Wood grain melamine cabinets are one of the most requested specifications in villa and apartment fit-outs, because they give you the look of timber fronts without the maintenance that solid timber doors demand. The difficulty is not finding a supplier who offers them — it is knowing what to ask for, so that the doors, carcasses and hardware you approve on a drawing are exactly what arrives on site months later.

The checklist below follows the order in which decisions actually get made on a project: scope first, then finish and substrate, then construction and hardware, then measurement, logistics and after-sales. It is written for buyers, builders and interior contractors specifying cabinetry from a China-based manufacturer, using our own product range as working examples.

1. Scope: which cabinets are actually in the package

Most specification errors start here. A wood grain melamine front looks right on a kitchen elevation, but the same board can appear again in bedroom storage and in hallway joinery, and each of those is a separate product family with its own door styles and internal fittings. Before you request a quotation, list every run separately:

  • kitchen wall, base and tall runs, including appliance housings and pantry towers;
  • bedroom storage, from sliding-door systems to walk-in layouts;
  • utility, laundry and hallway cabinetry that shares the same front finish.

In our catalogue these are different collections: Wood Grain Melamine Cabinets for kitchens, and Wood Grain Melamine Wardrobes for bedroom projects. Specifying them as one line item is how matching fronts end up arriving from two different production lines with different edge treatments.

2. Finish: grain, sheen and where each one belongs

"Wood grain melamine" covers a wide field of decorative papers and surface textures. Ask for the sheen level and the embossing direction, not just a colour name, and request physical samples before signing off — photographs flatten grain and hide how a surface behaves under raking light.

Wood grain / texturedConceals fingerprints and surface marks; suits family kitchens, high-use villas and rental units. Textured fronts also read as timber at close range.
Solid colour mattePairs with stone benchtops and handleless profiles; shows dust more readily than grain but keeps a quiet, flat appearance.
High glossReflects light in narrow galley kitchens and shortens the visual depth of a run. Expect visible handling marks on fronts within reach of the sink and cooktop.
Two toneGrain on the tall and base runs, a flat colour overhead — a practical way to keep a heavy timber scheme from closing in a small kitchen.

Our melamine kitchen range includes Textured Melamine Cabinets, Matte Melamine Cabinets and Two Tone Melamine Cabinets, so a two-tone scheme can be specified from one collection rather than matched across suppliers.

Ask the supplier to state, in writing, which melamine finishes are offered on which door profile. A grain that looks right on a flat slab front can lose its definition on a routed shaker profile, because the routing cuts through the decorative layer at the moulding.

3. Substrate and edge banding: what sits under the decorative layer

The decorative paper is only the surface. What you buy is a board system, and the buying document should say what the core is and how the edges are closed:

  • Core board. Confirm the substrate used for doors, carcasses and shelves, and confirm it is the same throughout the package unless you have specified otherwise.
  • Edge banding. Ask for the banding material and colour match on all four edges, and how the joint is finished. Thin PVC that telegraphs a visible seam is the most common complaint on timber-look fronts.
  • Moisture-exposed runs. Under-sink cabinets, laundry joinery and outdoor-adjacent kitchens need a substrate and edge system suited to damp conditions — state this per run, not across the whole order.
  • Shelf loading. Long clear spans between side panels deflect over time; ask for the supported span for your shelf thickness rather than assuming it.

Aluminium-frame fronts are a separate route where moisture is the dominant concern, and our kitchen range includes aluminium-frame options such as Aluminium Frame with Solid Panel. They can sit alongside melamine fronts in an open-plan scheme where only part of the joinery is exposed to water.

4. Construction and hardware: the items most quotations leave out

Compare like with like. A quotation that looks cheap usually omits something a competing quotation includes, so require each of the following to be itemised:

  • Carcass construction. How panels are joined, whether the back panel is housed or fixed, and how the unit carries load when it is hung or stacked.
  • Hinges and slides. Brand and model, soft-close or not, opening angle, and the cycle rating the supplier will stand behind.
  • Handle or handleless detail. Profile, finish, and whether routed grooves or edge pulls are compatible with the chosen front thickness.
  • Internal fittings. Pull-out trays, corner mechanisms, laundry hampers and tall-unit storage — each is priced separately, and retrofitting them after production starts is expensive.
  • Integrated lighting. Cabinet lighting and its transformer positions need to be resolved during design, not on site.

Where a project needs non-standard hardware or a bespoke profile, that moves the order from catalogue specification into custom manufacturing. Our Custom & OEM Service covers bespoke finishes and textures alongside made-to-measure sizing, which is the route for apartment schemes that repeat one detail across many identical units.

5. Measurement and drawings: sign off before production starts

Melamine cabinetry is cut to size at the factory, so an error in a dimension becomes a manufacturing error rather than a site adjustment. Two rules keep this controlled:

  • Take final dimensions after the finishes are set — after tiling, plastering and floor levels are fixed, not from architectural drawings alone.
  • Approve shop drawings, not mood boards. The drawing should show every elevation with heights, clear openings, appliance recesses, service penetrations and the position of handles and lighting.

Our Interior Design Services work follows this sequence: brief and design proposal, then quotation with detail confirmation, then production and shipment. Every product in the melamine collections is made to measure with layout tailored to the project, so the confirmed drawing — not a standard module size — governs what gets built.

6. Packaging, freight and site arrival

Cabinetry is heavy, flat and easy to damage at the corners, so logistics belongs on the buying checklist rather than being left to the forwarder:

  • Packaging specification. Corner protection, panel separation and carton marking that matches each unit to its drawing reference.
  • Loading plan. How panels are stacked in the container, so long doors do not travel under point loads.
  • Documentation. Commercial invoice, packing list and origin paperwork ready for clearance; delays here cost more than the freight itself.
  • Delivery address and access. Confirm the truck size your site can receive, and whether delivery goes to the kerb or to the floor.

We handle freight forwarding, customs paperwork, container loading and door-to-door delivery as part of the order, with a coordinator tracking the shipment — see Logistics & Door-to-Door Delivery. Australian import terms, duties and transit time are confirmed case by case for each project rather than assumed from a standard lead time.

7. Installation, inspection and after-sales

The last items on the checklist are the ones that decide whether the job closes out cleanly:

  • Who installs. Confirm whether installers attend the site or whether your own trades do, and what technical guidance comes with the flat-packed units.
  • Snag process. A written inspection list signed off at handover, with a defined route for replacement panels.
  • Warranty scope. What is covered on fronts, carcasses and hardware respectively, and what is excluded — read this before you need it.
  • Spare parts. Whether matching front panels can be re-ordered later, and how finish batches are recorded for future phases of the same project.

Our Installation & After-sales Support covers on-site installation, inspection and snags, warranty work and spare parts. For multi-unit developments this matters most at phase two: a matching front re-ordered after the first phase has to come from the recorded finish specification, not from a photograph.

The checklist in one place

  • Every cabinet run listed separately — kitchen, wardrobe, utility and hallway joinery.
  • Sheen level, grain direction and physical samples approved before sign-off.
  • Substrate, edge-banding material and moisture rating stated per run.
  • Hinges, slides, handles, internal fittings and lighting itemised on the quotation.
  • Final dimensions taken after tiling, plastering and floor levels are set.
  • Shop drawings approved elevation by elevation before production starts.
  • Packaging, loading plan, customs documents and site access confirmed.
  • Installer, snag list, warranty scope and spare-panel route agreed in writing.

Work through those eight items with a supplier who manufactures cabinetry, wall panelling, flooring, lighting and bathroom fixtures under one roof, and the number of separate contracts on a project drops sharply. SANTERSON furniture and building materials supply fit-out packages for villa, hospitality and office projects, with cabinetry coordinated against the flooring, wall panels and lighting in the same scheme — send us your drawings and we will quote the joinery against them.

Send drawings and room dimensions to request a quotation. The contact page lists business hours as Monday–Saturday, 8:00 AM–6:00 PM (GMT+8), and states that enquiries receive a response within 24 hours.