A partition sliding system rarely fails on the drawing stage. It fails at handover, when the panels bind on the track, sit out of line with the adjoining wall finish, or arrive in a size nobody can adjust on site. If you are pricing Santerson Partition Sliding Systems for a villa or apartment package, the quotation itself tells you a great deal about how the rest of the order will run. The checklist below follows the order in which the items actually matter.

1. What size is being quoted: opening, panel or wall

These are three different numbers, and a quote that names only one of them is incomplete. The clear opening is what you need to pass through. The panel size is what moves on the track, and it always overlaps the opening at the edges. The overall wall width is what the track, the head detail and any return panels occupy.

Santerson lists these systems as made-to-measure, with finish, layout and dimensions specified per project, so a quote that carries a standard catalogue size rather than your dimensioned opening should be queried before you accept it. Ask for a dimensioned elevation showing the opening, the panel overlap and the track envelope, and check it against the architect's setting-out drawing rather than against a site tape taken at one height.

2. Track, hardware and how the system is supported

This is where configurable listings are thinnest, and where you should insist on detail. The product page for these systems asks buyers to confirm track, hardware and opening dimensions for each project, so treat those three as open items until they appear in writing.

  • Load path. Ceiling-supported or wall-supported, and what the supporting structure must be. A head fixing detail assumes a specific substrate; confirm yours matches.
  • Track specification. Profile, material, and whether it is exposed or recessed into a shadow gap or pelmet.
  • Hanging hardware and adjustment. Whether levelling is adjustable after installation, because on-site packing tolerances are rarely perfect.
  • Running gear. Soft-close, push-open or plain; the mechanism changes both price and how the system behaves daily.
  • Panel stops and end details. What stops the panel at each end of travel, and what finishes the reveal.

Ask which hardware is included in the quoted price and which is a priced option. A low unit rate that excludes the track set is not a low unit rate.

3. Panel construction, finish and edge detail

The Sliding Panel Systems collection covers several panel types, and they are specified differently even when the framing looks similar on screen:

For each panel, a usable quote states the substrate, the finish system, the edge treatment, and whether both faces are finished. A single-sided panel is fine when it faces a wall for most of its travel; it is a defect when it is a room divider seen from both sides. If you intend to mix types in one run — glass panels with textured end panels, for instance — ask how the frames and tracks are matched.

4. Acoustic and safety performance stated as configuration

Where a quote mentions sound reduction or glass safety, check what it is actually based on. For acoustic panels, ask which build-up the figure refers to and whether the perimeter seal, panel overlap and track detail are included in that assembly — an unsealed panel line loses most of its value in use. For glass, ask for the glass make-up and the safety requirement applied, since these listings leave glass type and safety requirements to be confirmed per project.

If your project has a performance specification issued by a consultant, send that document with your enquiry and ask the supplier to respond line by line. A quotation that answers the drawing but not the specification will not survive review.

5. Scope boundaries: what is excluded

Read the exclusions before the price. In partition work the usual gaps are:

  • Supporting structure, blocking and packing to receive the track.
  • Above-slab or ceiling preparation, pelmets and shadow gaps.
  • Site measurement and survey, if not already carried out.
  • On-site installation, making good and final finishes.
  • Interface with flooring, skirting and adjoining wall systems.

Naming these in the quotation is a good sign — it means someone has thought about the build. Ask who carries out site measurement before manufacture, since made-to-measure work ordered off drawings alone puts the adjustment risk on you.

6. Packaging, delivery and sequence

Sliding panels are long, flat and easily damaged at the edges, so packaging and handling deserve a line in the order. Ask how panels are protected and racked, how the crate list maps to the panel schedule, and what delivery terms apply to your site. Santerson's service pages describe freight by sea, air and rail with customs paperwork, container loading and door-to-door delivery; the practical detail — Incoterms, transit window, insurance and who receives the goods — should be confirmed for your specific shipment rather than assumed from marketing copy.

Also check the sequence. Track and hardware arriving weeks after the panels means an idle site. If the system is part of a wider fit-out, it is worth ordering it within the same package as wall panel systems and adjoining joinery, so reveals, shadow gaps and finishes are coordinated by one production schedule instead of reconciled on site.

7. Installation responsibility and after-sales terms

Ask who installs, who supervises, and what happens when a panel needs adjusting after handover. The company's service pages list on-site installation, inspection and snags, warranty coverage, spare parts and maintenance, but response times and warranty scope vary by project and region — get the terms that apply to your order in writing, including which parts are treated as wear items and how replacement hardware is sourced years later.

A useful test: ask what happens if one panel is damaged after installation. A supplier who can re-make a single panel to the same specification has a mature process; a supplier who quotes a full new set does not.

8. Assumptions, exclusions and validity

Every serious quotation carries an assumptions block. Read it. It should state the dimensions used, the finish standard, the tolerance applied, the basis of the price, and how long the price stands. Material and finish options are configurable on these systems, so a price is only as firm as the specification behind it. If you have not yet chosen the finish, ask for the base price plus priced options rather than one blended figure — that way a late finish change does not become an unexpected variation.

9. One supplier across the package

Partition sliding systems rarely stand alone. They sit next to storage walls, closet fronts and media panels, and any mismatch in reveal depth or finish tone shows up immediately. Santerson presents itself as a manufacturer and one-stop supplier covering furniture and building materials, with design coordination, custom and OEM work, logistics, installation and after-sales support under one scope — which is worth considering when the sliding system has to match sliding storage panels or a full-height wall in the same room. Consolidating that scope means one set of drawings, one production schedule and one party accountable for interfaces.

A short pre-order review

Before you sign, read the quotation once more with three questions in mind. Does every dimension trace back to a surveyed or agreed setting-out drawing? Is each performance claim tied to a stated build-up rather than a product name? Are exclusions named clearly enough that your trades know what they are covering? A quote that answers all three is usually a sign of a clean installation. One that answers none of them is not a cheaper system — it is the same cost with the risk moved to your site.

Send your drawings, opening sizes and performance requirements to Santerson and ask for a line-by-line response against them. That single step settles most of the questions above before you commit.