Two tone sliding door wardrobes look simple on a sample board: a lighter panel, a darker carcass, a set of panels that glide across a track. On site they are something else entirely — large, flat, heavy panels with finished faces on both sides, plus hardware that has to stay true after weeks at sea. Before you place an order, ask your supplier how those panels will travel. The questions below are the ones worth putting in writing.

Start With What Is Actually Being Shipped

Our two tone sliding door wardrobes are made to measure, with the finish, layout and dimensions specified per project. That is exactly why packaging cannot be read off a standard spec sheet: a wardrobe built to a bedroom's full height arrives as tall panels, and a run of guest-room units arrives as many near-identical ones. Confirm which pieces travel as assembled carcasses, which travel flat packed, and how the sliding leaves are separated from the frames.

Ask for a packing list that matches your order line by line — one entry per unit or per room, with the panel size and the carton count against it. If the list cannot be tied back to your shop drawings, you will be reconciling furniture at the dock with no reference point.

The Faces Are the Risk, Not the Board

A two tone scheme puts a lacquered or laminated face in direct view of the room on one side and a contrasting colour on the door. Sliding leaves are handled repeatedly during installation, slid into track and squared up, so their edges and corners take most of the abuse.

What we ask buyers to confirm with us, and what you should ask any manufacturer:

  • Edge protection on every finished corner, not only on the outermost carton in a stack.
  • A protective layer between panel faces where two decorated surfaces face each other — important for high gloss and lacquered doors, which show pressure marks and abrasion far sooner than a matte surface does.
  • Rigid corner sections and a hard outer case for panels that are full room height.
  • Hardware bagged, labelled to the unit it belongs to, and packed where it cannot shift against a finished face inside the carton.
  • A written note of the panel orientation in each bundle, so the crew on site knows which face is front without lifting protection.

Finish choice changes the packaging conversation. A matte sliding door wardrobe is more tolerant of light contact than a glossy one, while mirrored leaves need glazing-grade handling and edge blocking on all four sides. If your project mixes finishes across room types, ask for the packing standard for each finish rather than one blanket rule.

Sea Freight Is Where Wardrobes Get Damaged

For an Australian villa or apartment job, the panels will usually travel by sea, sit in a container through temperature swings, and be lifted more than once before they reach the bedroom. Our logistics service covers freight forwarding by sea, air and rail along with customs paperwork, packing and container loading, shipment tracking and door-to-door delivery, so we plan the loading at the same time as production.

Useful things to pin down in the order confirmation:

  • How panels are braced inside the container, and whether anything heavy is stacked against a wardrobe case.
  • Whether moisture protection is used for the crossing, and how cartons are kept off the container floor.
  • The carton count and total volume, so you can check that the delivery vehicle and the lift or stairwell on site can take the sizes.
  • Cargo insurance arrangements, and who files a claim if a bundle arrives damaged.
  • Incoterms and the delivery point — port, depot or room of destination. Import terms, duties and transit times for Australia are confirmed case by case rather than assumed.

Sequence the Delivery Around the Site

Wardrobes are built-in work, so they arrive into a room that is still changing. Flooring, skirting and wall finishes normally come first, and the openings have to be final before made-to-measure panels make sense. Tell your supplier when the rooms will actually be ready, and whether the delivery should be split — carcasses early, doors and hardware later — which often works better than one large drop into a busy site.

Where the project also includes mirror sliding door wardrobes or other glass-fronted storage, keep those bundles separate on site and store them upright, never flat against a wall where they can flex.

Check the Goods Before the Crew Unloads Everything

Agree the inspection routine in advance. Photograph any carton with visible damage before it is opened, open at least one bundle per finish to check faces and edges, then compare the packing list against your approved drawings and quantities. Keep protection material in place until a panel is actually being fitted; that way a snag found late can still be matched to the bundle it came from.

Our after-sales support covers on-site installation, inspection and snags, warranty coverage, spare parts and replacement, and ongoing maintenance. Confirm the exact terms that apply to your order before shipping, since response times and exclusions vary by project.

A Short List to Send With Your Enquiry

Send these six items with your drawings and you will get a quotation that already answers the packaging questions:

  1. Room dimensions and the height the wardrobe is built to, including ceiling irregularities.
  2. Finish for carcass and for doors, stated separately for each room type.
  3. Interior layout per unit — hanging, shelving or drawer focused.
  4. Delivery address, and the access route from kerb to room.
  5. Your required site sequence for built-in joinery.
  6. The packing and inspection terms you want written into the order.

SANTERSON has manufactured furniture and building materials since 2008 and supplies built-in furniture for villa, hospitality and office projects, with design coordination, custom and OEM production, logistics and installation handled as one scope. Share your drawings and the list above, and we will confirm dimensions, packing method and specifications for each unit before production starts.

Talk to PHILLIP about your wardrobe package: +86-13928214007 (phone / WhatsApp) · santerson@qq.com · send an enquiry