A wardrobe enquiry that only says "frosted glass, aluminium frame, three doors" is not enough to put into production. Because our frosted glass aluminium frame wardrobes are made to measure — with the finish, layout and dimensions specified per project — the accuracy of your drawings decides whether the unit fits on site or arrives as an expensive problem. The list below is what we work from when a residential wardrobe package moves from enquiry to quotation, and it is the same information that keeps production coordination, freight planning and installation on the same page.

Start with the room, not the door layout

Send the shell dimensions of the wall the wardrobe occupies before we talk about styles. For each wall run we need:

  • Overall run length, floor to finished ceiling height, and available depth — all measured at the finished surface, not the structural slab or bare blockwork.
  • Height taken at several points along the run (left, centre, right). Floors and ceilings in new builds are rarely level, and a single measurement assumes they are.
  • Position of skirting, cornices, architraves, power points, switches, air-conditioning outlets and light fittings, with their heights from the floor.
  • Doors, windows, radiators or returns that intrude into the run, plus any column or bulkhead that reduces clear depth.
  • Whether the unit is butted into a corner, and if so whether both walls are square to each other.

Depth needs one decision in particular: where the carcass stops and the door starts. An aluminium-framed glass door travels on its own plane outside the carcass, so the door build-up sits in front of the case depth. If a corridor or bed-side clearance is tight, tell us the minimum walkway you need to keep — that number usually drives the case depth more than storage preference does.

Level, plumb and floor finish: the three numbers that cause most site failures

Made-to-measure joinery is built to a fixed rectangular envelope. When the building is out of square, that tolerance has to be absorbed somewhere, and it should be absorbed deliberately rather than on site with a saw.

Input we ask for Why it matters
Floor finish build-up at the wardrobe line, and whether tiles, screed or levelling compound are already laid A carcass measured before tiling is short by the thickness of adhesive and finish once the tiles are down.
Measured deviation from level and plumb at each end of the run Tells us where to place scribes and filler panels so the out-of-square is hidden in a reveal, not visible along the door line.
Wall construction type and whether it can carry fixing loads Determines fixings and whether additional support or floor-mounted restraint is needed for a full-height run.
Ceiling type — plasterboard, exposed slab, coffered, or with a shadow gap Decides between a scribed top panel, a filler to the ceiling line, or a deliberate reveal.
Photographs of each wall, plus one photo taken from the standing viewing position Reveals obstructions and surface conditions that dimensions alone do not show.

If a site visit is possible, take dimensions after all wet trades and floor finishes are complete. If the wardrobe must be ordered earlier — which happens on most programmes — send provisional dimensions together with the finish build-up so we can allow for it in the drawing rather than leaving you to trim on site.

Door geometry: how the frame and glass actually open

The door is where an aluminium-framed wardrobe earns its look, and where most of the detailing decisions sit. For each elevation we confirm:

  • Opening type. Hinged, sliding or open. Sliding runs need a track depth and an even number of overlapping leaves; hinged runs need clearance for the swing.
  • Panels per elevation and leaf width. Leaf width affects track loading and how the handles sit relative to the bed or aisle.
  • Framing profile. Slim aluminium framing, a wider frame, black-framed detailing or a timber-look finish — each changes sightlines across the frontage. See smoked glass aluminium frame wardrobes and clear glass aluminium frame wardrobes for the same construction with different glazing.
  • Glass specification. Frosted, ribbed or clear; and whether frosting covers the whole leaf or only part of it. Frosted and ribbed glass hide the contents, which is usually the reason a buyer specifies them over clear glass in a bedroom.
  • Handle strategy. Integrated frame profiles can carry the handle; a handleless front needs a different edge detail and clearance for fingers.

Send the finish you want on both sides of the leaf where relevant. In an open-plan layout or a room divider, the reverse face is visible from another space, and glazing choice has to work from both directions.

Internal layout: measure it from your storage habits

Interior zoning comes from how the wardrobe is used, not from a standard module. We ask for a room-by-room list of what has to be stored, and then set hanging heights around that:

  • Long-hang section height for coats and dresses, measured against the longest garment you actually own.
  • Double-hang sections for shirts and shorter items, with a clear drop allowance between rails.
  • Drawer count and drawer type — shallow for accessories, deep for knitwear — plus whether drawers sit under hanging zones or in a bank beside them.
  • Shelf spans, and whether they need to carry cases or heavy items, which affects span and support.
  • Open display bays, glass-fronted sections or lighting inside the carcass, if any part of the interior is meant to be read as display rather than storage.
  • Shoe, luggage and ironing positions, since these drive base and top-of-unit heights.

Where a run has to work harder — a corner, a short alcove, or a wall that also carries a desk or vanity — say so at the drawing stage. Modular and glass walk in wardrobes can absorb these combinations, but only if the zoning is resolved before panels are cut.

Project inputs beyond dimensions

For apartment blocks, villas and hotel room floors, the quantity dimension matters as much as the individual one. Please include:

  • Unit count per wardrobe type, and a schedule that groups identical runs so repeat units are produced consistently.
  • Room-by-room finish schedule, including how the wardrobe fronts relate to other joinery in the same project — kitchen cabinetry, vanity units and wall panelling all read better when their finishes and shadow gaps are specified together. Our built-in furniture range covers these complementary items.
  • Programme dates: drawing approval, production window, ship date and site access date. Built-in joinery has to arrive when the room is ready for it.
  • Access route to the room — lift car dimensions, stair widths, corridor turns and door leaf widths. A full-height panel that will not fit the lift becomes a site problem in a single piece.
  • Who installs: our team on site, your contractor, or a local joinery crew working from our drawings. Each needs a different level of drawing detail.

For bespoke material, finish and branding requirements, the specification stage is covered by our custom furniture design and prototyping service, where finishes, textures and hardware are confirmed before panels go into production. Installation and post-handover support are described separately under furniture installation for interior projects.

A note on tolerances. Confirm the final dimensions and selected specifications in writing before production starts. Where site conditions are still open — an unfinished floor, an unresolved ceiling detail — we record them as provisional on the drawing so that the change is visible and priced rather than discovered at handover.

What a good first enquiry looks like

A workable enquiry usually contains: room elevations with finished-surface dimensions, three heights per run plus deviation notes, floor finish build-up, wall construction, an obstruction list with positions, door type and leaf widths, glazing and frame finish, an internal zoning list, unit quantities, programme dates and access constraints. Photographs of each wall cost nothing and settle most arguments before they start.

Send us what you have — even if it is a sketch with measurements on it — and we will mark up the gaps and return a drawing for your approval before anything is cut. That single confirmation step, done properly, is what makes made-to-measure wardrobes land correctly on site.

Planning a wardrobe package for an apartment, villa or hotel project? Send your drawings and site dimensions to the SANTERSON project team and we will specify the frame, glazing and internal layout against your programme — from manufacture through door-to-door delivery and installation.