A full height media wall looks simple on a rendering and complicated on site. One panel run has to carry the television, hide the wiring, sit flush with adjoining wall panelling, match the finish of nearby cabinetry, and still arrive in the right pieces so the installer can put it up in a day rather than three. Most of the rework we see on villa and apartment projects comes from quantities and product coordination being decided too late, when the units are already in production or already on the ship.
This guide walks through how we quantity-take and coordinate Santerson Full Height Media Walls on residential and hospitality projects: what to measure, how the wall is broken into orderable modules, which adjacent products have to be specified at the same time, and what to confirm before a purchase order is released.
Start with the wall, not the unit
Full height means floor to finished ceiling, so the first quantity you need is not a width in millimetres but a set of levels. In new build this is straightforward. In renovation and refurbishment — which covers most of the villa work we supply — floor levels drift and ceilings are rarely square across a six or seven metre run. Take the dimension at left, centre and right for both width and height, and note the finished floor level and finished ceiling level separately from the structural slab.
- Width of the run at three points, plus the depth available clear of any skirting, cornice or protruding column.
- Floor-to-ceiling height at each end, so the top scribe or filler panel can be cut to the actual site condition.
- Position of the TV centre line relative to a fixed reference point, such as a room corner, not to an existing opening that may change.
- Wall construction behind the run. Solid wall and stud wall take different fixings, and heavy panel runs on stud wall need noggins or a backing batten set out before the wall is closed up.
- Location of existing sockets, switches, data points and any floor outlet that falls inside the run.
Send those measurements with your enquiry rather than a single nominal figure. Made-to-measure sizing on these systems is set from site dimensions, and a nominal width taken off a drawing usually produces a unit that needs trimming on site, which costs finish quality at the reveal.
How the wall becomes an order: modules, not one big box
A full height media wall is quoted and packed as a set of modules that are assembled in sequence on site. Breaking the run down module by module is what makes the quantity list usable for both pricing and installation, and it is also how you keep the freight split sensible when other fit-out items are on the same container.
| Module group | What to quantity-take | Coordination point |
|---|---|---|
| Closed carcass panels (floor to ceiling) | Width and height of each bay, number of bays, which bays carry doors | Set out from the TV centre line so the panel joints do not clash with the screen edge |
| Open niches and shelving bays | Niche count, shelf spans, clear opening sizes for anything being displayed or stored | Shelf spans are limited by span and load; heavy display items need a fixed shelf or backing |
| Media bay / TV panel zone | Screen size and mounting type, VESA plate or recess, ventilation requirement for the equipment cavity | Confirm the screen model before production, because the bracket and cable route are built around it |
| Base storage and drawer units | Drawer count, hardware type, whether appliances or consoles sit inside | Appliance heat and access panels must be planned with the cavity, not added later |
| Filler, scribe and top trim panels | One set per end plus a top scribe sized to site levels | Cut on site from the supplied allowance; do not order to the drawing dimension alone |
| Integrated lighting (where specified) | Niche and shelf runs that are lit, driver positions, switch or sensor location | Driver access must stay reachable; sealed cavities make service impossible |
Where the design mixes closed storage with display, quantity them as separate lines. It keeps substitutions visible during approval and stops a niche being quietly swapped for a door after production has started.
Coordinate the adjacent products at the same time
A media wall rarely stands alone. It meets flooring, wall panelling, doors and sometimes a fireplace or a stone surround, and every one of those junctions is a coordination decision that has to be made before either product is manufactured. Ordering the wall in isolation and the rest later is where finishes stop lining up.
- Flooring. Decide whether the media wall sits on the finished floor or the screed. If engineered wood such as our European Oak Engineered Wood Flooring runs under the carcass, the unit height and the skirting detail both change, and the flooring has to be laid before installation.
- Wall panelling and plasterboard. Where the media wall abuts decorative panelling, confirm which product returns first and how the reveal is detailed. Panel thicknesses differ, so the shadow gap or trim needs to be agreed on the drawing.
- Doors. If a concealed or flush door falls within or beside the run, its frame depth has to match the panel line, otherwise the door sits proud of the wall face.
- Lighting. Integrated lighting inside the media units is specified with the joinery, but it shares drivers and circuits with room lighting. Issue one electrical layout covering both rather than two separate ones.
- Loose furniture. Sofa sight lines and console depth in front of the wall affect drawer clearance, so confirm the seating layout before finalising drawer and door swings.
For a whole-room or whole-house package, coordinating these under one procurement is simpler than matching finishes between three suppliers. Our Wall Panel Systems and built-in joinery are produced to the same finish schedule, so veneers, lacquers and melamine doors can be carried through from the media wall into adjoining cabinetry.
Electrical and services: the most common cause of delay
The television, soundbar, console, router and any lighting all need routes and outlets that exist before the carcass closes. Two rules keep this from becoming a site problem:
- Put the back-box or outlet position on the joinery drawing, dimensioned from the TV centre line, not only on the electrical drawing. First fix follows whichever drawing the trades are working from.
- Leave a service cavity or chase behind the media zone with enough bend radius for HDMI and speaker cable, and keep every driver and connector behind an accessible opening.
If the screen will be on an articulating arm, say so at specification stage. A fixed panel and an arm have different backing requirements, and a full height wall designed for a fixed mount cannot simply take an arm later without opening up the panel.
Quantities that get missed on multi-unit projects
On apartment and serviced-apartment work the same media wall detail repeats across several units, and it is tempting to take one quantity and multiply it. Levels differ between floors and between handed layouts, so treat each unit type as its own take-off with a measured sample of two or three units per type.
| Item | Quantity basis |
|---|---|
| Media wall modules | Per unit type, from measured dimensions for that type |
| Filler and scribe panels | Per opening, plus a site-cut allowance per run |
| Fixings and wall battens | By wall construction type, confirmed per project |
| Lighting components and drivers | Per lit bay, with drivers kept outside sealed cavities |
| Spare doors, shelves and hardware | A small spares set per project for handover and future maintenance |
| Packaging and handling notes | Panel lengths checked against lift, stair and door widths at the delivery point |
That last line matters more than it looks. A full height panel is long and awkward, and a run that will not pass a lift or a stair landing has to be split into joined sections in production. Confirm access routes at the building before the panels are cut.
Before the purchase order: a short confirmation list
Confirm and record: measured site dimensions at three points per run; finished floor and ceiling levels; TV model and mounting type; equipment list for the cavity; module layout signed off against the drawing; finish code from the approved sample, not from a screen; lighting positions and driver access; adjacent product thicknesses and reveal details; delivery access route; and installation responsibility on site. SANTERSON's workflow runs from design and specification through production, logistics and door-to-door delivery to installation support, so these confirmations are made at quotation stage rather than after goods leave the factory.
If a finish is specified as a veneer or lacquer, request the physical sample for approval. Screen rendering of wood grain and sheen is unreliable, and an approved sample also becomes the reference for any later replacement panel.
Frequently asked questions
Can a full height media wall be supplied as one assembled unit?
Usually not. Long panels are difficult to freight and impossible in most lifts and stairwells, so the run is supplied as modules that assemble on site. Where access allows, larger pre-assembled sections can be arranged during specification.
What information do you need to price a media wall accurately?
Measured width and height of the run at three points, the module layout or a marked-up drawing, the finish selection, the TV size and mounting method, and whether lighting is included. With those items we can quote modules, hardware, lighting and packing in one package.
Can the media wall match our kitchen or wardrobe finishes?
Yes, when both are specified from the same finish schedule. Door styles and materials used across our built-in joinery — melamine, lacquer, acrylic and wood veneer — can be carried into the media wall so the whole room reads as one system.
Do you supply media walls for projects outside China?
Yes. We manufacture in China and ship internationally with freight forwarding, customs paperwork and door-to-door delivery, and we support installation and after-sales on project work. Import terms, duties and transit arrangements are confirmed per project.
Get a quantity take-off for your media wall
Send us your drawings or site measurements and we will break the run into modules, list what has to be coordinated alongside it, and return a quotation with packing and delivery options. As a China-based manufacturer of furniture and building materials, SANTERSON supplies full height media walls together with the joinery, panelling, flooring and lighting they sit against, so one package covers the whole wall.