Wooden sliding panels solve a problem that every villa and hospitality project runs into sooner or later: how to close off an opening, hide storage or divide a room without spending floor area on a door swing. They look simple on a drawing — two or three tall leaves gliding across a wall — which is exactly why their quantities are so easy to get wrong. A panel order that reads neatly on a schedule can still arrive with the wrong number of leaves, an unfinished track run, or a finish that no longer matches the joinery beside it.
This guide walks through how we count panels and their related items, and how those items are coordinated with the rest of the fit-out so that everything lands on site in one workable package.
Start With Openings, Not Panels
The quantity of panels is decided by the openings they serve, so begin by listing every opening that will be panelled. For each one, record the clear width and clear height at three points across the span — left, centre, right — because walls are rarely square, and a variation of a centimetre or more across a wide run changes what the track can accept. Note the ceiling line as well: floor-to-ceiling panels need the slab level checked, not just the floor finish.
Then confirm the return depth available on each side of the opening. A sliding leaf has to stack somewhere. If the wall beside the opening is shallow, the panels cannot overlap the wall face and you will need a different stacking arrangement or a pocket detail. This single check removes most of the rework that appears later in a project.
Our Wooden Sliding Panels are made to measure for each opening, with the layout and finish specified per project rather than chosen from a fixed module. That flexibility only pays off if the dimensions you send are the final ones, taken after flooring, plasterboard and any wall finishes are complete.
How Panel Leaves and Hardware Are Counted
Count in leaves, not in square metres. A wide wardrobe opening covered by two overlapping leaves is a different order from the same opening with three leaves — different leaf widths, different track lengths, different stoppers. Decide the overlap before you count.
| Item | How it is counted | What to confirm before ordering |
|---|---|---|
| Panel leaves | One per panel, by opening; state leaf width and height for each | Overlap between leaves, floor-to-ceiling or sill-height, single or double sided finish |
| Track and rail | Linear run per opening, plus any return into the stacking zone | Whether the track is exposed or recessed; ceiling height tolerance |
| Hanging gear, rollers, stops | Set per leaf, matched to leaf weight and size | Load rating for tall leaves; soft-close requirement |
| Handles and edge detail | Per leaf, or integrated recessed pull | Whether a handle breaks the flush look of the wall |
| Wall returns and closing trims | Linear metres per opening | Which side is visible; how the panel meets adjacent panelling |
Keep the hardware on the same order as the panels. Rollers and tracks are specified against leaf weight, and a heavy full-height timber leaf on understated gear will sag and bind over time. If you order the leaves first and source the gear locally later, nobody is accountable for the match.
Coordinate the Panels With the Rest of the Wall
Sliding panels almost never stand alone. They sit inside a wall that also carries fixed panelling, storage carcasses, doors and sometimes lighting. Coordination is where a supplier who handles both joinery and wall finishes saves real time, because the same shop draws, machines and finishes the whole run.
Panelling and finish continuity
Where a sliding panel abuts fixed panelling, specify both from the same batch. Veneer matching is a batch question more than a species question — two panels of the same species cut from different logs will read as two different walls under lobby lighting. Our Wood Veneer Panels and Textured Sliding Panels are ordered against the same finish schedule, so grain direction, sheen and edge profile carry across the whole elevation.
Storage behind the panels
If the panels close off storage, design the interior first. A closet sliding panel arrangement has to clear rails, drawers and any internal lighting, and a leaf that overlaps the opening can block a drawer from opening fully. We set out the interior carcass and the panel run together so the two do not fight each other.
Room dividers and larger spans
For dividing a space rather than closing an opening, partition sliding systems change the quantity logic: you count stacked leaf packs and the floor guide position, and you check the deflection of the header above, since a long unsupported rail will show as a visible lean at the top edge. Where acoustic separation matters, confirm the required performance for the chosen configuration with us before the layout is fixed.
Panels over media and screens
Sliding panel TV systems add electrical coordination: the screen position, cable route and ventilation behind the panel must be set before the leaf size is fixed, and one that sits so close to the display leaves heat nowhere to go.
Sequencing Panels Into a Project Package
For a villa or apartment package, panels should be ordered in the same release as the other built-in joinery — wardrobes, tall cabinets, media walls — because they share finishes, hardware and shipping. Splitting them out into a separate later order is the most common way a project ends up with two slightly different whites.
| Stage | What should be settled |
|---|---|
| Design freeze | Opening list, leaf layout per opening, finish schedule shared with panelling and cabinetry |
| Site verification | Final dimensions after flooring and wall finishes; floor level and header deflection checked |
| Production | Panels produced with the matching joinery run, same batch for veneer and lacquer |
| Packing and shipping | Tall leaves packed vertically, hardware kits labelled per opening, quantities listed on each crate |
| Installation | Track set and levelled first, leaves hung and adjusted, then seals and trims |
Packing deserves a line of its own. Full-height timber leaves travel badly in flat stacks; they crack at the corners. Ask for vertical racking, corner protection, and a crate list that names each opening so the fitter on site is not sorting twenty similar-looking panels by guesswork.
A Short Pre-Order Checklist
- Opening widths and heights recorded at three points, after finishes are complete
- Stacking zone confirmed on each side of the opening, including wall return depth
- Leaf count and overlap drawn per opening, not estimated from a schedule total
- Hardware specified against leaf weight and ordered on the same purchase order
- Finish matched to adjacent panelling and cabinetry from the same production batch
- Interior layout behind the panels resolved, with drawer and door swing clearance checked
- Header deflection and floor level verified for long unsupported spans
- Crate list keyed to opening references so installation can proceed room by room
Ordering Panels as Part of a Whole-Fit-Out Package
SANTERSON has been manufacturing furniture and building materials since 2008, and the sliding panel systems leave our workshops alongside the wardrobes, media walls, panelling and doors they are installed against. That is a practical advantage rather than a marketing one: one drawing set, one finish schedule, one batch of veneer, and one shipment covering the wall as a whole.
Send us your opening list, the finish references for the surrounding joinery, and the interior layout behind each panel. We will prepare a leaf-by-leaf quantity schedule with track lengths and hardware sets so you can see exactly what is being produced before it enters the factory schedule.
Planning a package that includes sliding panels alongside other built-in joinery? Contact our project team with your drawings and we will put together a coordinated quantity schedule for the whole wall. Before ordering, confirm the final opening dimensions and the selected hardware with us so each configuration is checked against your project.