A matte lacquer wardrobe usually arrives at site months before the room is finished. Between the factory door and the bedroom, the panels pass through a container, a warehouse lift and a team of installers who are working to schedule. For a finish that shows every chip, dent and dull patch, packaging is not a minor logistics detail — it is part of the product specification. Before you place an order for matte lacquer wardrobes, confirm the packing method in writing, in the same way you confirm dimensions and finish.
Why the finish decides the packing spec
Lacquered door fronts and carcass panels are large, flat and finished on at least one face. Matte lacquer scatters light rather than reflecting it, which means a compression mark or a rub on the surface reads differently from the same mark on a high gloss panel — often less obvious in the warehouse, and very obvious once daylight falls across the installed unit. Panel size matters just as much: full-height wardrobe doors travel close to their finished length, so they cannot be re-oriented inside a carton to make a crate fit better.
Because these wardrobes are made to measure for each project, the packing plan is also project-specific. A villa job with a run of matching bedroom joinery packs differently from a single replacement unit, and a consolidated container that mixes wardrobes with matte lacquer panels, flooring or lighting needs its own loading sequence. Ask for the packing plan before production closes, not after.
What to confirm before production starts
- Panel protection. How each lacquered face is separated and cushioned in the carton, and whether edge protection is fitted to door fronts and mitred corners.
- Crate or carton type. Whether doors and carcass components ship in plywood crates, reinforced cartons or a combination, and how many units share one package.
- Orienting and restraint. How tall panels are stood or laid, and how they are blocked so they do not shift against each other during sea or road transit.
- Moisture control. Whether wrapping is sealed for the ocean leg, and what desiccant or vapour barrier is used for a long container voyage into a different climate.
- Hardware handling. Whether hinges, runners, handles and integrated lighting travel loose in labelled inner boxes, pre-fitted to panels, or in a separate package.
- Marking and sequence. Whether each package carries the room, unit reference and crate number that match your drawings, so installers know what opens first.
These points sound obvious. They are still the most common sources of dispute on a built-in furniture order, because "properly packed" means different things to two different buyers. Put the agreed method into the order confirmation and ask for photographs of the packed crates before the container is loaded.
Packing and the way packages arrive
Decide in advance who opens what, and where. A crate that is opened on an unprotected floor is a crate whose contents are exposed to grit, plaster dust and dropped tools. Where the site allows it, keep lacquered components in their protection until the room is painted, floored and cleaned, then stage the panels upright against a wall with padding behind them.
Write down what you expect on arrival so that a claim has something to measure against. Record the crate count against the packing list, photograph any damaged or re-taped packaging before opening it, and check door fronts for surface marks in good light while the protective film is still on. If a package shows impact damage, note the crate number — that reference ties the damage to a position in the container and to the loading record.
Consolidated shipments need extra coordination
Most villa and apartment projects order wardrobes alongside other fit-out items, and one consolidated container is cheaper than several small ones. The trade-off is that heavy or irregular goods can press against finished panels if the loading plan is careless. Confirm which packages are loaded last so the wardrobe crates come off first, and confirm that hardware and fragile items are not packed inside wardrobe cavities unless that was agreed.
SANTERSON handles furniture logistics and door-to-door delivery, including packaging and container loading, customs paperwork and shipment tracking, so the packing plan and the loading plan are set by the same team that arranges the freight. That is the practical advantage of a single supplier for a fit-out: one packing list, one crate numbering system, one point of contact when something does not match.
A short pre-order checklist
- Packing method stated in the order confirmation, not just discussed verbally.
- Photographs of packed crates and a crate-by-crate packing list before loading.
- Crate labels matched to room and unit references on your drawings.
- Loading sequence agreed when the container is consolidated with other materials.
- Inspection point at delivery defined: who checks, against what list, and within what window.
- Replacement route confirmed for a panel damaged in transit, including how the replacement is packed on the second trip.
The cheapest wardrobe quote and the well-packed one are rarely identical, and the difference only becomes visible at delivery. Specify the packaging with the same care you give the finish schedule, and ask your supplier to confirm it in writing before production begins. Send us your drawings and crate requirements, and we will confirm the packing plan for your wardrobe run together with the dimensions, layout and finish selection.