A set of classic French double doors can carry the character of a villa entrance, a hotel suite threshold or a dining room opening onto a terrace. It is also one of the more expensive items on an interior schedule to get wrong, because the doors arrive made to measure and cannot be trimmed back on site. The safest way to reduce that risk is to compare two things before you place the order: a physical sample of what you are buying, and a written proposal that says exactly what is included. The steps below are written for buyers, contractors and project coordinators sourcing Classic French Double Doors for a residential or hospitality project.
Why the Sample and the Proposal Decide the Outcome
French double doors are a pair of hinged leaves, usually glazed with multiple lights, hung in one opening. Because they are specified as made-to-measure units with project-specific dimensions and finish options, the factory builds to your paperwork rather than to a stock catalogue size. Two things follow from that.
First, an approved sample becomes the reference for colour, grain, profile shape and glass appearance across every set in the order. Second, the proposal determines whether the price you accepted covers frame, leaves, glazing bars, hardware, finishing and packing — or only part of them. A supplier who quotes a lower figure by leaving items out is not cheaper; the omissions simply appear later as variations.
What to Ask for Before You Compare Anything
Request the same package from every supplier you are evaluating, so the comparison is like for like. For a classic French double door enquiry, that package should include:
- A physical sample or approved mock-up showing the stile and rail profile, the moulding around each light, the finish colour and sheen, and the type of glass specified.
- A dimension drawing for each opening, with clear opening widths, leaf widths, door height, frame section sizes and floor finish levels marked.
- A written schedule listing every set by opening number, with quantity, size, swing direction and hardware group.
- A quotation that states what is included and what is excluded, in the same units of measure as the schedule.
- Lead time from approved drawings to despatch, plus packing specification and shipping terms if the doors are travelling internationally.
If a supplier will not provide one of these items, note it as a gap rather than assuming the item is covered. Doors quoted on a single line price with no drawing are the hardest to hold to later.
Comparing Samples: A Practical Scorecard
Lay the samples side by side under the same light as the room they will be installed in, and judge them against your design intent rather than against the photograph on a website. Work through these points in order.
Profile and proportion
Classic French doors depend on proportion. Compare the width of the stiles and rails, the depth of the moulding around each light, and how many lights sit in each leaf relative to door height. A sample that looks right on a desk can read as heavy or thin once it is 2,000 mm tall. Ask for a full-height corner mock-up, or at least a full-section sample of one stile with its moulding, if the design is sensitive to proportion.
Finish colour and sheen
Check the sample against your paint or veneer schedule in both daylight and artificial light. Record the finish by name and code on the sample itself and have the supplier countersign it, because "cream" and "oiled oak" mean different things to different factories. Note whether the finish is sprayed or pressed, and whether edges and the reverse face are finished to the same standard as the front — an unfinished edge is a common source of variation charges.
Glass and glazing bars
Confirm the glass type in the sample, its thickness if stated, and whether the glazing bars are true divided lights or applied bars over a single pane. The visual difference is significant and the price difference is real, so it must be recorded on both the sample and the proposal.
Hardware as fitted
Test the sample with the handles, hinges, lock case and any astragal or meeting-stile bolt you intend to use. Check how the leaves meet, whether the hardware is supplied loose or pre-mounted, and whether the supplier provides the fixing detail for the frame.
Comparing Proposals: Line by Line
Once samples are approved, compare the written proposals using the same columns for each supplier. The table below shows what to record and what usually goes missing.
| Item to compare | What a complete proposal states | Common gap |
|---|---|---|
| Scope per set | Two leaves, frame/lining, glazing, finishing, hardware group | Frame or lining quoted separately after order |
| Dimensions | Opening number with width, height and wall build-up | A single "standard size" price with no drawing |
| Material and finish | Named substrate, veneer or paint system matched to the signed sample | "Similar to sample" wording |
| Hardware | Handles, hinges, locks, bolts, quantity per set, brand or model | Hardware listed as "supply only by others" |
| Finishing standard | Both faces and edges finished, site-touch-up allowance stated | One face finished only |
| Packing and delivery | Packing method, container or pallet plan, delivery point, Incoterms | Ex-works price presented as delivered price |
| Lead time | Weeks from approved drawings and deposit to despatch | Lead time given from enquiry instead of approval |
| Variations | What happens if site openings differ from the drawing | No re-measure or remake clause at all |
Add up each proposal on a total-delivered basis, not on the unit price. A door priced lower per set but quoted ex-works, with hardware and packing excluded, usually lands higher than a fuller quotation once freight and site fixes are added.
Red Flags Worth Pausing On
- The sample is approved before the dimension drawing exists. Approve drawings first, then the sample against them.
- Two suppliers quote different leaf counts or light patterns and neither drawing shows which was assumed.
- Finish is described only by a photograph. Insist on a signed physical sample.
- The quotation covers "doors" without naming frame, glazing, hardware and finishing.
- Lead time is quoted from today rather than from your approval of drawings and deposit.
- No named contact for production queries during manufacture.
How a One-Stop Supplier Changes the Comparison
When doors are bought as part of a wider package — joinery, wall panelling, flooring and built-in furniture from one manufacturer — the comparison shifts. You are no longer judging one door price but how well the door finish matches everything else made in the same factory. That is where Decorative Interior Doors and integrated panelling become relevant: a classic French double door specified alongside matching wall panels and cabinetry can be finished from the same paint or veneer batch, which removes most colour-matching risk between trades.
If your scheme leans contemporary rather than traditional, compare the alternative collections in the same way before committing. Modern Slim Frame French Doors and Arched French Doors are configured the same way — made-to-measure sizing with material and finish options — so a single sample-and-proposal routine covers all three.
For enquiries about a doors schedule, the project team can be reached through the contact page. Send your opening schedule and finish reference with the enquiry and you will receive drawings and a line-item proposal to compare.
A Simple Sequence That Works
- Issue one opening schedule and one finish reference to every supplier, so all bids start from the same information.
- Ask for drawings first; approve sizes and swing direction before any sample is cut.
- Request physical samples against approved drawings, sign and date them, keep one set on site.
- Compare proposals in a single spreadsheet using the columns above, priced delivered to site.
- Re-measure openings on site against the approved drawing before manufacture starts.
- Confirm despatch date from the approval date, and agree in writing how out-of-tolerance openings are handled.