A wardrobe order that travels well is decided long before the container leaves the factory. When you are buying cherry solid wood wardrobes for a villa or apartment project, the pieces must survive ocean handling, clear customs at the destination port, arrive in the right sequence for site access, and still fit the openings your joiner prepared months earlier. The checklist below follows that order from order confirmation to handover, so nothing important is discovered only after the goods are already on the water.
1. Lock the specification before production starts
Solid timber joinery cannot be adjusted once it has been machined and finished. Confirm room by room: overall width, height and depth; internal layout of hanging rails, shelves and drawers; door type and opening direction; and the finish you have approved. Cherry is specified as a made-to-measure product with selectable material and finish options, so treat your approval sheet as part of the contract rather than a preference list.
Ask for a signed shop drawing per wardrobe, showing the finished dimensions, the direction of door swing, and the clearance needed for handles and adjacent walls. Record the approved colour and sheen on a physical sample you keep at site; photographs of timber shift in tone between screens and lighting conditions, and a disputed finish is far harder to settle after delivery.
2. Fix dimensions against site reality, not drawings
Every dimension used for production should come from the completed building envelope: floor levels, plaster or cladding thickness, ceiling height, skirting, and the position of switches, sockets and lights. Old dimensions are a common cause of trouble on renovation work, where finished floor build-up can take up centimetres that were not there when the original survey was taken.
Where rooms differ, do not assume symmetry. Mark each unit with its room reference on both the drawing and the packed component, so the installation crew can match parts to spaces without guessing. If a wall is out of square, say so in writing and agree how the scribe or filler panel will be handled.
3. Decide delivery terms and who owns each leg
Choose your Incoterms deliberately. A door-to-door arrangement keeps one party responsible from factory loading through inland delivery at site, which is usually the simplest option on a residential project with several trades waiting. If you take FOB or CIF instead, you appoint your own forwarder and handle destination clearance, so confirm in writing who arranges insurance, wharfage, port charges and the final truck to site.
For furniture logistics and door-to-door delivery, ask which mode is being quoted. Sea freight is normal for a full project order, while air or rail may be considered when a small number of units must reach site ahead of the rest. Get the estimated transit time in writing as an estimate, then plan your site programme around a later date rather than the earliest one.
4. Confirm packaging and how the load will be packed
Solid timber doors, side panels and tops are the parts most often damaged in transit. Ask for the packing standard you expect: corner protection, edge battens, a rigid case or crate for door leaves, moisture barrier for the crossing, and slip sheets so cases can be moved without dragging. Sliding and hinged door leaves travel best standing upright and restrained, not flat under stacked weight.
Request the packing list before loading, with case numbers, net and gross weights, dimensions and the room reference for each case. That list is what your lifting plan and site access route are built on: it tells you whether a case will pass a stairwell, a lift doorway or a narrow villa entrance, and whether you need a crane or a wider opening.
5. Plan container loading and order sequence
Loading density matters for cost, but sequence matters for schedule. A container packed in reverse installation order can be unloaded room by room as the site becomes ready, instead of being unpacked twice. Confirm with your supplier how the wardrobe carcasses, doors, hardware sets and any built-in furniture on the same order will be grouped, and whether hardware travels with its matching unit or in a separate box.
Where one project spans several containers, ask for a load plan per container plus a summary that maps every case to its room. This is what prevents a half-fitted bedroom while the missing panels sit in another box at the back of a second container.
6. Prepare customs documents early
Wooden furniture attracts particular attention at import clearance. Have the commercial invoice, packing list and certificate of origin drafted as soon as production is finished, with accurate descriptions, materials and values rather than vague wording, and check that case marks on the crates match the paperwork line by line. Ask your broker early whether any fumigation, treatment or timber documentation applies to your destination, so this requirement does not surface while the goods are already at port.
Also confirm duties and taxes before the vessel arrives, along with who pays them, so a clearance bill does not stall delivery on the last mile. Keep one named person responsible for document review on your side; most delays are clerical, not physical.
7. Book site access and receiving conditions
A delivered wardrobe is only useful if it can be moved into the room it belongs to. Check lift booking slots, building management hours for deliveries, corridor and doorway widths, and whether floors and wall corners need protection along the route. On occupied buildings, arrange the delivery window in advance and tell neighbours or residents, because a blocked corridor stops the whole crew.
Store nothing on a bare slab. Cases should stay dry, off the ground and out of traffic until installation, and any moisture-sensitive board material should not sit in an unheated space through a wet season.
8. Inspect on arrival and record everything
Open cases against the packing list while the delivery is still on site. Count cases, check case numbers against room references, and inspect door leaves, panels and finishes for impact damage, open joints and finish marks. Photograph any damage in place, with the case number and container number visible, before anything is moved or discarded; keep all packaging until every unit is accounted for.
Send that record to your supplier the same day, listing case numbers, quantities affected and photographs, rather than a general note of damage. For replacement parts and spare hardware, this documentation is what makes a claim quick instead of contentious.
9. Install, then close out with spares and support
Fitting should follow the approved drawings: level and plumb carcasses first, doors aligned and adjusted after, then drawer runners and soft-close hardware checked under load. Leave a short snag list and agree who resolves each item. Keep any spare panels, shelf pins, hinges and keys supplied with the order in labelled storage on site; they are what you reach for during handover defects or later maintenance.
Confirm in writing what after-sales support covers, how replacements are ordered and shipped, and how long spare parts remain available. Where the same supplier handles design, production and installation and after-sales support, a single point of contact usually shortens the close-out.
A simple pre-shipment checklist
- Signed shop drawings per wardrobe, with door swing and clearances
- Approved physical finish sample held on site
- Confirmed Incoterms, insurance cover and who pays destination charges
- Packing standard agreed in writing, with case marks and room references
- Load plan mapping every case to a room and to installation sequence
- Draft invoice, packing list and origin documents reviewed by your broker
- Delivery window, lift booking and access route confirmed with building management
- Inspection and photo protocol agreed before unloading begins
Worked in this order, the delivery of a project order stops being a gamble: you approve what is made, verify how it travels, and only then commit your site programme to the arrival date. That sequence is also the practical reason we handle projects as turnkey interior project solutions, coordinating specification, production, freight and installation under one responsibility rather than passing risk between separate suppliers.