A wardrobe submittal is the document pack a contractor, designer or homeowner reviews before a lacquered joinery order is released for production. For Matte Lacquer Wardrobes, which are made to measure for each project, the submittal is where finish, layout and dimension decisions get locked down in writing. Below is the checklist we work from on residential wardrobe packages, together with what each item needs to say before you sign off.

1. Confirmed dimensions and opening conditions

Our Matte Lacquer Wardrobes are supplied as made-to-measure units, so the submittal must carry dimensioned drawings taken from the finished room, not from the structural drawing set. Note floor finishes that will be laid after the survey, ceiling linings, skirting, and any services running along the wall. Where a wall is out of plumb or a ceiling slopes, show it on the elevation and state how the carcass will be scribed or packed. Record heights, widths and depths for every module, plus the clearance needed for doors and drawers to swing clear.

2. Finish schedule with samples

Matte lacquer reads very differently under warm and cool light, so a colour name alone is not enough. The submittal should list the finish for each surface — door fronts, carcass exteriors, internal boxes and any open display niches — and reference an approved physical sample with a date and approval signature. If your scheme also uses High Gloss Lacquer Wardrobes or Neutral Tone Lacquer Wardrobes in the same bedroom or dressing room, put all of them in one schedule so sheen levels and tones are compared side by side rather than judged separately.

3. Substrate and construction specification

State the board material for carcass, doors and back panels, the edge treatment on visible edges, and the hardware brand or series for hinges, slides and handles. Our Lacquer Wardrobes collection allows material and finish options to be specified per project, so the submittal should name exactly what has been chosen rather than leaving it as an allowance. Where a room is prone to humidity, say so here and confirm which substrate and edge sealing have been selected for that condition.

4. Internal layout and storage plan

Layout is tailored project by project, so the submittal needs an internal elevation for every module: hanging rails and their heights, shelf spans, drawer banks, pull-out hampers, and any lighting provisions. Mark adjustable shelves so site teams know what can move later. Check the layout against how the space will actually be used — daily wardrobe versus seasonal storage — and confirm that drawer fronts clear carpets, bed frames and adjacent doors.

5. Door type and operation

Identify each door as hinged, sliding or open, and give the swing or travel direction with a clearance diagram. Sliding configurations need the track detail and the overlap between panels; hinged configurations need the reveal to the wall and to the neighbouring unit. If the design hides the wardrobe behind flush or concealed doors, state the alignment tolerance expected on site. Where the same bedroom also uses Glass Sliding Doors to separate the dressing area, keep track heights and frame profiles consistent between the two.

6. Tolerances, finishes on site and interface details

Show how the unit meets the floor, ceiling and side walls, including scribe strips, shadow gaps and silicone joints. State who is responsible for making good around the unit after installation. These small interface notes are where most snagging lists grow, and they belong in the submittal rather than in a site conversation.

7. Packaging, delivery sequence and installation plan

Include packing details, carton marks matched to the room-by-room schedule, the delivery address and access route, and the planned installation window. For villa and apartment packages ordered together with other joinery, confirm the sequence so wardrobes arrive after wet trades have finished in that room.

8. Approvals, responsibilities and open items

Close the submittal with a signature block for the client or designer, the contractor and the supplier, plus a dated list of unresolved items — pending samples, unconfirmed handles, dimension checks still outstanding. Production should not start until those items are cleared in writing.

How we prepare the pack

SANTERSON has been manufacturing furniture and building materials since 2008, and wardrobe packages go through our Custom Furniture Design and Prototyping service, where drawings, material selection and finishes are confirmed with the project team before production. Drawings and specifications for your wardrobe package are reviewed with you at the detail-confirmation stage, then coordinated through production, Furniture Logistics and Door-to-door Delivery and on-site installation support. Send us the room dimensions and finish direction, and we will return a submittal pack you can circulate for approval.

For wardrobe drawings, finish samples or a quotation, contact SANTERSON — PHILLIP, +86-13928214007, santerson@qq.com.