An integrated basin looks simple on a rendering: one slab, one shallow bowl, no visible seam. On site it is the opposite. The basin, the countertop, the cut-out, the waste position and the vanity carcass all have to agree before a single panel is cut. That is exactly why buyers increasingly ask for these units as OEM products rather than picking a stock sink off a shelf.

What an integrated basin actually is

An integrated basin is a washbasin formed from the same material and often the same single piece as the countertop, so the bowl and the deck read as one continuous surface. It sits in a different group from an undermount basin, which is a separate basin bonded underneath the deck, or a vessel basin that rests above it. Where those two leave the countertop to be decided independently, an integrated unit forces both decisions at once — which is why it rewards a manufacturer who can machine to drawing.

Our own version, the Integrated Basin, sits in the Countertops & Basins collection and is offered with made-to-measure sizing, material and finish options, and a layout tailored to the project. No fixed dimension list is published for it, because each unit is confirmed per project.

Why OEM instead of a catalogue item

Three practical reasons push buyers toward OEM sourcing on this product category:

  • The dimension is rarely standard. Villa bathrooms and hotel guest rooms are built around whatever the architectural drawing gave them. A unit that has to fit between two finished walls, or wrap a corner, cannot come from a fixed size grid.
  • Finish consistency across the job. When the same stone or engineered surface appears on vanities in forty bathrooms, matching tone and veining is a production task, not a shopping task. Stone & marble surfaces specified for a project are cut from batched material rather than bought one piece at a time.
  • Your brand on the goods. Developers, contractors and retailers sometimes take the units under their own label. Our Custom & OEM service covers bespoke finishes and textures, OEM manufacturing, flexible minimum order quantities and brand customisation such as engraving or packaging — details on the Custom & OEM Service page.

Where the unit is part of a whole bathroom fit-out, the same logic applies one level up: a integrated countertop vanity or a double basin countertop carries storage, tapware holes and waste routing as well, so it is usually ordered in the same batch as the basins.

The OEM sourcing path, step by step

StageWhat you sendWhat comes back
1. Brief and drawingsRoom dimensions, elevation or reflected ceiling plan, count of units by type, target material familySpecification review, questions on anything the drawing leaves open
2. Specification and quotationConfirmed sizes, edge profile, basin depth, tap and waste positions, finish sample choicePriced specification per unit type, with the assumptions written down
3. Sample or prototypeApproval of material sample, and where relevant a first article for fit checkSample or prototype unit, plus signed-off shop drawings
4. ProductionPurchase order, released drawings, batch quantitiesProduction progress, packing list by room or floor
5. Freight and handoverDelivery address, import details on your sideBooking, documents, tracking; installation guidance at site

The step most buyers skip is the third one. On an integrated basin the cut-out and the waste outlet cannot be corrected on site the way a separate sink can, so shop-drawing approval before production is what protects the whole order.

What has to be agreed before production starts

  • Finished dimensions of the deck, including any return or splashback, and the thickness you want at the edge.
  • Basin internal depth and the position of the overflow, if your design uses one.
  • Tap hole count and set-back, plus whether wall-mounted or deck-mounted tapware is being used — these change each other.
  • Waste type and outlet position, matched to the trap route already in the floor or wall.
  • Support method: the carcass or bracket system carrying the slab, since an integrated top is only as good as what holds it.
  • Packaging and pallet marking by room or floor, which turns unloading on site into a ten-minute job instead of a sorting exercise.

For multi-unit jobs we pack to the room schedule rather than to production order, and every unit ships with its confirmed dimensions on the label. Confirm the final specification for each configuration before release; nothing in this article should be read as a published dimension or material guarantee.

Working with one supplier across the fit-out

Bathrooms rarely stop at the basin. Tapware, mirror cabinets, vanity lighting, wall-hung WCs and cabinetry all touch the same wall, and when they come from different vendors each one inherits somebody else's tolerance. Coordinating them under one production programme removes that argument. Our one-stop solution covers design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, then installation and handover — the same route we follow on villa and hospitality work in Australia, including projects in Sydney, Melbourne, Perth and Willoughby.

Freight is arranged by sea, air or rail with the export paperwork and container loading handled on our side; Australian import terms, duties and delivery scope are confirmed per project rather than assumed.

Before you send an enquiry: have the reflected plan, the unit count by type, your preferred material family and a target installation month. Those four items let us quote a real specification instead of a range.