A classic panel hinged door looks simple from the front of a villa or hotel room: a frame, two or three recessed panels, a finish that matches the joinery around it. That simplicity is exactly why custom doors go wrong. Once production starts, the openings are already plastered, the floor levels are already set and the wall panelling is already fixed to the substrate. Anything you have not agreed in writing gets decided by whoever is standing at the machine. Below is the confirmation list we work through on residential door projects before a single panel is machined — and it is the same list whether you are ordering four doors for a villa or forty for a boutique hotel corridor.
1. The opening, not the drawing
Structural openings almost never match architectural drawings exactly. Before production we need dimensions taken from the finished build, not from a mark-up of a plan.
- Clear opening width and height at three points each (top, middle, bottom), recorded in millimetres with the tolerance band you expect on site.
- Floor finish build-up — screed, adhesive, tile or engineered flooring, skirting profile — because a door that clears a bare slab can bind on the finished floor.
- Wall make-up on both faces: plasterboard on studs, solid masonry, timber battening, or a wall panel system. This decides jamb depth and how the architrave sits.
- Squareness and plumb of the reveal, plus which side of the opening the hinge stiles will land on if the two faces are not parallel.
For our Classic Panel Hinged Doors line, sizing is made to measure for each project, so these figures come back as a door schedule rather than a set of standard sizes. If you send an opening schedule instead of site-verified dimensions, we will flag it before quoting — not after.
2. The panel itself: profile, construction and grain
"Classic panel" covers a wide range of details, and two doors can look completely different at the same overall size. Agree these points before a sample is cut:
| Item to confirm | What to specify |
|---|---|
| Panel profile | Raised, recessed or flush panel; the moulding profile drawn or referenced from an approved sample; number of panels per leaf. |
| Stile and rail widths | Top rail heavier than mid rails, or equal divisions. This is where period styling lives, and it changes with door height. |
| Core and construction | Solid timber, engineered substrate with veneer, or a composite core. State which one you are pricing; do not assume the buyer knows. |
| Veneer grain direction and matching | Vertical grain on stiles, horizontal on rails, book-matched or quarter-cut. For a run of doors in one corridor, say whether leaves must match each other. |
| Edge detail | Arrises eased or sharp; edge banding material where a veneered leaf is used. |
Where the design intent is a wood appearance rather than solid timber, our Wood Veneer Hinged Doors sit in the same collection with their own finish and layout options — but the veneer species, cut and grain run have to be named on the order, because a species name alone does not tell the shop how to lay up a batch.
3. Finish: sample first, then the standard of comparison
Colour names do not travel between factories. Confirm the finish by physical sample and record what the approved sample actually fixes.
- Lacquer or paint system, sheen level, and whether the specified sheen applies to flat panel faces as well as moulded profiles.
- For painted doors: number of coats, and how the recessed corners of a panel profile are filled — corners read darker than flat faces on any colour.
- For stained or veneered doors: the approved physical sample kept on file, with a note on acceptable variation across a batch where the material is natural.
- Which side of the leaf is the show face, and what finish the reverse carries when both faces are visible.
4. Hardware interface — the most common source of rework
The door and the ironmongery are usually bought by different parties, and each assumes the other will accommodate it. Confirm all of this at the same time as the door schedule:
- Lever handle height, lock case backset, and whether the lock is a tubular latch or a mortice case.
- Hinge type, count, position and finish; hinge leaf thickness and whether hinges are butt, concealed or pivot.
- Whether hinge faces need reinforcement for heavy leaves or for high-frequency use in hospitality areas.
- Door closer, door stop, threshold and acoustic or smoke seal requirements — where these apply, they must be stated by your project team, not assumed by us.
- Any fire, smoke or acoustic rating called up by your design and local code. We do not certify performance a project has not specified; the rating has to come from your side and then drive the leaf construction, seals and hardware together.
Where the schedule also includes Standard Interior Hinged Doors alongside panelled leaves, keep one combined door schedule with a single numbering system. Mixed schedules with two numbering conventions are how wrong doors end up in the right rooms.
5. How the door meets the rest of the joinery
A panelled door rarely stands alone. It reads against architraves, skirting, wardrobe fronts and wall panelling, and it is judged on how those details line up.
- Architrave profile and width, and whether the same profile runs around every opening on the floor.
- Jamb depth tolerance where reveal sizes vary between openings.
- Whether the door should match adjacent Classic Paneled Solid Wood Wardrobes or other cabinetry in colour only, or also in profile and grain.
- Where a concealed or flush detail is wanted instead, that decision belongs to the door selection stage — see Flush Wall Aligned Doors rather than changing a panelled leaf late.
6. Quantities, phasing and site handling
Production questions are also logistics questions:
- Total quantity by door type, plus spares — usually one or two leaves per type for a project of any size.
- Delivery phasing against the site programme, so early rooms can be fitted and signed off while later leaves are still in production.
- Packaging, pallet configuration and container loading plan, matched to how your site stores doors and how long they sit before hanging.
- Storage conditions on site. Veneered and solid leaves need acclimatisation and dry storage; a container sitting open in the sun is not storage.
These are the points our Custom & OEM Service covers from design through production, and delivery planning continues under Logistics & Door-to-Door Delivery. Tell us the programme you are working to and we will confirm what is achievable against it before you commit it to a client.
A short pre-production checklist
- Site-verified opening dimensions, floor build-up and wall make-up recorded per opening.
- Door schedule with one numbering system, leaf by leaf, including hand and swing direction.
- Panel profile, stile and rail widths, core construction and veneer grain direction agreed.
- Signed sample leaf for finish, sheen and colour.
- Hardware schedule: lock, hinges, closers, seals — with ratings stated by your team where required.
- Interface details with architraves, skirting and adjacent joinery.
- Quantities with spares, delivery phasing and on-site storage expectations.
Send us the door schedule and opening dimensions you have so far, even if incomplete — we will mark up what is missing before production rather than after. See the Classic Panel Hinged Doors product page or contact our project team through the Contact page to start a confirmation round.