A two tone melamine kitchen can arrive at site looking exactly as approved and still fail on installation day. Edges chipped, door fronts mismatched against the sample board, hinges stripped, panels impossible to line up. None of that is a manufacturing fault. It is a packing fault, and it is one the buyer can prevent long before the container is booked.
Why two tone melamine is more exposed in transit than a single finish
Melamine faced panels are dimensionally stable and reasonably hard wearing, but the vulnerability sits at the edges. The decorative face is fused to the substrate; the cut edge is an adhesive edge band that takes impact far worse than the panel itself. Knock a corner on a pallet edge and the repair is visible under raking light.
Two tone layouts add a second problem: visual mismatch. A dark woodgrain slab next to a pale solid door means any difference in sheen, grain direction or batch tint between the two groups shows up across the run of cabinetry. Packing that mixes the two families makes it hard for the fitter to know which panel belongs where, and errors get assembled into the wrong elevation.
Our Two Tone Melamine Cabinets are made to measure for each project, with finish and layout confirmed before production. That same per-project thinking has to carry into the way the units leave the factory.
Confirm the carton schedule before production starts, not after
Ask for the packing list as a drawing-level document: every carton numbered, with the elevation it belongs to and the panel codes inside. A generic "10 cartons" line tells you nothing at site.
- Carton numbers keyed to the shop drawings, so the fitter opens carton 3 only when working on elevation C.
- Two tone doors and carcass panels packed as separate, clearly labelled groups — never interleaved in one carton.
- Total gross weight and carton dimensions per group, so you can check lift capacity and doorway widths before delivery.
- Hardware kits identified by the same carton number as the units they serve, not thrown into one loose box.
Edge protection and interior bracing: what to specify in writing
Put the protective scheme into the purchase order, because "well packed" means different things to different factories.
| Item | What to ask for |
|---|---|
| Panel edges | Corner protectors or edge boards on every visible face; no bare melamine panel-to-panel contact. |
| Door fronts | Face-to-face interleaving with protective sheet, finished faces never against strapping or a carton wall. |
| Carton interior | Rigid dividers and bracing so panels cannot shift in transit; cartons full enough not to collapse when stacked. |
| Glazed or illuminated doors | Units combining board with glass or lighting — for example a High Gloss Melamine Cabinets door fronted in glass — crated upright on their own, not flat-packed with plain board. |
| Container stowage | Loading plan showing where cabinet cartons sit relative to heavier goods such as flooring or stone panels. |
Ask for photographs of the loaded cartons and of the container before sealing. That single step gives you a baseline if damage appears on arrival, and it is far easier to request in advance than to reconstruct afterwards.
Sea freight reality: moisture, stacking and the unloading plan
Melamine board tolerates normal indoor humidity; it does not tolerate a container that sweats for weeks at sea. Lineal movement shows up as swollen edges and doors that no longer sit square.
- Ask what moisture barrier is used inside the carton and how many desiccant units are placed per carton, not just per container.
- Confirm the cartons are stowed off the container floor on dunnage, away from the doors and end walls where condensation concentrates.
- Decide Incoterms and unloading responsibility before shipping. Who breaks the seal, who moves cartons inside, and who signs for condition all need naming on the paperwork.
SANTERSON handles logistics and door-to-door delivery, including packing, container loading, customs documentation and shipment tracking. Confirm the specific arrangement for your port and site — transit time, duties and delivery scope vary case by case.
Inspection on arrival: five minutes that saves a re-order
Open cartons in the sequence of the packing list, not at random. Check each against the drawing number before anything is moved into the property.
- Count against the packing list and note any shortfall before signing.
- Check every visible edge for chipping, and run a hand along the joint where the edge band meets the face.
- Lay two doors of the same tone side by side under site lighting to confirm sheen and tint match across batches.
- Photograph damaged cartons in place, before removing contents, with the carton number legible.
- Log hardware against units immediately; missing fixings discovered at installation cause more delay than the panels themselves.
If you are sourcing Matte Melamine Cabinets or a two tone scheme for a villa or apartment fit-out, send the drawings and finish schedule early. We can confirm panel sizes, hardware and carton grouping against your site access before production begins — contact our team to review the packing plan with your quotation.