A wall panel that arrives chipped, scratched at the edges or with a damaged lacquer finish cannot be installed, no matter how well it was made. For project buyers ordering Santerson Matte Lacquer Panels for villas, apartments or hospitality rooms, packaging is not a detail left to the factory — it is a specification item that should be agreed in writing before production starts. This article sets out exactly what to confirm, so the panels reach the site ready for installation.

Why Lacquered Panels Need a Different Packing Conversation

Matte lacquer panels are finished surfaces. The visible face carries the colour and texture a designer selected, and it is usually the part that gets marked first in transit. Because these panels are made to measure for each project — panel size, layout and finish are all specified per space — a damaged piece cannot simply be replaced from stock; it has to be remade and re-shipped. That is why packaging questions belong in the order discussion, not after the goods leave the factory.

Three practical realities drive the packing decision:

  • Finished faces should never press against each other or against bare timber, because friction and pressure leave marks that matte surfaces show up clearly under site lighting.
  • Panel edges are the most vulnerable points during handling; a chipped corner on a feature wall is visible even when the face is intact.
  • Made-to-measure panels arrive in mixed sizes and thicknesses, so they must be packed in an order that matches how the installation sequence works on site.

What to Agree Before Production Begins

Buyers who specify packaging early avoid most of the claims that later turn into disputes. The following points should appear in the order confirmation for any panel package.

1. Surface protection method

Ask how the finished face is protected: protective film, interleaving sheets, corner guards or a combination. Confirm that the protection stays on through installation and can be removed cleanly, since some films leave residue once panels sit in a warm container for weeks.

2. Panel orientation and stacking

Panels travel flat or upright depending on size and the rest of the shipment. Both methods work when they are properly supported, so ask which method applies to your panel sizes, how many panels share one bundle, and whether bundles are strapped to a rigid base rather than stacked loose.

3. Bundle grouping against the installation drawing

For a project with several rooms or several units, request that bundles follow the room or unit breakdown on the wall layout drawing. When each bundle corresponds to one space, the site team unpacks only what it needs, and unfinished panels keep their protection until they are needed.

4. Marking and labelling

Every bundle should carry a marking that matches the panel schedule you approved — room reference, panel number and bundle number out of the total. Panels that arrive in unlabelled crates create avoidable installation errors, especially when several similar finishes are on site at once.

5. Moisture and container conditions

Sea freight moves goods through wide temperature swings, which produce condensation inside a container. Confirm that panels are packed with moisture protection and that the packing keeps them off the container floor. If your project also orders Wall Panel Systems or other joinery in the same shipment, ask how different items share one container without point loads pressing on panel faces.

Documentation That Supports a Claim

Packaging is also a paperwork matter. The packing list should show the same bundle numbers and quantities that arrive, because a mismatch is what tells you whether pieces are missing or simply in another crate. Santerson's Furniture Logistics and Door-to-door Delivery service covers packaging and container loading, customs paperwork and shipment tracking as part of the delivery scope, which means the packing list, commercial invoice and related documents travel with the consignment. Buyers should still photograph the crates on arrival, before opening them, and record any crate that is crushed or wet — this is the evidence a supplier needs to act on damage reports quickly.

A short pre-production checklist for panel orders

  • Protection method for the finished face, and whether it stays on during installation
  • Flat or upright packing, bundle size and strapping method for our panel dimensions
  • Bundles grouped by room or unit according to the approved wall layout
  • Room reference, panel number and bundle count marked on every crate
  • Moisture protection and floor clearance for sea freight
  • Packing list numbers that match the crate markings exactly

Confirming Specifications Before You Order

Because these panels are configured per project, packaging details depend on the specification you choose. Panel dimensions, thickness and finish selection all change how a bundle is built, so it is worth confirming dimensions and selected specifications for each project before asking for a packing proposal. If your scheme combines finishes — for example matte lacquer with Santerson Textured Panels on the same wall — say so in the enquiry, because mixed finishes in one bundle need separating so that textures do not press into each other.

The same applies to concealed details. Where a panel run includes an integrated door or an access panel, those components are packed and marked separately from fixed panels, and the site team needs to know which crate holds them before the wall closes up.

Getting the Packing Proposal in Writing

The practical step is simple: send your panel schedule and wall layout with the enquiry, and ask for a packing proposal that shows bundle grouping, protection method, marking system and total package count. Compare that proposal against your installation sequence before production starts. A packaging plan agreed at quotation stage costs nothing; the same conversation after panels have shipped costs a re-made set and a delayed handover.

Product dimensions, material and finish options, packing methods and delivery arrangements are confirmed per project with our team; specifications quoted for one scheme may not apply to another.