A wardrobe package is rarely the headline item in a commercial fit-out, yet it appears in almost every room type you are specifying — guest rooms, serviced apartments, spa changing areas, staff accommodation and owner suites in mixed-use villas. When a supplier sends over a Smoked Glass Aluminum Frame Wardrobes proposal, the difference between a good buy and an expensive problem usually comes down to what is written on the drawings, not the photograph. The following evaluation checklist is what we would ask a buyer or consultant to verify before signing off a quotation.

Start with the scope line, not the finish

Glass-fronted, aluminium-framed wardrobes sit inside our Built-in furniture range, which means they are manufactured to the opening rather than picked off a shelf. Before comparing prices, confirm that every quotation you receive states the same basis of supply: made-to-measure sizing, the layout agreed with your design team, and the material and finish selection for that particular project. Two proposals that look identical on a product sheet can differ once one party has priced a wardrobe carcass to a nominal depth and the other to the measured room dimension.

Our product pages list made-to-measure sizing, material and finish options, and a layout tailored to the project as the standard configuration points for this collection. Ask for each of those three items in writing, per unit, so that site variations are priced rather than argued about later.

What a smoked glass front actually changes on site

Tinted glass is chosen for visual reasons — it softens reflections, reads darker than clear glass under warm hospitality lighting, and hides the fact that a hanging rail has been over-packed. What matters commercially is how that choice interacts with the rest of the elevation. Three things to check on the proposal:

  • Framing colour against joinery. The same tinted glass reads warm next to a bronze frame and cool next to a dark grey one. Ask for a physical sample board of frame plus glass together, not two separate swatches.
  • Interior visibility. A darker front reduces what is legible from the room. Confirm whether interior lighting is included in the quotation or left to the electrical contractor; if it is excluded, note it as a coordination item on your drawings.
  • Handling and access. Glass-fronted doors are heavier than a plain panel. Check that the proposal names the door type, the hardware set and the clearance needed for the door to travel — especially in a corridor-room where the bed layout is tight.

Read the drawing pack before you read the price

For any commercial quantity, request the shop drawings for the first batch and check them against your own room data sheet. On a wardrobe proposal this is where we would expect to see overall width, height and depth tied to finished floor and ceiling levels; the position of hanging rails, shelves and drawers; the door elevation with handle or profile detail; and the fixing method relative to the wall build-up. Where the drawing shows a dimension that does not match your architectural setting-out, resolve it before production starts — a made-to-measure unit cannot be trimmed on site.

If you are procuring through a design-and-build route rather than issuing drawings yourself, ask which party signs off the final dimensions. That single line in the contract decides who carries the cost of a variation.

Product names and specification wording on this page follow the titles published on santerson.com. Confirm dimensions, glass tint, frame finish and hardware for your own project before ordering — nothing in a marketing article substitutes for the approved shop drawing.

Comparing the alternatives in the same collection

Commercial buyers often ask whether they should standardise on one glass type across a building or vary it by room. Both approaches are workable, and the trade-off is procurement simplicity against design interest. These are the closest variants we manufacture in the aluminium-framed group:

Variant Where it usually lands in a project Procurement note
Smoked Glass Aluminum Frame Wardrobes Guest rooms and suites where a darker, lower-glare front is wanted Good candidate for building-wide standardisation
Clear Glass Aluminum Frame Wardrobes Showroom units, display areas and brighter corridors Contents are visible, so internal layout quality matters more
Frosted Glass Aluminum Frame Wardrobes Spa, changing and shared bathroom zones where privacy is required Diffuses light rather than tinting the view
Bronze Glass Aluminum Frame Wardrobes Schemes already carrying bronze metalwork or warm-toned joinery Coordinate with the frame colour, not just the glass
Aluminum Frame Glass Wardrobes The general glass-fronted family when no tint is specified yet Useful starting point for early-stage budget pricing

If you are furnishing a villa or apartment package rather than a single room, it is usually worth specifying one frame profile across all wardrobes and varying only the infill. That keeps hardware, spares and site detailing common while still letting the design change from room to room.

How the commercial terms should read

SANTERSON has operated as a China-based furniture and building materials manufacturer since 2008, supplying project customers in hospitality, villas and offices. Because our wardrobes are made to order, the quotation you receive should describe the manufacturing and coordination route rather than a stock lead time:

  • Detail confirmation before production. Our stated cooperation steps run from project brief and design proposal through quotation and detail confirmation to production, shipment and follow-up. Nothing should enter the factory until your signed drawings are in hand.
  • Custom and OEM options. Bespoke finishes, textures and branding can be specified where a project calls for them; confirm what is available for your order quantity before treating an option as standard.
  • Freight and delivery scope. Sea, air and rail freight forwarding, customs paperwork, packaging and container loading and door-to-door delivery are services we arrange. Incoterms, duties and delivery point should be stated on your proforma so landed cost is not guessed.
  • Site support after arrival. Installation, inspection of snags, spare parts and maintenance support are part of the service scope; ask which elements apply to your site and how they are priced.

A useful discipline is to price two scenarios: wardrobes supplied as loose units with local fixers, and wardrobes supplied with our coordination support on site. The gap between them tells you quickly whether the cheaper quotation is genuinely cheaper once your own supervision hours are counted.

Five questions that separate a serious proposal from a catalogue reply

  1. Which measured dimensions were used, and who measured them?
  2. Is the glass tint and frame colour identified by name on the quotation, matching an approved sample?
  3. Are hardware, door travel clearance and interior lighting included or excluded — and stated either way?
  4. What is the sequence for drawing approval, and what happens to the price if a dimension changes after sign-off?
  5. What is the delivery term, and who handles fixing on site?

If those five questions come back with clear answers, the proposal can be compared line by line against your competitors. If they come back vague, compare nothing — go back for a revised submission.

Frequently asked questions

Can smoked glass fronts be used in high-traffic guest rooms?

Yes, they are specified in guest room and suite environments. What you should confirm for a commercial quantity is the door type, hardware specification and the access clearance on the actual plan, because those items — not the tint — drive how the unit performs under daily use.

Do you make wardrobes to non-standard ceiling heights?

The collection is supplied made-to-measure, with layout and dimensions specified to suit each space and project. Floor-to-ceiling solutions are common in villa and apartment packages; the relevant dimension is the finished level, so provide your architectural setting-out rather than a structural height.

Can we mix glass types within one building?

Yes. Keep the frame profile and hardware common and vary only the infill — smoked, clear, frosted or bronze — so that detailing, spares and site instruction remain consistent.

Send your room data sheet or drawings and we will price the wardrobe package against them, including finish samples for review. Enquiries reach our team through the contact page, and our service scope covers design coordination, custom/OEM manufacturing, logistics and on-site support.