A materials schedule that covers wardrobes properly is rarely one line long. Across the villa and apartment packages we supply, the joinery line usually carries several different door build-ups between room types, and each one needs its own note on substrate, surface, edge detail, hardware set and opening method. Glass & Acrylic Combination Wardrobes sit in that mixed group: a glazed element and an acrylic panel on the same run, which means two sets of specification detail have to be settled before anyone can price or build it.

The practical difficulty is not choosing the look. It is keeping a combination item legible inside a schedule that also carries kitchen cabinetry, wall panelling, doors and flooring, so that the person pricing it, the person manufacturing it and the person installing it are all reading the same requirement.

Why combination wardrobe fronts get mis-scheduled

Most schedule templates assume one finish per line: a single door type, one colour code, one hardware note. Combination fronts break that assumption in three predictable ways:

  • Two materials, two tolerances. The glazed leaf and the acrylic leaf are produced by different processes and finished at different stages. Written as one line, the schedule loses the detail that decides cost and lead time.
  • Glass appearance is often left blank. "Glass" is not a specification. Tint, opacity and surface treatment change both appearance and handling requirements.
  • Frame and edge detail get assumed. A slim framed perimeter and an unframed butt-jointed edge are not interchangeable on site, yet schedules frequently record only "wardrobe door".

Our built-in furniture range is made to measure, with finish, layout and dimensions specified per project rather than selected from fixed modules. That flexibility is exactly why the schedule has to be specific: the drawing and the line item have to agree on what each elevation is actually made of.

Set the scope before you write the line

Work through the whole project rather than the master bedroom alone. Wardrobes appear in guest rooms, secondary bedrooms, kids' rooms, corridors and sometimes laundry or utility joinery, and each location carries a different level of visual exposure.

LocationWhat the schedule needs to settle
Master bedroom and dressing roomWhere the glazed leaf is acceptable, how much transparency is wanted, internal layout and lighting provisions.
Secondary bedrooms and guest roomsWhether the acrylic face repeats the master treatment or drops to a plainer door build-up for cost control.
Kids' rooms and corridorsImpact resistance, edge protection, handle choice and how often the surface will be wiped down.
Utility and laundry joineryWhether doors match bedroom joinery visually while using a different internal fit-out.

Grouping locations this way lets you write one specification per family of doors instead of repeating the same paragraph room by room. If the glazed element only appears in the master dressing room, say so explicitly and note what replaces it elsewhere.

Split the combination into rows that can actually be priced

Treat a combination front as two specified components under one assembly reference. The assembly row carries the elevation, the room, the opening method and the overall made-to-measure envelope. The component rows carry what the manufacturer needs.

Component rowInformation to record
Glazed leafGlass appearance (clear, frosted, smoked, bronze or ribbed as shown across the collections), frame material and finish, perimeter detail, opening method.
Acrylic leaf or panelSurface effect, colour reference, grain direction if relevant, edge treatment, handle or handleless detail.
Carcase and internal fit-outPanel material, thickness at visible edges, hanging zones, drawer banks, shelf bays, integrated lighting provision.
Hardware setSliding or hinged gear and track type where sliding doors are used, confirmed against the selected door weight.

The wardrobe collections on our site already separate these build-ups, which gives you real reference points rather than invented codes. For the glazed side, compare Aluminum Frame Glass Wardrobes, Smoked Glass Wardrobes and Frosted Glass Aluminum Frame Wardrobes. For the acrylic side, compare Matte Acrylic Wardrobes with White Acrylic Wardrobes. Naming the reference items in the schedule means a substitution later is a visible decision, not a silent one.

Coordinate the schedule with the rest of the package

Wardrobe fronts do not exist on their own wall. In a whole-project package they meet skirting, flooring, wall panelling, ceiling lines and interior doors, and those junctions are where schedules fall apart if each trade specifies independently.

A few junctions worth resolving in the same document:

  • Flooring to wardrobe threshold. Sliding door tracks need a defined floor build-up and a clear running line, so the flooring row and the wardrobe row should reference each other rather than being written separately.
  • Wardrobe face to wall finish. Where wall panel systems or veneer panelling run past a wardrobe, record which element is installed first and how the reveal is closed.
  • Interior doors to joinery. Where a glass sliding door or flush door shares an opening with built-in storage, the frame detail has to be drawn once and quoted once.
  • Lighting provision. Integrated lighting inside glazed wardrobes needs a driver location and a switching point decided at first fix, not at handover.

This is the practical argument for buying the package from one furniture and building materials supplier. When cabinetry, doors, panelling and flooring come through a single production and coordination process, the junctions get resolved in one drawing set instead of being argued about on site between separate contractors.

Put the finishing decisions in writing early

Acrylic surfaces are where schedules most often go vague, because a word like "white" covers a wide range of actual product. Two things settle it quickly:

  • Approve a physical sample, not a screen value. Surface depth and sheen read differently under bedroom lighting than under showroom lighting. Sample approval before production removes the argument afterwards.
  • Record the direction of any grain or metallic effect. Panels with directional surfaces have to be cut consistently across a run, otherwise adjacent doors will not match even when they carry the same code.

Our Custom & OEM Service covers bespoke finishes, textures and material choices, so the schedule can specify an outcome and then have it confirmed against approved samples before manufacture rather than discovered at installation.

A short checklist for the wardrobe section

  • Assembly reference tied to a numbered elevation drawing.
  • Made-to-measure envelope dimensions, with the finished floor level stated.
  • Glazed component specified by appearance and frame detail, not just "glass".
  • Acrylic component specified by surface effect and approved sample reference.
  • Opening method stated for every door, with hardware set named.
  • Internal fit-out listed per unit: hanging, drawers, shelves, lighting provision.
  • Adjacent finishes cross-referenced: flooring, skirting, panelling, ceiling.
  • Substitutions flagged as revisions with a date and an approver.

How we support the schedule stage

Send us the wardrobe section of your materials schedule and we will price it against the build-ups available to us, flag anything ambiguous, and return a specification you can issue rather than a quotation full of assumptions. Our interior design services cover space planning, furniture layouts and production coordination, and where a project needs something outside the standard catalogue we build it to your drawings.

Because we supply furniture and building materials through one process — design consultation, material selection, manufacturing, logistics and installation — the schedule does not have to be perfect before you send it. It has to be complete enough that every open question becomes visible at quotation stage, which is where it costs least to resolve.

Working up a materials schedule for a villa, apartment or hospitality fit-out? Contact SANTERSON with your drawings and wardrobe list, and we will return specified options for the glazed and acrylic elements alongside the rest of the joinery package.