A quote for the Outdoor Swim Spa WS-S10 can look complete and still leave the most expensive decisions open. Ten-metre swim spas are configured, not ordered: shells, pumps, jets, heating and freight options all move the price, and two quotes for the same model can differ a lot once you compare what is actually inside them. The checklist below follows the order we suggest you work through before you sign anything.
1. Confirm the shell size against your site, not the other way round
The catalog lists the WS-S10 at 10000 × 2200 × 1420 mm. Before reading any price line, check that footprint against the deck, terrace or plot where it will sit, including access routes for delivery and crane or forklift unloading. A swim spa is a structural load as well as a water volume, so the substrate and drainage decisions belong to your engineer.
Ask the supplier to state the overall dimensions, shell depth and installation clearances in writing, and to say which figures are fixed and which change with the configuration you choose. If your site cannot take that length, ask what shorter models in the same range offer instead of forcing a ten-metre unit onto a tight plan.
2. Read the equipment list line by line
This is where quotes for the same model diverge most. The specifications captured for the WS-S10 on our site show two water pumps, one filter pump, 76 jets in total, one LED light plus 40 small LED lights, and a control system listed as one set, with water jets, LED lighting and ozone shown as the featured functions. Total power is shown as 7.65 kW for that configuration.
Now compare your quote against those items:
- Are the pump quantities and duties identical, or has one pump been quietly dropped to lower the price?
- Is the jet count a firm number for the shell you are buying, or an "up to" figure that depends on layout?
- Does the LED allowance cover both the main light and the small lights, or only one of them?
- Is ozone included as standard, and is UV sterilisation quoted as an option with its own price?
- Which control system is named, and what does it actually operate — jets, temperature, lighting, filtration cycles?
If your quote does not match the equipment you want, ask for a revised version that itemises each component. A single lump-sum line for "spa body and equipment" is the fastest way to end up with something different from what you pictured.
3. Check what is excluded as carefully as what is included
Options that sit outside a base swim spa price usually include heat pumps, sand filtration, extra water pumps, insulation, steps and additional control systems. These are catalog-listed options for this range, and availability and compatibility vary by model, so ask the supplier to confirm each one for the WS-S10 specifically rather than assuming it fits.
Electrical supply is the other common gap. The unit needs a dedicated supply sized to its load, and local wiring rules, earthing and protection are your contractor's responsibility. Ask the supplier to state the electrical requirements for the exact configuration quoted, then hand those figures to your electrician early — this is where projects lose weeks when it is left until the shell arrives.
4. Match the model name to the specification sheet
Model codes in this range carry suffixes, and variants such as WS-S10-T are separate products with their own pages. A quote should name the exact model and attach the matching specification sheet, so you can confirm that the dimensions, jet count and power figures on the paperwork describe the unit you will receive. If a quotation mixes two model names, ask for it to be reissued.
The same care applies if you are comparing alternatives such as Outdoor Swim Spa WS-S12 or the longer hydrotherapy layouts in the catalogue. Compare like with like: same length band, same equipment count, same options.
5. Put the commercial terms next to the technical ones
Once the specification is fixed, the remaining questions are about delivery and accountability:
- Which Incoterm applies, and does the price include freight, insurance and customs clearance to your site?
- What container and unloading arrangement is assumed, and who provides the crane or forklift?
- What packaging and loading plan protects the shell and glass components in transit?
- Which documents come with the shipment — invoice, packing list, certificate of origin, manuals and wiring diagrams?
- What warranty applies, what counts as a spare part, and who supports commissioning on site?
As a one-stop furniture and building materials supplier, we handle swim spas inside the same workflow as cabinetry, outdoor furniture, lighting and finishes, so one purchase order can cover several trades. That is an advantage only if the quote separates each product line clearly enough for you to check it.
6. A quick comparison grid to run on two or three quotes
| Item to compare | What a clear quote states |
| Shell and footprint | Overall dimensions, shell depth, installation clearances, access route |
| Water side | Pump quantities and duties, filter pump, jet count, filtration cycle |
| Comfort and lighting | Control system named, LED main light plus small lights, water features |
| Water treatment | Ozone standard or optional, UV sterilisation priced separately |
| Energy | Total power for the quoted configuration, insulation and heat pump options |
| Options | Steps, sand filtration, extra pumps, control upgrades, each with a price |
| Delivery | Incoterm, freight and insurance, container plan, unloading responsibility |
| After the sale | Warranty scope, spare parts, commissioning and on-site support |
Fill this grid for every quote you receive. Differences that look like price gaps usually turn out to be scope gaps, and those are the ones that cost money later.
Send us the site drawing and the functions you want from the water side, and we will issue a specification-first quotation for the WS-S10 or a closer fit from the wider Swimming Pools and Swim Spas range — including freight, packaging and the option list priced line by line.