A short brief that says "smoked glass wardrobes, master bedroom, floor to ceiling" is not enough for a manufacturer to price anything. It tells us the look you want, but nothing about the wall it sits on, what goes inside, or how the unit reaches the site. This guide walks through the information we need at enquiry stage for Smoked Glass Wardrobes, and what you get back once that information is complete. If you are specifying joinery for a villa or hotel room in Australia, the same checklist applies whether you are one project or fifty rooms.

Start with the wall, not the door

Glass-front wardrobes read as a single surface, so people specify them as if they were a piece of loose furniture. They are not. Before we quote anything, we work from the space:

  • Overall width, height and depth of the recess or the wall run, measured at more than one point on each dimension. Out-of-square walls are common in older villas and in apartments where finishes were laid after the frame went up.
  • Ceiling type and whether the unit is expected to meet it flush, sit below a cornice, or fill a sloped ceiling.
  • Position of skirting, architraves, downlights, air-conditioning grilles, switches and power points relative to the run.
  • Floor finish and its thickness, plus whether the floor is tiled, floating or carpeted — this decides how the base sits and whether a plinth is needed.
  • Door swing and circulation: how much clearance a hinged door needs when open, and whether a sliding option fits better in a narrower room.

Send drawings if you have them. If you do not, photographs of the wall from both ends plus your own measurements are usually enough for us to start. Where a project is still at design stage, our interior design service covers space layout planning and 3D visual renderings before anything goes into production.

Decide what the wardrobe has to hold

The internal layout drives cost far more than the glass does, and it is the part most briefs leave blank. Tell us how the wardrobe will actually be used:

  • Hanging lengths — long space for dresses and coats, double hanging rails for shirts and folded tops.
  • Drawer count and depth, and whether you want shallow trays for accessories or deep boxes for knitwear.
  • Open shelving versus closed compartments, and how much of the run you want visible when the doors are open.
  • Lighting inside the carcass, including where sensors or switches should sit.
  • Extras such as pull-out hampers, trouser slides, jewellery trays, an ironing station or a vanity end.

For a shared master bedroom, split the run into two working zones with separate hanging heights. For hotel guest rooms, keep the layout simple and repeatable — fewer moving parts means less to maintain across many keys, and it keeps replacement panels straightforward years down the line.

Choose glass tone and frame together

"Smoked glass" covers a wide range of tint and reflectivity, and the result changes again depending on whether the panel is framed or butted into a solid surround. Our glass-door range includes Smoked Glass Wardrobes, Frosted Glass Wardrobes, Clear Glass Wardrobes, Bronze Glass Wardrobes and Ribbed Glass Wardrobes. If you want the glass set inside a metal profile, the Smoked Glass Aluminum Frame Wardrobes in our glass and aluminium frame collection give a slim shadow line around each panel.

Three practical points to settle at enquiry stage:

  • How much of the interior you want readable. Smoked and bronze tints show silhouettes rather than contents; frosted glass diffuses more evenly; ribbed glass breaks up what sits behind it.
  • Which side faces the room, since tint depth and reflections read differently against light walls versus dark joinery.
  • Frame colour and finish — matching the profile to ironmongery, lighting metal finishes or the bed frame usually matters more than matching it to the carcass.

Where a project needs something outside the standard palette, we handle bespoke material finishes and textures as part of custom and OEM work. Send the reference image and we will confirm what can actually be produced before you commit it to a drawing set.

What to put in the enquiry email

Use this as a checklist. A complete enquiry lets us come back with a real quotation instead of another round of questions.

Item What to send
Dimensions Width, height and depth for every run, noted at high and low points. Mark the finished-floor level.
Drawings or photographs Plans and elevations if available; otherwise photos of the wall plus your measurements.
Layout Rail lengths, shelf counts, drawer numbers, any accessories, and where they should sit.
Glass and frame Glass tone, framed or frameless, profile colour, and the ironmongery you are pairing it with.
Carcass material Board type and finish for interiors and any visible edges, plus your preference on hardware brand if you have one.
Quantities Number of rooms or units. Repeat quantities change both the price and how we schedule production.
Site and access Delivery city, floor level, lift dimensions or stair access, and any site restrictions on delivery hours.
Programme Your target on-site date and any trade milestones around it, so production can be sequenced properly.
One thing worth being explicit about: dimensions and selected specifications are confirmed for each project before manufacture. We do not build to a nominal size carried over from a previous job, even where the rooms look identical.

What happens after you send it

The route is the same one we run for villa and hospitality projects generally — consultation, design and planning, production, logistics, installation and after-sales.

  • Review and questions. We check the drawings against our own build requirements and come back with anything missing, usually within a day or two of a complete enquiry.
  • Quotation and detail confirmation. You receive an itemised price with the specification written out, so you can see exactly which glass, profile and hardware you are paying for. Nothing enters production until those details are signed off.
  • Production. Made-to-measure sizing means each unit is built to the confirmed opening, not adjusted on site.
  • Freight. We arrange sea, air or rail forwarding with the packing list and customs paperwork, and deliver door to door. Tell us your preferred Incoterms and we will price against them.
  • Installation and follow-up. On-site installation guidance, inspection of snags, then spare parts and maintenance support afterwards.

If you are coordinating several trades at once — cabinetry, doors, wall panelling, lighting — send those enquiries together. We supply across the whole fit-out, so a single coordinated package avoids the mismatched tolerances that appear when each element is bought separately.

Common reasons an enquiry stalls

  • A single measurement for a long run. One number across four metres hides a wall that drifts by 15 mm. Measure at both ends and at the middle.
  • Naming the finish but not the assembly. Smoked glass on a hinged door, a sliding door and an aluminium-framed panel are three different builds with different clearances.
  • No note about finished floor level. A unit specified to ceiling height without knowing the floor build-up either arrives too tall or sits short of the cornice.
  • Quantities left open. "Two for now, maybe more later" makes it impossible to plan material. Give us the full room count even if you release it in stages.

None of these are difficult to fix — they just cost a week each time they have to be asked about.

Send the brief

If you have drawings, measurements and a target programme, send them to us and we will come back with a specification and a price rather than more questions. We have been manufacturing furniture and building materials since 2008 and supply wardrobes, cabinetry, doors, wall panelling and lighting as one coordinated package for villa, hotel and office projects. Our Custom Minimalist Bedroom Wardrobe page shows how a made-to-measure brief is normally documented, and the services pages set out each stage from design through to after-sales support.