Built-in joinery is where whole-project materials schedules usually start to break down. The cabinetry appears as one line item, while the glazing, hardware, lighting and fixing details that decide whether it can actually be manufactured and installed are left to a later email. Santerson Glass Front Media Units sit in exactly that category: configurable, made for residential living projects, and easy to under-specify if they enter the schedule too late. This guide shows how procurement teams can carry glass front media units through a whole-project schedule alongside flooring, wall finishes and loose furniture, so one package does not stall the rest.

What a media unit actually contributes to a materials schedule

A media unit is small compared with a wardrobe run or a kitchen, but it touches more trades than most built-in pieces. It carries screen and equipment loads, needs ventilation and cable routes, and its glazed fronts have to match the glass already specified for wardrobes, screens and partitions elsewhere in the dwelling. When it is scheduled as furniture only, those interfaces disappear from the drawings until someone discovers them on site.

Our TV Cabinets / Media Units range is described on each product page as configurable: finish, layout and dimensions are specified to suit the space and the project. That flexibility is the reason the unit belongs in the materials schedule rather than a late furniture order — the schedule is where the finish family, the glass type and the adjacent wall build-up get locked down together.

Step 1: place the unit inside the joinery group, not the furniture group

Start by grouping media units with the other built-in work — custom built-in kitchen cabinets, wardrobes and wall panelling — because they share the same decision chain: substrate, finish, edge treatment, hardware and glazing. Two practical consequences follow:

  • One finish board covers the whole group. A veneer, lacquer, melamine or acrylic family selected for wardrobes can be carried across to the media unit fronts, so the schedule lists a single approved finish reference instead of three competing ones.
  • Glazing is specified once. Clear, bronze, frosted and smoked glass appear across our bronze glass wardrobes, smoked glass wardrobes and related collections; repeating the same glass call in the media unit line keeps the specification short and avoids a second glazing schedule.

Practical check: before any line is priced, confirm that the finish reference used for the media unit exists in the same collection as the wardrobes it will sit next to. A finish shown on a loose furniture sample rarely carries across to made-to-measure cabinetry without a separate confirmation.

Step 2: write the line item so it can be quoted and manufactured

A workable schedule row for a glass front media unit carries six fields. Missing any one of them turns the row into an assumption.

Schedule fieldWhat to record
Location and room codeWhich living area, and whether the unit is wall-mounted, floating or part of a full-height media wall.
DimensionsWidth, height and depth as set-out dimensions from the drawing, including clearance for skirting, cornices and adjacent cabinetry.
Body and front finishThe approved finish reference, not a trade name such as "oak look".
Glass type and frameGlass colour and texture, plus the frame profile around the glazed front where one is used.
Storage layoutShelf, drawer and open-bay arrangement, and which bays are reserved for equipment.
Services interfaceCable routes, sockets, ventilation openings and any lighting provision, cross-referenced to the electrical drawing.

Our configurable listings carry limited technical detail on the product page itself, so dimensions, materials, hardware and glazing selections are confirmed per project rather than read off a catalogue sheet. Build that confirmation into the schedule as a named milestone with a date, and let it gate production release.

Step 3: resolve the interfaces before pricing

Three clashes account for most rework on media walls, and all three are visible at schedule stage if the adjacent lines are read together:

  • Flooring threshold. A floating or wall-mounted unit set out from a finished floor level needs the engineered wood flooring build-up confirmed first. Where European oak plank or parquet runs up to the joinery, the setting-out dimension and the skirting detail change the unit's height and shadow gap.
  • Wall build-up. Wall-mounted media walls and wall mounted media walls depend on what is behind the finish lining. Fixings, backing timber and load paths belong to the wall package; the joinery drawing should show them rather than assume them.
  • Lighting and electrical. Where integrated lighting is specified in the integrated LED media units family, the driver location, switching and cable provision must appear on the electrical drawing before the unit goes into production.

Practical check: ask for a single coordinated elevation that shows flooring, wall finish, media unit and services together. If that drawing cannot be produced, the schedule is not ready for pricing — and pricing off an uncoordinated set is what generates variation orders later.

Step 4: keep the whole package on one approval track

Whole-project schedules work when related packages move through approval at the same speed. Coordinating built-in joinery, whole house custom cabinetry and built-in storage, flooring and finishes under one supplier removes the hand-offs where details are usually lost: separate sample boards, separate finish codes, separate confirmations. Our interior design services cover space layout planning, furniture layouts and 3D visual renderings, plus project design coordination across drawings, production and on-site guidance — which is where a media unit detail gets resolved rather than deferred.

Where a project needs non-standard dimensions, finishes or hardware, our custom and OEM service covers bespoke finishes and textures alongside manufacturing. For schedules that also cover wall cladding, decorative panels and ceilings, the same confirmation logic applies: reference the approved sample, not the product name.

Common mistakes to avoid

  • Scheduling the unit as a catalogue item. Configurable units have no single fixed size or finish; the row must carry project-specific dimensions and references.
  • Naming a glass colour without texture. "Bronze glass" can mean several different products; specify the exact glazing used elsewhere in the project.
  • Leaving ventilation to site. Equipment bays need ventilation and access specified on the drawing, not improvised during installation.
  • Approving finishes from photography. Screen images do not substitute for physical samples when veneer, lacquer and glass are being matched across packages.

A short pre-production checklist

  • Room code, setting-out dimensions and mounting method recorded against the drawing revision.
  • Body and front finish reference approved, cross-checked against wardrobes and kitchen cabinetry.
  • Glass type, frame profile and door or drawer layout confirmed in writing.
  • Cable routes, sockets, ventilation and lighting provision shown on coordinated services drawings.
  • Adjacent flooring and wall build-up fixed, so threshold and shadow-gap details hold.

Glass front media units are small enough to be overlooked and detailed enough to cause rework. Put them in the joinery group of the materials schedule, specify the six fields above, resolve the flooring, wall and electrical interfaces before pricing, and keep them on the same approval track as the rest of the built-in work.