A dining cabinet quote rarely fails over price alone. It fails because the drawing behind the enquiry shows a box, while the site needs a piece of joinery that clears a skirting board, lines up with an adjacent stone splashback and still lets a door swing open. If you are specifying Santerson Decorative Dining Cabinets for a villa or apartment fit-out, the information below is what allows our workshop to return a usable quotation instead of another round of questions.

1. Room context and the wall the cabinet sits on

Send the room name, the elevation drawing or a set of site photos, and the overall run you want the cabinetry to occupy. Decorative dining cabinets sit in the line of sight of guests, so we need to know whether the piece is a low sideboard beneath a window head, a full-height storage wall, or a mix of both across one wall.

  • Overall length, height and depth you are working to, plus the ceiling height if the unit runs to the ceiling.
  • Fixed obstacles: skirting boards, switches, sockets, downlights, door swings, beams and any visible pipework.
  • Floor finish and whether the unit must sit proud of a rug, tile edge or heated floor zone.
  • Whether adjacent joinery — kitchen cabinetry, pantry tall units or wall panelling — has to match this cabinet in material and profile.

2. Layout and how the cabinet will actually be used

Tell us what goes inside before you tell us what it looks like. Storage for glassware needs different shelving depths and load ratings than storage for table linen, serving platters or a small bar setup. A short written list of intended contents is often more useful than a rendered picture.

  • Door type: hinged, sliding or open shelving, and the clearance available in front of the unit for each door to operate.
  • Internal configuration: adjustable shelves, drawers, cutlery trays, wine storage, appliance housings or display niches.
  • Worktop use: if the top doubles as a serving counter, say so — it changes substrate choice and edge detailing.
  • Fixing method for the wall build you have, especially for wall-mounted pieces; we need to know whether the wall is stud, masonry or an existing clad surface.

3. Materials, finish and hardware preferences

This collection is made to measure, so the material schedule belongs in the enquiry rather than arriving as an afterthought. Send a finish reference — a sample, a RAL or paint code, or a photograph of an existing surface to match — and note anything that must repeat elsewhere in the project.

ItemWhat to send us
Door styleFlat slab, shaker, raised or moulded panel; profile radius if the edge must feel soft in a family home.
Body and carcassSubstrate preference and any moisture exposure near a wet area or external wall.
FinishMatte, satin or high-gloss lacquer; veneer species and grain direction; melamine or acrylic if budget-driven.
Glass and insertsClear, bronze, smoked, ribbed or frosted glass for glazed fronts; internal shelving behind the glass.
HardwareHandleless or handle detail, hinge and runner brand if your project specifies one, soft-close requirement.
Integrated lightingShelf or niche lighting, sensor or switch control, and where the transformer may be accessed for service.

If you are comparing a glazed front against a solid one, our Santerson Glass Front Dining Cabinets page is the closest reference for that detail; a full-height storage option sits under Santerson Full Height Storage Walls.

4. Drawings, dimensions and the version you are working from

Please send files in a format we can measure from: PDF or DWG elevations, plus a dimensioned floor plan. Screenshots of a mood board help with style but cannot be quoted. Note the drawing revision number and date on every sheet you send — most rework begins with two teams working from different revisions.

  • Confirm whether the dimensions on your drawing are finished-face or structural, and where the tolerance band sits.
  • Flag any dimension that depends on another trade: stone thresholds, plaster set-out, tiling lines, or a joiner's setting-out mark.
  • Tell us if the site dimensions have been field-verified or are still taken from construction drawings.

Where the room calls for something beyond our catalogue configurations, Custom Furniture Design and Prototyping under our Custom & OEM service covers bespoke dimensions, material and finish choices, prototyping and branding. We can also work from an interior designer's package if you send the specification rather than a product name.

5. Quantities, programme and delivery logistics

Quote accuracy depends on knowing how many units, how many distinct configurations, and when they need to arrive. A single villa prototype and a multi-apartment release are quoted differently, because repeat configurations carry different setup and packaging work.

  • Quantity per configuration, and whether any units are spares or late additions.
  • Required delivery window on site and the date the joinery must be installed relative to other trades.
  • Delivery address, access constraints, lift or stair dimensions, and storage space on site.

Tell us the Incoterms you want quoted — ex-works, FOB or door-to-door — and your preferred mode of freight. We arrange sea, air and rail shipping with customs paperwork and door-to-door delivery; the scope is set per project on our Furniture Logistics and Door-to-door Delivery service. Give us your port of entry and we will price packaging and container loading accordingly.

6. Site conditions that change the build

Two identical drawings can produce different cabinets once site conditions enter the picture. Please include these details even if they seem minor:

  • Wall flatness and plumb — uneven masonry affects scribe allowances and shadow gaps.
  • Floor level across the run, particularly for long sideboards that must sit parallel to a window head or stair line.
  • Direct sun exposure on the chosen finish, and proximity to a heat source such as an open fire.
  • House rules on site access, working hours and whether installation happens while the property is occupied.

7. Budget range and what you want value-engineered

A stated budget band lets us propose a material schedule that fits, rather than quoting one specification and waiting for a rejection. Tell us which elements are fixed — a matching veneer, a particular hinge, a designer handle — and which surfaces we may substitute to protect the price.

8. Approvals, contacts and decision points

Name the people who sign things. We need one technical contact for drawings and shop detail, one commercial contact for purchase orders and payment terms, and clarity on who approves the finish sample before production starts.

  • Who signs off the shop drawing, and how long that approval usually takes.
  • Whether a physical sample or prototype is required before release to production.
  • Payment terms and currency you will transact in.
  • Any project documentation we must supply, such as material declarations or assembly sheets for the site team.

After handover, Furniture Installation and After-sales Support covers on-site installation, snag inspection, spare parts and maintenance; confirm the scope for your site when the order is placed.

A short pre-quote checklist

Document or detailWhy the workshop needs it
Dimensioned elevations (PDF/DWG)Sets carcass sizes, door splits and clearance for hardware.
Room photos with the obstacles in frameReveals scribe lines, skirting and services that drawings miss.
Intended contents listDrives shelf spans, drawer counts and load-rated runners.
Finish reference and matching scheduleKeeps the cabinet consistent with adjacent joinery.
Quantity and configuration breakdownDetermines setup work, packaging and container plan.
Delivery window and site access notesFixes freight mode, packaging grade and install sequence.
Named approver for shop drawingsProtects the production release date.
Note on specifications: dimensions, substrates, finishes and hardware for this collection are set per project. The figures in any drawing you send should be field-verified before production release, and we will confirm the final specification with you at quotation stage rather than assuming it from a catalogue page.

Send your drawings, finish references and quantities to SANTERSON and we will return a quotation built on your actual site conditions. Contact PHILLIP on +86-13928214007 (phone or WhatsApp), email santerson@qq.com, or use the form on our contact page.