A flush interior door looks simple on a drawing: one clean plane, no visible frame, no hardware in sight. That is exactly why it causes problems at purchasing stage. The visual result depends on details that never appear in a schedule line — opening size, wall build-up, swing direction, concealed hardware, finish sequence and the interface with the joinery around it. This guide sets out what to put in a procurement brief when you are specifying Santerson flush interior doors for a villa, apartment or hospitality fit-out, so quotations from different suppliers stay comparable and the doors arrive ready for the site programme.

What the product line actually covers

Santerson is a China-based furniture and building materials supplier working on villa, hospitality and office projects, with doors sitting inside a wider package that also covers joinery, wall panelling, flooring, lighting and sanitaryware. The door range is catalogued under Windows and Doors, and the flush and concealed group includes:

Every one of these pages is written as a configurable product, not a fixed catalogue item: made-to-measure sizing, material and finish options, and layout tailored to the project. That is useful for design freedom, but it means the brief does the work. A door described only by name and quantity will come back priced against somebody else's assumptions.

The eight items a flush-door brief must state

ItemWhat to write down
Opening and leaf sizeArchitectural opening width and height, target finished floor level, leaf size and the tolerance you expect the factory to work to. Made-to-measure sizing is offered, so give dimensions from coordinated drawings rather than nominal grid sizes.
Wall build-up and threshold levelFlush doors sit inside the wall. State the wall type and thickness, where the frame is fixed, and at what point in the wet-trade and flooring sequence the opening will be ready.
OperationHinged or sliding, single or double leaf, active and passive leaves, parking pocket for sliding leaves, stop positions. Sliding variants need clear pocket dimensions before partitions are set out.
Swing and handingLeaf by leaf: hinge side, push or pull, and whether the door is rebated or flush on both faces. Handing errors are the most expensive door mistake on site.
Hardware intentHandleless, concealed handle, concealed hinge type and load, closers, magnetic locks, access control interface. Concealed hardware has load and cut-out consequences for the leaf, so it must be decided before production.
Surface and finishLacquer, laminate, veneer or a paint-ready face, sheen level, edge detail, and whether the finish is factory-applied or site-finished. Match finishes to the adjacent joinery by reference, not by colour name.
InterfacesAdjacent skirting, panelling, architrave (or its deliberate absence), reveals, acoustic or privacy expectation, and the items other trades will supply.
Package and accessSite address, loading constraints, floor level, lift dimensions, container plan and delivery windows. Door leaves are long, flat and easily damaged in transit, so packing and handling notes belong in the brief.

Materials and finishes can be specified per project through the Custom & OEM Service, which covers bespoke finishes, prototyping and OEM production. If your detail drawings already fix a profile or a reveal, send them with the enquiry instead of asking for a standard detail to be adjusted afterwards.

Reading the product page correctly

The door pages on this site are deliberately short: they confirm that finish, layout and dimensions can be specified to suit each space and project, and they ask you to confirm dimensions and selected specifications for each order. Two practical consequences follow.

  • Treat the listed name as a family, not a technical specification. The flush look is achieved through the frame, hinges and wall detail; two doors with similar names can sit very differently in a 100 mm versus a 120 mm partition.
  • Expect the quotation to be built around your drawings. Send openings, handing schedule, wall sections and finish references in the first enquiry, and ask the supplier to confirm what is included — leaf, frame, concealed hinges, hardware, packing — line by line.

Where a door disappears into a panelled wall, specify it together with the panelling. Santerson produces Wood Veneer Panels and wider Wall Panel Systems, so the door leaf, the reveal and the surrounding panels can be produced against one set of coordinated details instead of being reconciled on site by two trades.

Consolidating doors with the rest of the fit-out

Flush doors rarely fail alone; they fail at an interface. When cabinetry, panelling, flooring and joinery come from separate suppliers, each one protects its own detail and the gap between them becomes a site variation. Buying through a one-stop furniture and building materials supplier lets you put doors, built-in joinery, wall finishes and other fixtures under one production and coordination scope, which is how the villa and hospitality projects listed in the project cases are handled.

For procurement that means one drawing set, one schedule of openings, one finish board and one production sequence. The turnkey project services cover design coordination, production, logistics, installation support and after-sales in a single workflow, so the door package is scheduled against the same programme as the joinery it has to align with.

Freight is part of the specification. The logistics and door-to-door delivery service covers sea, air and rail freight, packaging and container loading, customs paperwork and tracking. State your Incoterms and delivery address in the brief, confirm who handles import clearance at destination, and check that leaf sizes fit the lifts, stair cores and doors they must pass through on site.

A short pre-order checklist

  • Coordinated opening schedule issued: sizes, floor levels, wall types, handing, per leaf.
  • Operation decided for every opening: hinged or sliding, pocket dimensions confirmed.
  • Concealed hardware selected and load-checked against the leaf build-up.
  • Finish references fixed against adjacent joinery; factory versus site finishing agreed in writing.
  • Inclusions confirmed line by line: leaf, frame, hinges, hardware, packing, spares.
  • Delivery scope, Incoterms and on-site access constraints recorded in the order.
  • Interface details for panelling, skirting and architrave resolved before production release.

Figures such as factory area, export share, certifications, lead times, warranty terms and response times appear inconsistently across this site's pages. Do not rely on them in a contract: ask for the current figures and the applicable commercial terms in writing, with your project reference, before you place an order.

Sending the enquiry

A complete flush-door enquiry is short to write and long on consequences: opening schedule, wall sections, handing list, hardware intent, finish references, delivery address and access notes. Send that with your drawings and the comparison between suppliers becomes a comparison of like for like — and the doors arrive as part of a coordinated package rather than as the last unresolved item on site.

Project enquiries for the interior door range can be sent through the contact page, quoting the project name, the openings you need priced and the drawing revision you are working from.