drawings that show only the water surface tend to hide these three items, and they are exactly where site programmes slip.

Because our swim and hydrotherapy line is configurable, an early decision on the configuration should be recorded on the drawing itself, not left in an email thread. If your scheme calls for a different shell geometry, we also produce a Customizable Shape Outdoor Spa with personalised hydrotherapy layout in square, round, oval and curved forms — useful when the plan is driven by a terrace edge, an arched colonnade or an irregular courtyard.

What the Specification Sheet Actually Tells Your Engineers

The specification block published for this model is the document your electrical and plumbing consultants should be reading. For WS-S06M the catalog shows:

  • Model: WS-S06M
  • Catalog dimensions: 5900 × 2200 × 1610 mm
  • Control system: 1 set
  • Water pump: 2 pcs
  • Filter pump: 1 pc
  • Jet total: 48 pcs
  • LED lighting: 17 lights plus 17 small LED lights
  • Total power: 6.95 kW
  • Features shown: water jets, LED lighting, ozone, 4 water columns

Read those lines as inputs to a design, not as an installation instruction. The 6.95 kW figure is the catalog total for the listed configuration; your electrical drawing still has to state supply voltage, phase, circuit protection and the route of the sub-main from the switchboard. If the project adds a heat pump, UV sterilisation or sand filtration — all options in our accessory list — the connected load changes and the cable and breaker sizing change with it. We confirm the final electrical requirement against the configuration you select before production releases.

The same caution applies to the shell numbers above. The dimensions and equipment counts come from the catalog entry for this model; where a project needs them stamped on a construction document, we issue the confirmed figures for the ordered specification so that nothing in your drawing set relies on a marketing page.

Site Requirements to Settle Before You Order

  • Structure and support. Confirm with the civil or landscape engineer what base, pad thickness and levelling tolerance apply for a full shell of this size. We supply the unit; the load path, drainage falls and any perimeter framing are designed locally by your team.
  • Power provision. Show the isolator location, cable route and board schedule on the electrical drawing, sized for the confirmed configuration including any added heat pump or sterilisation option.
  • Access and crane or rigging path. A 5.9 m shell needs an unobstructed route from the delivery vehicle to the pad. Measure gates, side setbacks and overhead obstruction — wires, pergola beams, tree canopy — on site, not only on plan.
  • Drainage and overflow. Set out where splash-out, maintenance draining and rainwater leave the area, and keep access to the filter pump clear of finishes that cannot be removed.
  • Finishes interface. Agree who sets the coping, decking and any steps, and at what level relative to the shell height, so the paving detail is drawn once rather than adjusted on site.
  • Local approvals. Barrier, fencing and building approval requirements differ by state and council. These are your local authority's remit; allow for them in the programme rather than after delivery.

How Our Design and Production Team Joins Your Drawing Set

Coordination works best when it is scheduled rather than improvised. On a project we normally work through the brief and design proposal first, then quotation and detail confirmation, then production, shipment and follow-up. For a swim spa that means an early exchange of marked-up layouts — your team sends the site plan, levels and electrical note; we return the confirmed shell dimensions, plant access points and configuration details your consultants need to complete their drawings.

That exchange is also where options get locked down. Control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps are catalog-listed accessories, but availability and compatibility vary by model, so anything on your drawing must be matched to the configuration we are actually building. Adding an option after production has started is the most common cause of a re-cut panel or a delayed shipment.

Once the specification is frozen, our Custom & OEM Service covers the bespoke side of the same package — finishes and trims that tie the spa surround to the joinery and outdoor furniture already specified for the project. Freight, customs paperwork and door-to-door delivery are handled through our Logistics & Door-to-Door Delivery service, with sea, air or rail routing chosen against your site address and programme.

Delivery Sequence That Keeps the Site Programme Intact

Order of works matters more than people expect. The pad, power and drainage should be complete before the shell lands, otherwise a delivered unit sits on the verge while trades catch up. We schedule dispatch against the configuration and the site readiness date you confirm, then track the shipment through to the delivery point. On arrival, our Installation & After-sales Support covers on-site installation, inspection with a snag list, warranty coverage and spare parts — terms and response arrangements are confirmed in writing for each project, along with the installer arrangement for your location.

For villa and hospitality projects that also need the surrounding terrace furnished — loungers, pergolas, outdoor dining sets, the bathroom fit-out and cabinetry of the adjacent changing rooms — it is simpler to place one turnkey package than to run six suppliers against one another. As a China-based furniture and building materials manufacturer, we produce those categories in-house, so the swim spa, the deck furniture and the interior finishes come from one specification set and one shipment plan.

A Short Pre-Order Checklist for Specifiers

  • Configuration selected and written on the drawing, including any accessories.
  • Confirmed shell dimensions issued to the structural and landscape detail.
  • Electrical note sized for the confirmed configuration, with isolator location shown.
  • Rigging route surveyed on site with clearances recorded.
  • Pad, drainage and coping levels fixed before dispatch is booked.
  • Local approval requirements identified in the programme.

Catalog dimensions, equipment counts and power figures quoted here are transcribed from the published specification for WS-S06M. Included equipment, electrical requirement and accessory compatibility depend on the configuration ordered — request the confirmed specification sheet before any of these values appear on a construction document.

Send us your site plan, levels and electrical note, or the rendering you are working from, and we will return the confirmed specification for WS-S06M together with the coordination details your consultants need. Enquiries are handled by PHILLIP — phone / WhatsApp +86-13928214007, email santerson@qq.com, or through our contact page. Business hours Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).