A wardrobe that arrives on site out of square, with the wrong grain or a door that will not close, costs far more than the panel itself. It delays the bedroom handover, triggers rework on adjacent joinery, and puts the whole fit-out behind schedule. Most of those problems are decided long before production starts — they are decided in the enquiry. If you can send a manufacturer enough information to price and build your Oak Solid Wood Wardrobes without guessing, you get a quotation you can actually compare against other tenders, and you protect the design intent your client signed off.
Start With What the Brief Already Gives You
You rarely begin from nothing. A design brief for a villa or apartment bedroom normally carries a room elevation, a finish schedule, and a mood reference. Pull those three items out first and read them as questions rather than answers. The elevation tells you where the wardrobe sits and how tall it can go. The finish schedule tells you whether oak is specified as a solid timber component or as a veneer on a board substrate — that distinction changes both price and lead time, so settle it before you ask anyone for a number. The mood reference tells you how the front of the unit should read: flat and handleless, or panelled with mouldings.
Where the brief is silent, decide deliberately instead of leaving the gap for the factory to fill. A manufacturer who receives an incomplete enquiry will either price the cheapest interpretation or come back with a list of questions that eats a week. Both outcomes weaken your position when you are comparing suppliers.
The Six Items Your Enquiry Must Contain
Write the enquiry as a short specification sheet. Six blocks of information, clearly labelled, are enough for an experienced built-in furniture team to return a workable quotation and a drawing for your review.
| Item | What to state | Why it matters |
|---|---|---|
| Opening dimensions | Width, height and depth of the recess, plus floor-to-ceiling height and where skirting, cornice or flooring will be laid. | Made-to-measure units are built to the opening. A missing floor build-up becomes a wardrobe that does not sit flush. |
| Door type and clearance | Hinged, sliding or open; the swing arc or the run needed for sliding tracks; nearby bed, door and light-switch positions. | A hinged door that fouls the bed frame is discovered on site unless the plan says otherwise. |
| Internal layout | Hanging zones (short and long), drawer bank heights, shelf spans, shoe or accessory storage, lighting inside the carcass. | Layout drives internal panel count and hardware, which is where quotation differences usually hide. |
| Material and finish | Solid timber components versus board substrate, oak grade and cut, stain or clear finish, sheen level, and the samples you want matched. | "Oak" covers a wide range of cost. Naming the finish and supplying reference samples keeps the offer honest. |
| Quantity and room list | How many bedrooms, how many identical units, which rooms differ. | Repeat units are where a project saves money; a per-room schedule lets the factory normalise the build. |
| Delivery and site conditions | Destination city, port or door address, access constraints, storage on site, target installation window. | Packaging, container loading and phasing are planned around this, not invented afterwards. |
Specify the Storage Logic, Not Just the Appearance
Clients judge a wardrobe by how it behaves on a weekday morning. Before you draw the elevation, list what actually lives in it: suits and shirts needing short hanging, dresses and coats needing long hanging, folded knitwear that creases on a wire shelf, linens stored twice a year, bags and cases that need floor space. That list converts straight into zones.
- Put long hanging where the client stands most often; short hanging can sit higher or in a second column.
- Keep drawers between knee and shoulder height — anything lower is used twice and then abandoned.
- Reserve the top zone for seasonal items and make it reachable, otherwise it becomes a dust trap.
- If the bedroom has no natural light on the wardrobe face, ask about integrated internal lighting at the enquiry stage; retro-fitting later means visible conduit.
If the design is closer to an open or minimalist look than a traditional closed unit, say so explicitly and ask to see how the same layout works in a custom minimalist bedroom wardrobe with flat panels and a handleless front. The carcass and internal fittings are largely shared between the two approaches, so switching door style at quotation stage is usually straightforward — discovering that early keeps your budget stable.
Ask for a Drawing Before You Ask for a Price
A number without a drawing is not comparable. Request a production-level elevation and plan showing the carcass divisions, door splits, handle or profile detail, and where the unit meets wall, ceiling and floor. Read it against your own brief line by line: does the door split fall where the designer wanted it, does the drawer bank sit at the specified height, is the plinth or shadow gap resolved?
Only once the drawing matches the intent should you take the quotation apart — materials, hardware brand and model, finish system, packaging, freight terms, and what is excluded. Two suppliers quoting the same drawing are negotiable; two suppliers quoting different assumptions are not.
Sample discipline saves rework
Ask for physical finish samples on oak — the actual stain, sheen and grain cut you specified — before production release. Photographs of a wardrobe in a showroom under warm lighting will not match your bedroom's daylight. Approve the sample in the room where the unit will be installed, sign it, date it, and keep one copy on site as the reference for handover.
Coordinate the Wardrobe With the Rest of the Fit-Out
A wardrobe rarely stands alone. It meets wall panelling, an interior door, a skirting line, sometimes a window reveal or an adjacent vanity in an ensuite. When several joinery items come from one turnkey interior project solution, the reveals, edging and finish are matched at factory stage instead of being approximated by three different trades on site. That is also where you should raise sequencing: which item installs first, what has to be plastered or floored before the joinery arrives, and who protects the finished doors while other work continues.
Send the same room schedule to every trade you engage. If the wardrobe supplier sees the door schedule and the flooring build-up, they can resolve a conflict on paper. If they see only a cropped image of one wall, the conflict arrives with the crate.
What a Serious Supplier Replies With
- A drawing or marked-up version of your elevation, with any dimension they could not confirm highlighted rather than silently adjusted.
- An itemised quotation separating carcass, doors, hardware, internal fittings, finish and packaging.
- Named hardware and finish systems, so substitutions have to be discussed instead of appearing on site.
- A stated production sequence for your room list, including which units ship together.
- Questions about the gaps in your brief — asked within days, not weeks.
Reply speed matters less than reply precision. A fast quote built on assumptions will be revised twice and still land wrong.
Before You Press Send
- Every opening dimension checked against the latest architectural drawing revision, not the layout you first received.
- Oak stated as solid timber or veneer, with the finish reference named.
- Door type confirmed against circulation clearances in the room plan.
- Internal zones traced back to the client's actual storage list.
- Quantities grouped by room, with identical units identified.
- Destination address, access notes and target installation window included.
Send that, and the enquiry stops being a request for a price. It becomes a specification the supplier builds to — which is exactly what protects the bedroom your client approved.