A short enquiry that only says "how much for the swim spa" usually comes back with more questions than answers. On a configurable product such as Outdoor Swim Spa WS-S38, the quotation depends on the site conditions, the equipment you want included and the way the unit has to reach your address. Sending that information in the first message is what turns a vague price range into a usable offer with a defined scope.

The list below follows the order we work through internally. It applies whether WS-S38 is being specified for a private villa terrace, a resort pool deck or a wellness area in a hotel.

Start with how the spa will be used

Two projects can order the same shell and end up with very different builds. Before any equipment is discussed, tell us:

  • Primary purpose. Daily lap swimming, hydrotherapy and massage, children's play, or a mixed-use spa area. This drives how the jets are arranged and whether an additional swim-training unit belongs in the design at all.
  • Expected users. Household size, guest load for a hospitality project, and whether anyone using it needs low step height or grab support.
  • Year-round or seasonal use. A spa used in winter needs a heating strategy agreed early, not added after the shell is manufactured.
  • Who operates it. An owner-occupied villa and a hotel with maintenance staff have different tolerance for manual maintenance tasks.

Confirm the site before you confirm the model

Catalog footprint of WS-S38 is 3760 x 2080 x 1110 mm, which is a compact footprint for an in-ground or semi-recessed installation. Send us the site facts that sit around those numbers:

  • Installation type. Above ground on a slab, semi-recessed, fully recessed with an equipment access hatch, or indoor in a plant room.
  • Access route. Gate width, turning space, crane or forklift access, and whether the unit must travel over lawn, tiles or a finished deck. This decides packaging and the delivery method we quote.
  • Supporting structure. Slab thickness and load path for the filled weight, plus drainage around a recessed pit.
  • Clearances for service. Space to reach pumps, filter and control system without lifting the spa out of position.
  • Local approval requirements. Any permit, fencing or barrier rule your council or building authority applies to a water feature. We supply documentation; you confirm what your local authority accepts.
Send drawings, photos and a site plan with dimensions in the first email. A single marked-up plan removes most of the back-and-forth that delays a quotation by weeks.

Electrical supply is the item most often left out

The WS-S38 catalog entry lists a total power figure of 14.05 kW for the configuration shown on the product page, with three water pumps and one filter pump in that build. That number changes the moment you add or remove equipment, so treat it as the reference point for a conversation with your electrician rather than a final load.

Please have these details ready:

  • Available supply: single-phase or three-phase, voltage and frequency at the site.
  • Dedicated circuit capacity, breaker size and the run length from the distribution board.
  • Whether a heat pump will be added, since it changes both the load and the plant space required.
  • Who handles the connection. We advise on the equipment side; the on-site electrical work and its certification are done locally by your contractor.

Decide which equipment is in scope, not just which model

WS-S38 is a configurable unit. The features shown on the product page (water jets, LED lighting, ozone sanitation and a waterfall) are what that reference build carries. Options listed in the catalog include control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps; availability and compatibility vary by model, so each option is confirmed against the configuration you select.

A practical way to specify it is a two-column list: what must be included for the project to function, and what is desirable if the budget allows. That structure lets us price a base build and a recommended build side by side instead of one inflated number.

What we can send you as reference

The catalog entry for WS-S38 records the configuration details below. Use them to check whether the base unit fits your space and expectations before we discuss options.

ItemShown in the catalog entry
ModelWS-S38
Catalog dimensions3760 x 2080 x 1110 mm
Control system1 set
Water pump3 pcs
Filter pump1 pc
Jets51 pcs, with 6 water columns
LED lighting4 pcs, plus 12 small LED lights
Total power14.05 kW for the configuration shown
Features shownWater jets, LED lighting, ozone, waterfall
Swim training systemNot listed for this entry: confirm separately if required

If the footprint needs to change, the Swimming Pools and Swim Spas category covers a wide range of lengths and configurations, so a different shell may suit the site better than WS-S38. Where none of them matches the space, our Custom & OEM Service covers bespoke sizing, finishes and branding for project quantities.

Delivery terms and who does what on site

State the delivery address and the Incoterms you want quoted. Our Logistics & Door-to-Door Delivery service covers freight forwarding, packaging and container loading, customs paperwork and tracking to the delivery point. Import duties, local taxes and site-side crane hire are arranged locally and should be budgeted separately, because they sit outside our quotation.

Also confirm who installs. We support Installation & After-sales Support, including inspection and snag lists, spare parts and maintenance guidance. For some sites the local civil and electrical contractors carry out the installation with our remote guidance, and that split of responsibility should be agreed in writing before production starts.

Project documentation to have ready

For a hospitality or multi-unit project, these documents speed up approval and let us coordinate the spa with the rest of the fit-out:

  • Architectural or landscape drawing showing the spa location, levels and finishes.
  • Bill of quantities or specification reference, so the spa is quoted against the same numbering your team uses.
  • Programme dates: required on-site date and any trade freeze before handover.
  • Sample approval requirements: who signs off colour, finish and control interface.

A first-enquiry checklist

Copy this into your email before sending

  • Project name, location and whether it is residential or hospitality
  • Model of interest (for example WS-S38) or the required footprint if you are not sure
  • Installation type, site photos and a dimensioned plan
  • Electrical supply available on site
  • Required equipment: heating, sanitation, jets, lighting, waterfall, steps
  • Quantity and required delivery date
  • Delivery address and preferred Incoterms
  • Who performs installation and electrical connection

What happens after you send it

With those details in hand we work through the same sequence as any other project: consultation, design and planning, production, logistics, installation and after-sales. You receive a configuration proposal with the equipment list and power requirements, then a quotation against that scope, and only then does production begin. If your project also needs poolside loungers, pergolas, bathroom ceramics or decking around the spa, we can coordinate those under one procurement package rather than several separate suppliers.

Send your site plan and equipment list with the model reference, and you will get a proposal that reflects the build you actually need instead of a generic price.