A wardrobe drawing that looks finished on screen can still fall apart on site: the door face is specified, but not how it meets a sloping slab; the finish is approved, but not how it reads against an adjoining wall panel; the layout is signed off, but not who trims the opening. Our Glass & Lacquer Combination Wardrobes sit in exactly that gap, because they mix two very different door faces — a lacquered panel and a glazed one — in the same run of doors. This guide sets out what we need from your drawings, which site conditions decide whether the installation goes smoothly, and what you should expect us to confirm back before production starts.

What makes this combination harder to coordinate

A single-material wardrobe is forgiving. When one door type runs the full height, small dimensional differences hide in the repetition. A lacquer-and-glass combination does not behave that way, for three practical reasons.

  • Two reveal systems in one elevation. The lacquered door and the glazed door meet their frames differently, so the shadow line and rebate depth have to be drawn once and applied consistently across every door in the run.
  • Glass changes how the interior reads. Behind a lacquer door you see nothing; behind a glass door you see the carcass, the shelves, the hanging rail and whatever is stored there. The internal finish becomes an external design decision.
  • Reflections are site-specific. Lacquer next to glazing throws the room back at the viewer. Which window, which lamp, which corridor — all of that only becomes visible once the unit is standing in place. It is also why sheen level has to be chosen for each project: within this collection we supply both High Gloss Lacquer Wardrobes and Matte Lacquer Wardrobes, and the same elevation reads very differently with one rather than the other.

None of this is a problem if it is resolved on paper. It becomes expensive when it is discovered with the carcass already delivered.

What your drawings should carry before we quote

We work to made-to-measure sizing on every wardrobe in this collection, which means the drawing is the order. The more of the following a set of tender or shop drawings already answers, the fewer rounds of clarification we need.

Drawing item Why it matters to production
Door schedule: which bays are lacquer, which are glass, and in what sequence Fixes the hardware set, the handle detail and the order in which doors are hung and adjusted.
Glass type and glazing specification per door Determines the frame profile, the door weight and the hinge or runner loading.
Finish reference for the lacquered faces Colour alone is not enough; sheen level and how the surface sits beside glazing are what decide whether the elevation reads as resolved.
Internal layout: hanging zones, drawers, shelves, lighting provisions Anything visible through a glazed door has to be finished and fixed as carefully as the exterior.
Setting-out dimensions taken from the completed room, not the structural drawing Floor finishes, skirting, plaster build-up and ceiling set-down all consume millimetres that a structural plan does not show.
Interface details: adjacent wall finish, architrave or flush detail, return panels Decides whether the piece reads as built-in joinery or as a wardrobe standing against a wall.

If your set of drawings is still at concept stage, that is fine — send what you have. Our Interior Design Services cover space planning, layout and 3D renderings, and we can develop the elevation from there rather than waiting for a complete pack.

Site conditions we check before anything is cut

Drawings describe an ideal room. A site survey describes the one you actually have. For a glazed-and-lacquered run of doors, four site conditions decide whether the installation goes smoothly:

  • Out-of-plumb walls and out-of-level floors. Glass doors are less tolerant of this than solid ones, because a misaligned glazed door shows the error through the reflection. Packing and scribe details should be drawn, not improvised on the day.
  • Actual opening height after the ceiling build-up. Full-height doors dimensioned against a structural slab will not arrive if cornice, set-down or services come later.
  • Light sources behind the viewer. We need to know where daylight and downlights fall so the sheen of the lacquer can be agreed against real conditions rather than a sample board in an office.
  • Access route for delivery. Long carcass panels and glazed doors have to reach the room intact — lift dimensions, stair turns and corridor widths all matter on apartment and villa sites alike.

Send us survey dimensions from the finished room, and we will confirm the manufacturing dimensions back against them before cutting. Where a site dimension conflicts with the drawing, that is the moment to resolve it — a change at that stage costs a revision; the same change after production costs a replacement unit.

How the rest of the joinery should be coordinated

A wardrobe rarely stands alone in a bedroom scheme. Once the lacquer-and-glass elevation is agreed, the adjoining work has to match it, or the contrast becomes obvious.

  • Matching wall and panel finishes. The same lacquer specification can be carried into Santerson Matte Lacquer Panels, so a wardrobe front and the wall beside it read as one surface instead of two suppliers' interpretations of the same colour.
  • Cabinetry from the same source. Where kitchens, vanities and storage are ordered together — as on apartment and hotel work — Custom Built-in Kitchen Cabinets let panel material, edge detail and finish be specified once across the whole project.
  • Doors and openings. A flush wardrobe line next to a mismatched door reveal draws more attention than either element on its own. Coordinated Santerson Flush Interior Doors keep the vertical lines consistent.
  • Interior lighting to the glazed bays. Lighting behind glass is a design decision, not an accessory. Santerson Integrated Cabinet Lighting should be shown on the electrical drawing, with driver access agreed before the carcass closes.

The wider point: every element in this range is part of our Built-in Furniture category, and it is simpler to hold one specification across wardrobes, cabinetry, panelling and doors than to reconcile several. As a Custom Furniture Manufacturer, we can also match existing joinery on site where a project is being extended rather than fitted out from scratch.

Confirmations we send back before production

Product listings in this collection describe configurable sizing, material and finish options rather than fixed technical data. That is deliberate: the specification is written per project. Before manufacture we return:

  • Manufacturing dimensions reconciled with your survey, with any deviation from the drawing flagged explicitly.
  • A door schedule showing lacquer and glazed bays in sequence, with handle and hinge positions.
  • Finish samples of the lacquered faces, assessed against the selected glass — not viewed separately.
  • Internal layout for the glazed sections, including shelf material, carcass colour and lighting provisions.
  • Interface details for the returns, scribes and any adjoining panelling or door reveal.

Approval of that pack is what starts production. After it, changes are difficult to absorb without affecting the delivery slot.

A note on specification: pages in this collection describe made-to-measure sizing with material and finish options; they do not publish fixed dimensions, glass grades, board specifications or performance figures. Treat nothing on a product page as a certified value. Dimensions, glass type, safety requirements, hardware loading and any local code obligations should be confirmed for the specific configuration and the project's jurisdiction before the order is placed.

Installation sequence that avoids the usual snags

Glazed doors installed last, after decorating and flooring, is the sequence we recommend. Carcasses can be set and levelled earlier; glass and lacquered doors are better fitted once the room is complete, so that final adjustment happens against finished surfaces.

  • Set and level the carcass against survey dimensions, checking plumb along the full door run rather than at a single point.
  • Fit internal layout and test drawer runners before any door goes on.
  • Hang doors in the order shown on the schedule, then adjust — glass doors are aligned last, with the reflection used as the check.
  • Walk the snag list with the site team: reveals, scribe lines, handle alignment, lighting function.

Our Furniture Installation and After-sales Support service covers on-site installation, inspection and snag lists, warranty coverage and spare parts for later replacement. Response times, warranty terms and installer availability differ by location, so agree them in the contract for your project rather than assuming what a product page implies.

A short pre-production checklist

  • Survey dimensions taken from the finished room, not the structural drawing.
  • Door schedule agreed: which bays are lacquer, which glazed, in what order.
  • Glass specification and safety requirements confirmed for the project's jurisdiction.
  • Lacquer sheen assessed beside the selected glass under the room's actual lighting.
  • Interior of glazed bays specified — shelf material, carcass colour, lighting and driver access.
  • Interface details drawn: returns, scribes, adjoining panelling and door reveals.
  • Delivery route to the room confirmed for long panels and glazed doors.
  • Written approval of the confirmation pack before cutting begins.

If you have drawings at any stage — concept sketch, tender pack or shop drawing — send them over with the room's survey dimensions. We will come back with a door schedule, finish direction and a specification to review for your Glass & Lacquer Combination Wardrobes, along with matching cabinetry and panelling where the scheme calls for it.