A floating vanity looks simple on a drawing. It is a wall-hung box with a stone top, a basin and a mirror above it. That apparent simplicity is exactly why proposals for this item get compared on price alone — and why two quotations that look identical on a bill of quantities can behave very differently once they are on site, loaded with toiletries, towels and daily use in a humid room.

If you are sourcing bathrooms for a villa or apartment project and have received a proposal referencing our Santerson Floating Vanity, the useful question is not "is this price good?" but "does this document let me install, hand over and maintain the item without a variation order later?" Below is the checklist we would apply to any manufacturer's proposal for a wall-hung vanity — including our own.

What the product actually is, before you judge the quotation

The Santerson Floating Vanity sits in our Vanities collection and is described as a configurable, wall-mounted piece for residential bathroom projects. Its published configuration terms are made-to-measure sizing, material and finish options, and layouts tailored to the project. That wording matters when you read a proposal: the item is not a catalogue SKU with one fixed size, so any quotation that quotes a single number without stating which dimensions and finishes it refers to is incomplete on its face.

The same configurability applies across the collection — the Santerson Double Vanity, the Single Vanity and the Santerson Integrated Countertop Vanity. A proposal that treats these as interchangeable line items has not been written for your project.

Check one: does the specification match the room, not just the elevation?

A floating vanity is carried by the wall. Before comparing prices, confirm that the proposal states the dimensions it was priced against, and that those dimensions were taken from site survey or coordinated drawings rather than a typical detail.

  • Overall width, projection (depth) and height of the unit, plus the set-down dimension from finished floor to underside — this is what determines whether towels, skirting and floor outlets still clear.
  • Finished-wall versus structural-wall dimensions. A 10 mm difference in tile build-up changes a made-to-measure unit.
  • Position of soil, waste and water outlets relative to the unit, and whether the proposal accounts for them.
  • Basin choice and how it sits in the top — integrated, undermount or above-counter. Our Integrated Basin, Santerson Undermount Basin and Santerson Vessel Basin (Above Counter) each change the top fabrication, the tap-hole position and the clearance above the deck.
  • Countertop material. If a stone top is quoted, check whether it is listed as part of the unit or as a separate supply, and whether edge profile, splashback return and cut-outs are included.

Where the proposal is silent on any of these, ask for it in writing. Silence is not inclusion.

Check two: how the unit is supported, and by whom

This is the item most often left out of a supplier's document, and it is the one that generates arguments on site. A wall-hung unit needs a supporting structure behind the lining — steel framing, solid blocking or a rated fixing system — and the manufacturer's proposal should say what it assumes about that substrate.

A workable proposal states three things separately: what the supplier supplies (carcass, brackets, drawer runners, hinges, top, basin); what the supplier requires from others (substrate, blocking, waterproofing, tapware, waste, electrical); and who signs off the interface. If your quotation bundles "vanity" as one line with no interface list, expect a variation later when the tiler and the plumber each assume the other handled the wall.

Check three: materials, finishes and their limits in a wet room

Read the finish description as a specification, not a colour name. "Matte grey" tells you nothing about how the surface behaves against standing water at a basin rim or against cleaning products used by a housekeeping team.

Ask forWhy it matters on site
Substrate and construction of the carcass and doorsDetermines how the unit tolerates humidity and how it repairs if damaged.
Finish system and its edge treatmentEdges and drilled holes are where moisture-related failures start, not flat faces.
Hardware brand, model and load rating for drawers and doorsRunners are the highest-wear component in a vanity and the most common warranty claim.
Countertop material and finish — see Santerson Stone & Marble SurfacesStone is porous and etches; the proposal should say what sealing and care it assumes.
A named finish reference, not a photographScreen-rendered colours do not survive comparison with a physical sample under bathroom lighting.

Request a physical sample of the exact door panel and countertop before you approve production. This costs a week and removes the most common source of dispute at handover.

Check four: storage configuration, because it drives price more than styling does

Two vanities of identical size can differ materially in cost depending on what is inside them. A proposal should list the internal layout explicitly: number and depth of drawers, whether a pull-out hamper or tall linen arrangement is included, and whether shallow drawers are fitted with organising trays. If your document says only "vanity unit, 1200 mm", you are comparing unknowns.

This is also where a floating unit earns its place in small bathrooms — clear floor under the unit makes a compact room read larger and lets floor finishes run through uninterrupted. If storage volume is the real requirement rather than the floating look, ask the manufacturer to price both a wall-hung option and a comparison against Santerson Utility Tall Cabinets in the same finish. A supplier willing to give you that comparison is usually the one worth working with.

Check five: the mirror, lighting and electrical are part of the same decision

A floating vanity is almost always specified as a group with the mirror and the light above it. A proposal that prices the cabinet alone has not priced the item you will actually see in the room.

For each of these, the proposal should carry a confirmed specification. Our own product pages ask buyers to verify dimensions, lighting and electrical requirements for the final configuration; a serious quotation repeats that rather than assuming it.

Check six: what the price includes between the factory and your bathroom floor

Made-to-measure vanities travel badly if packaging is an afterthought. Stone tops, mirror glass and pre-assembled carcasses each fail in different ways in transit, so ask how each element is packed and braced, and what the container plan looks like across a multi-bathroom order.

Then read the commercial terms as carefully as the technical ones. A proposal for project quantities should state the quantity basis and any minimum order; the Incoterms and who carries freight, duty and insurance; packaging and container loading arrangements; and the lead time measured from which event — order, drawing approval or deposit. Our Logistics & Door-to-Door Delivery service covers freight forwarding, customs paperwork and delivery coordination, but import terms, duties and transit time are settled project by project, and any quotation you receive should say plainly which of those it includes.

Check seven: after-sales terms written down, not promised verbally

Bathrooms fail late — hardware loosens, finishes lift, a mirror demister dies in year two. Before award, ask the proposal to state what is covered and for how long, what is excluded (misuse, incorrect cleaning products, damage by other trades), how spares such as runners, hinges and replacement door panels are ordered, and who performs remedial work in your country.

Our Installation & After-sales Support page lists on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance. Response times and warranty scope vary by project and region, so require the specific terms for your project in writing rather than relying on general marketing statements — from us or from anyone else.

A short red-flag list

  • One price for a made-to-measure item with no dimensions, finish reference or hardware schedule attached.
  • No statement of what the supplier requires from the substrate and from other trades.
  • Mirror, lighting and electrical priced separately with no interface owner named.
  • Lead time quoted without saying when the clock starts.
  • No physical sample offered before production approval.
  • Warranty described in adjectives instead of terms, duration and exclusions.

How a one-stop supplier changes the assessment

When vanities, basins, tapware interfaces, mirror cabinets, lighting, wall panelling and flooring come from several suppliers, every interface becomes someone else's risk. Bringing those into one procurement reduces the number of interfaces you have to police — which is the practical reason we supply bathroom joinery alongside ceramics, double basin countertops, lighting and interior finishes as a single one-stop solution, with design coordination, custom/OEM work and production under one document set.

That convenience is only worth buying if the supplier can still answer the seven checks above. Consolidation that hides the specification behind a single lump-sum line is worse than two clear quotations.

Send us your drawings and we will mark them up

The fastest way to test a proposal is to send it, with the bathroom layout and outlet positions, and ask for a line-by-line response. If you are evaluating a quotation for our floating vanity — or comparing ours against another manufacturer's — contact SANTERSON with your drawings and quantities, and we will return a specification that states dimensions, finish references, hardware, countertop and basin arrangement, what we require from site, packaging and delivery terms, and the after-sales scope for your project.

SANTERSON is a China-based furniture and building materials manufacturer supplying villa, hospitality and office projects worldwide. Send your bathroom layouts and quantities through our contact page and we will respond with a fully specified proposal for the floating vanity package.