A round mirror cabinet rarely gets its own drawing sheet. It sits inside a bathroom elevation, shares a wall with the vanity and basin, and is usually specified late in a residential project. That is exactly why enquiries bounce: the brief says "round mirror cabinet", the supplier needs dimensions, a finish, a layout and a fixing method, and nobody has written them down yet. Below is the sequence we use to move a single bathroom item from a designer's sketch to a confirmed Santerson quotation.

Start with what the brief already answers

Before anything is sent, read your own pack and mark the questions it settles. For a Santerson Round Mirror Cabinet, the product page describes a configurable unit for residential bathroom projects: finish, layout and dimensions are specified per space, with made-to-measure sizing and material and finish options. So the brief does not need to invent a catalogue code — it needs to describe the room the unit is going into.

Three items settle most of the technical conversation before it starts:

  • The bathroom elevation with the mirror position dimensioned from finished floor level, and from the nearest wall or corner.
  • The vanity or countertop below it — basin type, overhang, and whether the cabinet is expected to sit proud of, flush with, or above that line.
  • The finish schedule entry for the bathroom joinery, including the door or panel style used elsewhere in the same room.

If your pack has those three, you are already past the most common cause of delay. If it does not, list them as open items rather than guessing values into an email.

Write the enquiry as a specification, not a question

A useful enquiry for a made-to-measure item reads like a short specification sheet. Structure it in five blocks so the reply comes back as a quotation instead of a list of questions.

BlockWhat to state
Project contextProperty type, number of bathrooms using this item, target programme date, destination city for delivery.
Item definitionRound mirror cabinet, overall diameter and depth, orientation of the door or opening, internal shelf layout.
Finish intentReference finish from your schedule, plus a named alternative if the first is unavailable. State gloss level and hardware preference.
InterfacesBasin and countertop dimensions, mirror height relative to tapware, any wall lighting that must not be obstructed.
Commercial frameQuantity across the project, delivery terms you expect, whether this is a one-off sample or a repeat item across units.

Quantities matter more than they look. A single round cabinet and the same unit repeated across four bathrooms are handled differently in production, so state the count even when it is one.

Attach the drawings that actually carry dimensions

Photographs of a mood board do not specify a cabinet. Attach the elevation, the plan showing the bathroom wall, and the finish schedule page. Where you have a joinery detail from another room in the same project, attach it too — matching an existing door profile to a new round cabinet is far easier when the profile is drawn rather than described.

One practical habit: dimension to finished surfaces, not structural ones, and say which you used. A diameter quoted against plasterboard and the same diameter quoted against the stud face are different cabinets once the wall build-up is added.

Ask for confirmation of the items that will be built differently

Made-to-measure work is where assumptions become costly. Before approving a production order, ask the supplier to restate in writing:

  • The overall diameter and depth as they will be manufactured, not as drawn.
  • The selected material and finish, with the sample reference you agreed on.
  • The fixing method for your wall build-up — stud, timber noggin, or a backing frame to be provided on site.
  • Whether mirror, shelving and hardware ship assembled or loose, and what that means for handling on site.

For any item where the surrounding fit-out is also being sourced from the same supplier, check the interfaces at the same time. A bathroom ordered as a group — vanity, mirror cabinet and stone or surface materials — is coordinated against one set of dimensions, which removes the mismatch you get when each item is quoted from a separate drawing revision.

Where a round cabinet usually goes wrong on site

Three issues account for most of the rework we hear about on residential bathrooms:

  • Wall build-up discovered late. Tiling thickness changes the projection of a round cabinet. Fix the tile schedule before confirming depth.
  • Lighting conflict. A sconce placed for a rectangular mirror can sit behind the curve of a round one. Check both on the same elevation.
  • No fixing substrate. A curved cabinet needs a solid fixing line. If the wall is stud and plasterboard, note it in the enquiry so the backing detail is agreed before delivery rather than during installation.
If your project needs more than one bathroom item coordinated — cabinetry, vanities, wall panels and finishes ordered against a single drawing set — that is handled through our project services rather than as separate product enquiries.

A short checklist before you press send

  • Diameter and depth, dimensioned to a stated surface.
  • Finish reference plus one named alternative.
  • Quantity across the project and destination city.
  • Elevation, plan and finish schedule attached.
  • Wall build-up and fixing substrate identified.
  • Adjacent items — basin, tapware, lighting — shown on the same drawing.

Send that and the first reply is normally a priced proposal with the open points marked, not another round of questions. If you are specifying several bathroom items for one project and want them coordinated against a single set of dimensions, start with the item page above and attach your drawings.