A modern aluminum outdoor dining set and sun lounger looks simple on a spec sheet: powder-coated frame, slats or mesh, some cushions. In practice, the difference between a pool deck that performs for years and one that needs early replacement is decided in conversations about customisation before production starts. Buyers specifying these sets for villas, resorts and beachfront restaurants routinely discover too late that chair width, lounger pitch, sling fabric and cushion fill were never confirmed against drawings.

This guide lists the customisation decisions worth putting on the table, in the order they actually affect a project. It is written for procurement managers, architects, developers and landscape contractors ordering outdoor furniture in volume, using the options SANTERSON publishes for its aluminum outdoor collections.

Start With the Site Conditions, Not the Catalogue

The catalogue is the wrong starting point. Before any dimension or colour is fixed, write down what the installation location demands, because those answers drive almost every later choice.

  • Exposure. Coastal salt air, chlorine splash from an adjacent pool, and full all-day sun each place different demands on frame finish and fabric. The aluminum sling lounger range is described as having a frame treated to resist chlorine and coastal salt air, which matters for hotel pool decks and beach clubs rather than inland courtyards.
  • Traffic. A resort pool used by hundreds of guests a day needs different cushion construction, stackability and spare-part planning than a private terrace.
  • Drainage and slope. Slatted tops and elevated bases shed rainwater quickly; solid or tightly upholstered surfaces do not. On exposed decks where water sits, slat geometry is a functional decision, not a stylistic one.
  • Storage and movement. If loungers are moved daily for cleaning or cover storage, base type — static sled, wheeled or folding — changes the whole specification.

Send your supplier this short list with the enquiry. It is faster than browsing models, and it prevents the common situation where a beautiful set arrives that cannot be stored or cleaned the way the site requires.

Dimensions: What Can Actually Be Changed

For project orders, standard catalogue sizes are a starting point. SANTERSON states that frame colours and table dimensions can be customised for hospitality projects on its aluminum slat dining set with adjustable sun lounger, and that table dimensions, cushion fabrics and frame colours can be adjusted on the matching dining and bar sets. Confirm in writing which dimensions are adjustable on the model you are quoting, because chair seat height and table apron clearance interact.

DimensionWhy it needs confirmingWhat to send
Table length and widthDetermines seat count per table and clear circulation around chairs on a deckDeck layout with measured clearances, plus required seats per setting
Table height and apronMust match chair seat height; also affects umbrella or heater placementChair seat height from the drawing, not the brochure
Chair width and arm detailArm caps and teak details add width per seat, which changes how many chairs fit a run of tableMaximum total width allowed along the balustrade line
Lounger length and recline positionsGoverns spacing between loungers on a pool deck and whether guests can recline without touchingLounger pitch dimension from the landscape drawing
Cushion thicknessAffects seat height, drainage and how quickly the cushion dries after rainWhether cushions stay outdoors permanently or are stored

Ask for a dimensioned drawing of the customised configuration before production. A one-line change to table length is cheap at that stage and expensive afterwards.

Frame Finish: Colour Is Only Half the Decision

Aluminum frames are powder-coated, and custom frame colours are offered on the outdoor collections. Two things to discuss beyond the colour chip:

  • Finish sheen and texture. A matte or textured finish hides water spots, fingerprints and minor scratches far better than a high-gloss colour on a busy pool deck.
  • Colour continuity across zones. If the dining set, bar stools and loungers are ordered at different times, record the powder-coat reference rather than a colour name. Frame finish can be customised to match a project design palette, but matching two orders later requires the original specification on file.

For coastal sites, ask what surface preparation precedes the coating and request a sample of the finished profile — not just a flat swatch — so you can see how the colour reads on a rounded tube in sunlight.

Sling Mesh, Rope or Cushion: Choosing the Seating Surface

The same aluminum frame family can carry very different seating surfaces, and each behaves differently under guest use.

  • Textilene sling mesh. Breathable and quick-drying; stays cooler under direct sun than a padded surface. The aluminum sling sun lounger collection is built around this and comes in static sled, wheeled and folding versions, with stepless or multi-position back adjustment — a practical choice for high-volume hotel pool decks.
  • Slat surfaces with a teak-look finish. The aluminum & teak-look slat outdoor dining set & adjustable sun lounger uses aluminum slats textured to read as timber, without the cracking, fading and oiling that real wood demands. This is the low-maintenance option for high-traffic resort areas where nobody wants to maintain timber.
  • Natural teak accents. Sets such as the aluminum outdoor dining set & bar table stool set with teak accents pair an aluminum sled base with teak details, which gives warmth at the touch points while keeping the structure light and rust-proof.
  • Weather-resistant cushions. Ask about fabric, fill, whether the cover is removable for washing, and how the cushion fixes to the frame so it does not slide or lift in wind.

Sling colour and cushion fabric can both be customised to the project palette. Request physical samples of the exact sling colour and cushion fabric on site before signing off; photographs under studio lighting misrepresent both.

Lounger Mechanism: Recline, Base and Storage

The lounger is where comfort complaints concentrate, so specify it separately from the dining set.

  • Recline adjustment. Multi-position ratcheted backrests versus stepless adjustment feel different to guests and wear differently over years of daily use. Confirm which mechanism the quoted model uses.
  • Base type. Static sled base for fixed layouts, wheeled base where loungers are repositioned daily, folding for venues with limited off-season storage.
  • Wheel and caster quality. On a pool deck, small cheap casters pick up grit and stop rolling within a season. Ask what the wheels are made of if you choose the wheeled version.
  • Spare parts. Recline mechanisms and slings are wear items on commercial decks. Agree in advance which replacement parts can be ordered later, so a broken lounger does not become a whole-set replacement.

Making the Dining Zone and Pool Zone Look Like One Project

Resorts and villas rarely buy one set; they buy dining, bar, lounge and poolside in sequence. A unified design language across those zones is what makes an outdoor area read as designed rather than assembled.

Fix one frame finish, one accent material and one fabric family at the outset, then apply them to every outdoor item — dining table, bar stools, conversation seating and loungers. Order everything against that single specification sheet.

The published collections support this directly: matching series share the same aluminum sled-base chair structure and teak decorative details across dining tables and high bar tables with stools, so a beachfront restaurant or infinity pool bar can carry one look from the dining terrace to the water's edge. When you add pieces later, quote the original specification rather than the catalogue page.

Custom & OEM: Where Project Orders Go Beyond Colour and Size

For hospitality and villa projects, the custom and OEM service covers bespoke finishes and textures, prototyping, flexible minimum order quantities and brand customisation such as engraving or logos. In outdoor furniture terms, that typically means:

  • Engraved or embossed table numbers and wayfinding on poolside furniture
  • Project-specific slat spacing or profile where a landscape architect has drawn a detail
  • Coordinated finishes between outdoor aluminium furniture and other aluminium elements on the same project, such as ceilings and cladding
  • Private labelling and packaging for resellers and contractors stocking a range

Confirm current capacity, minimum order quantities and prototyping lead time for your specific request. Published MOQs and options vary by product family and change over time.

The Specification Sheet to Agree Before Production

Every customisation discussed above should land on one document, signed off before manufacturing begins. At minimum it should state:

  • Model reference and dimensioned drawing of the customised configuration
  • Frame profile, surface preparation and powder-coat colour reference
  • Sling fabric and colour, or slat profile and finish; teak parts and their treatment
  • Cushion fabric, fill, cover type and fixing method
  • Lounger recline mechanism and base type (sled, wheeled or folding)
  • Any engraving, logo or branding detail with artwork attached
  • Packaging specification and container loading plan for the order
  • Which spare parts can be reordered and how they are referenced

SANTERSON's stated workflow runs from project brief and design proposal to quotation and detail confirmation, then production, shipment and follow-up, with door-to-door logistics and installation support available. The detail confirmation stage is exactly where this sheet belongs — treat it as a deliverable you require, not something the factory produces on your behalf.

Questions Worth Asking in the First Call

Can you make the table 200 mm longer without changing the chair?

Usually the tabletop can be extended, but ask for a drawing showing leg and apron placement at the new length, and confirm seat count and stability.

Which sling fabric lasts best in full sun?

Ask for the fabric's warranty terms and the tested lightfastness figure from the mill, then compare two candidates side by side on site rather than accepting a single recommendation.

Can we order slings and cushions as spares in three years?

Get the fabric reference recorded on the specification sheet so a later order matches, and confirm which wear parts are stocked for reorder.

Do you supply a physical sample before the full order?

For volume project orders, request a finished profile sample and fabric swatches at minimum; for high-value hospitality work, discuss a prototype or single-piece pre-production sample.

Bringing It Together

Customisation conversations go well when they follow the same order as the decisions themselves: site conditions first, then dimensions, finish, seating surface, lounger mechanism, and finally branding and spares. Buyers who bring a measured deck layout and a written specification requirement to the first enquiry get accurate quotations faster — and avoid the change orders that erode project margins.

SANTERSON is a China-based furniture and building materials manufacturer supplying outdoor collections for resort, villa and hospitality projects, with custom/OEM manufacturing, door-to-door logistics and installation support. Send your site conditions and required seat count to the contact team and ask for a dimensioned proposal against the specification list above.