A swim spa quotation only holds up when the specification behind it is unambiguous. Two projects can both ask for a seven-metre outdoor swim spa and end up with different shells, pump sets, power loads and freight arrangements. The Outdoor Swim Spa WS-S07B is a useful reference point here because it sits in the middle of our configurable swim and hydrotherapy range: enough standard content to quote from, and enough optional equipment that a vague enquiry turns into an incomplete order. Below is the specification structure we ask buyers, contractors and design teams to fill in before a price or a production slot is confirmed.
Start with the shell envelope, not the model code
The catalogue entry for WS-S07B lists a shell of 7000 × 2200 × 1335 mm. Treat those numbers as the reference envelope for this model, then confirm them against your site before anything is cast or shipped. Three measurements decide whether the unit can physically arrive and be positioned:
- Footprint on the pad — overall length and width, plus the working clearance you want on the access side for the filter pump and control system.
- Rim height and water depth — the 1335 mm shell height sets entry height, seating depth and how the coping or deck edge is detailed.
- Route to position — gate width, turning radius, crane or forklift access, and whether the unit arrives as one piece or is assembled on site.
Send the deck plan or a marked-up site drawing with your enquiry. A dimensioned sketch tells us more than a model number, because it shows whether you need steps on the short side, a recessed installation, or a raised deck arrangement with an overflow edge.
Split standard content from optional equipment
The specification published for WS-S07B lists one control system, three water pumps, one filter pump, 48 jets in total, LED lighting with small accent LEDs, and a total power figure of 13.35 kW. Features shown are water jets, LED lighting, ozone and a waterfall. Those items form the baseline you can compare between models — but they are not automatically what arrives on your project, because jet counts, pump quantities and power figures change with the configuration you select.
| Specification line | What to state in your enquiry |
|---|---|
| Shell dimensions | Length, width, shell height; recessed or above-ground; coping and deck detail |
| Control system | Number of sets, control location, whether the controller sits inside or outside the plant space |
| Pumps | Water pump quantity, filter pump quantity, duty cycle, spare pump if required |
| Jet package | Total jet count and the zones they serve: seating, back, leg, hydrotherapy bench |
| Water features | Waterfall type and position, water columns, any feature you want added to or removed from the standard list |
| Lighting | Main LED count, accent LED count, colour or fixed white, switching arrangement |
| Water treatment | Ozone on this model; add UV sterilisation and sand filtration if your programme needs them |
| Power | Total connected load, supply voltage and phase at site, dedicated circuit and protection device |
Write each line as a quantity plus a description, not as an adjective. "48 jets arranged across two seating banks" is quotable; "lots of jets" is not.
Decide the swim-training question early
The published specification for WS-S07B does not list a swim training system, while the closely related variant on the same seven-metre shell does. If your programme includes lap swimming or resistance training against a current, say so at the start of the enquiry rather than after the quotation, because the swim unit changes pump arrangement, power load and the plant space you plan around. Where a current is not required, the jet and waterfall configuration carries the leisure and hydrotherapy side of the brief.
Electrical, insulation and siting details
Power is where most swim spa enquiries stall. The total power figure on a product page is the connected load for that configuration; it is not advice about your supply. For every project we need:
- Site supply details: voltage, phase, frequency, and available capacity at the distribution board.
- Cable route and length from the board to the plant area, so voltage drop can be checked.
- Whether a heat pump is included, since heating changes both the load and the plant layout.
- Insulation package, and whether the spa sits in a shaded or an exposed position.
Local electrical and building requirements sit with your engineer or local contractor. We supply equipment, wiring diagrams and installation guidance; approvals with your local authority need to be arranged on your side.
Optional accessories to price in the same pass
Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs confirming against the selected configuration. Adding them to the first enquiry rather than as a later variation keeps one production run, one packing list and one container plan instead of three.
If your project also covers the surrounding terrace — outdoor furniture, pergolas, loungers and sun shades — specify those in the same package. As a China-based furniture and building materials manufacturer, we coordinate poolside furniture, lighting, wall finishes and flooring alongside the wet equipment, which removes several separate supplier interfaces from the programme.
A specification checklist you can send as it stands
- Model code and catalogue dimensions you are working from, plus your required footprint on site.
- Jet count and hydrotherapy zones; waterfall and water feature positions.
- Swim training system: required, or explicitly not required.
- Pump quantities, filtration type, ozone, and any added UV sterilisation.
- Lighting count and colour; control system location.
- Heating choice, insulation package, steps and access arrangement.
- Site supply details and cable run length.
- Delivery address, access constraints, and whether door-to-door delivery is required.
- Programme dates: order date, production window, shipment date, site readiness date.
What happens after the specification is agreed
Once those line items are confirmed, we issue a quotation with the equipment schedule attached, and you check it against your drawings before production starts. From there our project services cover manufacturing and quality control, packing and container loading, freight by sea, air or rail with the customs paperwork, delivery to site, installation support and after-sales service including spare parts. Our custom and OEM service also covers bespoke finishes and dimensions where a standard shell does not fit the design intent.
A clear specification is what keeps that sequence short. Send the checklist with your drawings, and we can confirm equipment, power load and lead time for your configuration without going back and forth.
Send your WS-S07B specification and site drawings to our project team for a confirmed equipment schedule and quotation. Contact: PHILLIP, phone / WhatsApp +86-13928214007, email santerson@qq.com, or use the enquiry form.