An outdoor swim spa rarely arrives on site as a single line item. Around the shell sit pumps, filtration, water treatment, electrical supply, a structural base and a set of finishes that all have to land in the same week. This guide walks through how we quantity-take the WS-PC08U and what has to be coordinated with it on a villa or hospitality project.

WS-PC08U is one model within our configurable outdoor swim and hydrotherapy range, listed at 8000 × 3000 × 1500 mm. The same coordination logic applies whether you are specifying a single unit for a private residence or a small group of units across resort villas — only the volume changes.

What WS-PC08U Contains as Delivered

Before quantities make sense, it helps to see what the catalogue already assigns to this model. These are the figures shown on the product page for the standard configuration; options and add-ons sit on top of them.

Item listed for WS-PC08UCatalogue figureWhat it means for your schedule
Overall dimensions8000 × 3000 × 1500 mmSets the footprint of the base, the access route and the crane or forklift pick point.
Control system1 setOne control position per unit; locate it where maintenance staff can reach it without crossing the deck.
Water pump4 pcsJet circuits are driven by four pumps, so the power distribution and jet zoning need to match that split.
Filter pump1 pcSingle filtration circuit per unit — plan one plant-space position beside the shell.
Jet total33 pcsFixed by the shell moulding; jet layout is confirmed at drawing stage, not on site.
LED lights1Underwater lighting count per unit as catalogued; extra lighting is a configuration decision.
Total power11.85 kWThe number the electrical engineer designs against, before any heat pump is added.
Features shownWater jets, LED lighting, OzoneOzone treatment is included at this configuration level; UV sterilisation is a separate option.
A note on configuration: the catalogue does not list a swim training system for WS-PC08U. If your client wants counter-current swimming, that requirement should be raised at enquiry stage so we can confirm which model in the range carries that equipment, rather than assuming it can be added to this shell.

Step 1: Lock the Unit Count and the Shell Footprint First

Everything downstream keys off two numbers: how many units, and where each one sits.

  • Unit count. For a private villa this is usually one. For resort villas or wellness zones, take the count from the room-by-room programme, not from an average — an amenity deck that serves two villas may need a different arrangement than two standalone units.
  • Footprint plus working space. The shell occupies 8000 × 3000 mm at plan level. Add clearance for the filter pump position, for steps, and for anyone who has to reach the control system and plant later. A layout that only fits the shell will fail on maintenance day.
  • Depth and finished levels. At 1500 mm deep, the relationship between the spa water line, the surrounding deck finish and the ground slab needs a section drawing before any excavation is priced.
  • Access route. Confirm that the delivery path — gate width, turning radius, overhead clearance, slab loading on the route — can take a unit of this size. This is a site question, not a product question, and it is the one most often left too late.

Step 2: Build the Bill Around the Shell, Not Under It

Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option is confirmed against WS-PC08U specifically rather than taken from the range in general.

A practical way to quantity-take the package is in four layers:

Layer 1 — Water treatment and circulation

  • Filtration: the catalogued filter pump as standard; sand filtration as an option where the project wants that media instead.
  • Sanitisation: ozone is shown for this configuration; UV sterilisation is added only if specified.
  • Circulation and jet circuits: as delivered with the four water pumps — do not duplicate these in your bill.

Layer 2 — Thermal and envelope

  • Heat pump: sized against the unit volume and the local climate, and confirmed with us before it is added to the electrical load.
  • Insulation: relevant where the shell sits above ground or in a partly exposed structure; confirm the specification for the actual installation condition.
  • Covers and steps: access items that belong on the architectural schedule so their finishes match the surrounding deck.

Layer 3 — Electrical and controls

  • A dedicated supply sized against the catalogued total power for the confirmed configuration, with the heat pump load added on top if selected.
  • One control position per unit, positioned for operator access.
  • Provision for the underwater LED circuit and any deck lighting that visually ties into the spa.

Layer 4 — Structure and finishes

  • Base slab or plinth engineered to carry a filled shell of this size, with the load case stated as full.
  • Deck waterproofing and drainage falls around the perimeter.
  • Edge detail agreed between the spa rim and the paving, stone or timber finish — drawn once, repeated on site.
Do not treat any single figure above as final for procurement. Dimensions, power draw and included equipment are confirmed against the configuration you order. We issue that confirmation at quotation stage, before your bill of quantities is frozen.

Step 3: Coordinate the Swim Spa With the Rest of the Outdoor Package

A spa in isolation reads well on a drawing and disappoints in a photograph. The surrounding products decide whether the space works, and they share the same base, drainage and electrical planning as the shell.

  • Poolside seating and lounging. Aluminium frames, rope weave, wicker and teak-look tops all behave differently beside chlorinated water and in full sun. Choose one material family for the spa deck so maintenance is consistent — our aluminium sling sun lounger collection covers several frame designs with adjustable backrests, which suits high-use pool decks.
  • Shade and shelter. A motorised louvered aluminium pergola with LED strip and zip screens can sit over an adjacent terrace, but its footings and any overhead services have to be set out clear of the spa's access and lift zone.
  • Outdoor storage and plant screening. Cabinetry close to a pool deck should be specified for the wet environment — outdoor ready PVC cabinets are the type of product we use where towels, chemicals and equipment need a lockable home near the water.
  • Hard landscaping. Aluminium honeycomb panel cladding works well to screen plant rooms and to continue a facade language from the interior out to the spa pavilion.
  • Ambient lighting. Deck-level sconces and path lighting should be on circuits that stay independent of the spa's pumps, so maintenance on one does not darken the other.

Where a project needs a spa geometry outside the rectangular catalogue — an oval, round or curved basin set into a terrace edge — we also produce customizable shape outdoor spas with an acrylic shell and structural reinforcement. That is a different product decision from WS-PC08U, and it should be made before the base is drawn.

Step 4: Sequence Deliveries so Nothing Waits on Site

The shell, the heat pump, the cladding and the deck furniture arrive on different lead times. Left unmanaged, the spa sits on a slab waiting for an electrical rough-in, or the furniture lands before the waterproofing has cured.

  • Freeze the configuration first. Nothing else can be released until equipment and options are confirmed for WS-PC08U.
  • Set the interface dates. Base slab ready, electrical rough-in complete, then shell delivery. Working backwards from those three dates gives you the order dates.
  • Group what shares a trade. Cladding, screening and cabinetry that touch the spa pavilion should be on one delivery window so a single crew installs them.
  • Hold soft goods for last. Loungers, cushions and storage go in after wet works and finishing are done, so they are not damaged or stored in a plant room.

As a one-stop furniture and building materials supplier, we manufacture the swim spa alongside the outdoor furniture, cladding, lighting and fit-out products around it, which means one factory schedule and one shipping plan rather than six vendors reconciling their own. Our logistics and door-to-door delivery service handles freight, packaging and container loading through to the site address, and our installation and after-sales support covers on-site fitting, inspection and snags once the trades are ready.

A Pre-Order Checklist for WS-PC08U

  • ☐ Unit count confirmed against the room-by-room programme.
  • ☐ Shell footprint, clearance and maintenance access drawn on plan.
  • ☐ Section through the spa rim, water line, deck finish and slab agreed.
  • ☐ Included equipment versus options confirmed for this specific model.
  • ☐ Electrical load taken from the confirmed configuration, including any heat pump.
  • ☐ Base engineered for the filled weight, with the load case stated.
  • ☐ Delivery route checked for width, overhead clearance and lifting.
  • ☐ Adjacent furniture, shade, storage and cladding specified to the same deck schedule.
  • ☐ Interface dates set before any purchase order is released.

Send us the layout, the unit count and the equipment you expect, and we will return a confirmed configuration for WS-PC08U with the option list priced against it — before your quantities are frozen.

Request a Configuration and Quote Browse the Swim Spa Range

Frequently Asked Questions

How many WS-PC08U units can one project take?

There is no fixed ceiling. A private residence typically takes a single unit; resort and multi-villa projects order per amenity zone, and the coordination steps above scale with the count rather than changing in nature.

Is the catalogue specification final?

No. The dimensions, pump counts, jet total and power figure shown on the product page describe the catalogued configuration. Options such as a heat pump, sand filtration or UV sterilisation change what is delivered and what the electrical design has to carry, so we confirm the exact specification at quotation stage.

Can I add counter-current swimming to WS-PC08U?

The captured specification for this model does not list a swim training system. Raise the requirement at enquiry stage and we will confirm which configuration in the range meets it.

Can you supply the poolside furniture and screening as well?

Yes. Loungers, pergolas, outdoor storage, cladding, lighting and interior fit-out for the adjacent building all come from the same factory schedule, which is why coordinating them against one interface calendar is straightforward.