A design brief that reads well in a presentation deck often stops working the moment it reaches a wardrobe workshop. The renderer shows a two-tone front elevation, but the manufacturer still needs to know where the doors swing, which panel carries which colour, how the unit meets the skirting, and what sits inside. This guide walks through the information that turns a Two Tone Hinged Wardrobes concept into an enquiry a factory can price and build without a week of email questions.

Why hinged doors change the conversation

Hinged door wardrobes open on hinges, so every door needs clearance in front of it. That single fact drives three decisions your brief has to answer: the aisle in front of the run, the position of adjacent furniture and beds, and whether a corner can be reached at all. In tight bedrooms, designers often switch to sliding fronts; when they keep hinged doors, they are usually choosing flush, handleless faces, a full-height reveal, or a door that reads as wall panelling rather than furniture.

Two-tone detailing adds one more requirement. With two colours on one elevation, the boundary between them has to be resolved before pricing: whether the split runs horizontally across a rail line, vertically along a stile, or wraps around a return. A brief that shows the split on one door but not the next leaves the workshop guessing. Where aisle space will not allow a full swing, the Two Tone Sliding Door Wardrobes line covers the same two-tone idea on a tracked front, which is worth checking against your floor plan before you commit to hinges.

What your brief should already contain

Before you send anything, check that the drawing set answers these points. Most delays in built-in joinery enquiries come from missing room information, not missing product information. The Interior Design Services team works from space layout planning through to production coordination and on-site guidance, so a scheme that is still at concept stage can be developed into buildable drawings rather than being quoted straight from a mood board.

  • Room elevations with overall run lengths, ceiling heights and the position of skirting, cornices, architraves and any bulkhead.
  • Floor and wall finishes, with their installed thicknesses, so the scribe and plinth detail can be worked out.
  • Door count and door widths, plus which side each hinge is on and where two doors meet in the middle of a run.
  • The exact two-tone split: which panels are light, which are dark, and whether the split continues across returns, corners and the ends of the run.
  • Interior zoning per bay — hanging heights, drawer banks, shelves, shoe or accessory storage — with anything that must sit at a specific height noted.
  • Lighting intentions inside the carcass and whether power needs to be routed to the wardrobe.

Specifying the two-tone front without ambiguity

Colour language is where briefs go wrong. A Pantone or RAL reference tells a painter what to mix; it does not tell a board supplier which laminate, lacquer or veneer to apply, and the same colour reads differently on a matt surface than on a high-gloss one. For project work, name the finish family first and the colour second.

SANTERSON wardrobe fronts can be specified across several finish families, each with its own two-tone behaviour. Two Tone Lacquer Wardrobes give a smooth, continuous film finish, which suits handleless fronts and hard shadow lines between the two tones. Two Tone Veneer Wardrobes pair a timber face with a painted tone, where grain direction has to be stated on every panel. Two Tone Acrylic Wardrobes are chosen when a deep reflective surface is wanted on the dominant tone. If your brief mixes families, say so explicitly — a matt carcass with a gloss door and a veneer return needs to be listed panel by panel.

Interior layout: describe habits, not just shelves

Workshops price interiors by module, so vague notes such as "plenty of shelving" produce a quotation you cannot compare with another supplier. State the use for each bay. Long hanging for coats and dresses needs one clear drop; double hanging for shirts and folded stacks needs two shorter ones. Drawers below knee height are comfortable; drawers above shoulder height waste money.

For villa and apartment bedroom work, Custom Minimalist Bedroom Wardrobe detailing — flat panels, clean lines and optional handleless fronts — is a practical way to keep a two-tone elevation quiet while still carrying hanging zones, drawer banks and shelf storage in the carcass. If the bedroom has a dressing area rather than a wall run, look at the Boutique Style Walk in Wardrobes range before committing to hinged doors, since aisle width and island clearance change what the doors can do.

How made-to-measure production works with your drawings

SANTERSON is a China-based furniture and building materials manufacturer supplying project customers in villas, hospitality and offices. Wardrobe product lines are listed as made-to-measure: sizing, material and finish options, and layout are set per project, with dimensions and selected specifications confirmed for each job before production. In practice that means your drawings drive the build, and the factory returns shop drawings for sign-off.

Wardrobes sit inside the wider Built-in Furniture range, alongside cabinetry and joinery that often belong to the same package. Coordinating them with the rest of the fit-out — kitchen fronts, wall panelling, doors, flooring — avoids the situation where a wardrobe tone matches the sample board but not the already-installed skirting. The Custom & OEM Service covers bespoke finishes and textures, prototyping and material selection across wood, metals, laminates and engineered surfaces.

What to send with the enquiry

A complete enquiry lets a manufacturer quote in one pass rather than three. Assemble:

  • Marked-up elevations showing door splits, hinge sides and the two-tone boundary on every bay.
  • A schedule listing each run: length, height, depth, door count, finish family and colour reference per panel group.
  • Interior zoning per bay with heights for hanging rails, shelves and drawer banks.
  • Notes on site conditions — uneven walls, low ceilings, existing skirting to be cut back, floor build-up yet to be laid.
  • Delivery location, access constraints and the sequence in which the wardrobes must arrive relative to other trades.

Project logistics matter as much as the panel spec. Freight by sea, air and rail, customs paperwork and door-to-door delivery are part of the service scope, and installation support with inspection and snagging is available at handover. Confirm shipping terms, access and installation sequence for your own site rather than assuming a standard arrangement.

Five questions to expect back from the factory

  1. Which surface is the dominant tone on the end panels that face into the room?
  2. Are doors full-height, or is there a separate upper cabinet with its own door line?
  3. What is the finished floor level, and has it been set out on site?
  4. Do internal carcass panels match the exterior tone, stay neutral, or use a third colour?
  5. Is there a required clearance for adjacent doors, drawers or a bed when the wardrobe fronts swing open?

Answer those five in the first message and the enquiry moves straight to shop drawings. That is the difference between a brief that describes a look and a brief that produces a buildable Two Tone Hinged Wardrobe for the room it belongs to.

To discuss wardrobe sizing, finishes and project packages, contact SANTERSON — Contact Us.