A quotation for Santerson Mixed Open & Closed Systems usually arrives as a single line item with a total. For a made-to-measure modular wall that combines open shelving with closed cabinets, that one number hides most of the decisions: which modules are open and which are closed, how far the run spans, what carcass and front materials were assumed, and whether lighting, hardware and fixing details were ever specified. Use the checklist below to read the quote line by line and turn it into a scope you can actually compare.

Why mixed open and closed runs are easy to misquote

This product sits in the Modular Living Systems collection, alongside Santerson Floating Modular Systems and Santerson Closed Modular Units. The product page describes a system that mixes open and closed elements, with finish, layout and dimensions specified for each space, and the configuration lists made-to-measure sizing together with material and finish options. Nothing in that description fixes a standard module width or a fixed price per metre.

Two buyers asking for "a living room wall unit, about 3.6 metres wide" can therefore receive quotes that look identical on the surface and differ substantially in what is being built. A quote priced on a closed-cabinet assumption reads cheaper than one priced with open bays, thicker shelves and integrated lighting, even when both are described as mixed open and closed systems. Before comparing prices between suppliers, confirm that both quotations describe the same composition.

Check 1: dimensions and the module map

Ask for a dimensioned elevation of the exact run, not just an overall width and height. The drawing should show each open bay and each closed cabinet with its width and depth, shelf positions, and where the unit starts and ends relative to doors, skirting and services.

  • Overall width, height and depth for the full run, plus the size of every individual module.
  • Clear internal depths for open display areas and closed cabinets - these are not the same figure, and internal depth drives what the shelves will actually hold.
  • Whether the unit is floor-standing, wall-hung or floating, and how the wall construction it will be fixed to has been described.
  • How the run handles corners, niches and out-of-plumb walls on site, since made-to-measure sizing should reflect the survey, not a nominal room size.

If your quotation states only overall dimensions, request the module-by-module layout in writing before you treat the price as firm.

Check 2: materials and finishes stated by name

The product page lists material and finish options, so a quote that says simply "as discussed" or shows a colour name without a reference is incomplete. Ask for the carcass material, the front material, the edge treatment and the finish reference to be written out.

  • Carcass and shelf substrate, with panel thickness for open shelves that will carry books or display pieces.
  • Front finish type and the supplier's own reference code, plus a physical sample if the finish is a wood-look or textured surface.
  • Edge banding or solid-edge detail on visible open shelves, which is often where a lower-cost build differs from the quoted intent.
  • Interior finish of closed cabinets - painted or laminated interiors change both cost and appearance when doors open.

Material and finish choices are part of the custom and OEM scope this supplier offers, so changes at this stage are normal - what matters is that each change is re-quoted against the same module map rather than absorbed silently into a revised total.

Check 3: hardware, doors and opening mechanism

Closed modules are where cost differences concentrate. Confirm what the quoted price includes for doors and drawers, and what it leaves to site.

  • Door type per module - hinged, sliding or lift-up - and the number of doors actually priced.
  • Hinge and runner specification, including whether soft closing is included or listed as an option.
  • Handle detail: handleless profile, integrated pull, or selected knobs and pulls priced separately.
  • Glass or display fronts for open-to-closed transition areas, if the design calls for them.

Where a comparable open and closed arrangement is required around the television rather than across a full wall, Santerson Open & Closed Combo Units is the closer reference point - ask the supplier to state which collection a priced item belongs to, because collections are configured differently.

Check 4: lighting and electrical scope

Integrated lighting turns a furniture quote into an electrical one, so it should never be left as an implied inclusion. If the design shows lit open bays or backlit niches, ask for the fitting type, driver location, switching or dimming control, and cable routes to be itemised.

Where the requirement sits in a bathroom instead of a living room, Santerson Integrated Cabinet Lighting is the listed option and its page states that electrical specifications and compatibility must be confirmed for each cabinet design. Apply the same rule to any living-room lighting: state who supplies the fitting, who provides the driver and transformer, who runs the supply to the unit, and who signs off the connection on site.

Check 5: what the price does and does not cover

For a made-to-measure item, the line total is only meaningful once the boundaries are written down. For each quotation, ask for these items to be shown separately or explicitly marked as excluded:

  • Survey, drawings and prototype or sample approval, and how many revision rounds are included.
  • Packing, freight mode and the delivery point - door, kerb or room of use.
  • Import documentation, duties and clearance responsibility for cross-border shipments.
  • On-site installation, making good, and who carries out wall fixing and electrical connection.
  • Spare parts, warranty terms and the process for reporting a defect after handover.

This supplier's service pages describe design consultation and space planning, material selection and product specification, manufacturing and quality control, project management and site coordination, and final installation and handover, with freight forwarding, customs paperwork and door-to-door delivery handled as part of the process. Ask which of those stages your quote actually prices, because a low line total often means one or two of them sit outside it.

Check 6: lead time, packaging and site access

Ask for the production sequence in writing: sample or finish approval, then manufacture, then packing and shipment, then delivery and installation. Confirm the trigger date for that sequence - usually signed drawings and approved samples - so you can see how a late finish decision moves the whole programme. Also confirm the pack list and module weights, since modular runs frequently arrive as several sections that must pass through lifts, stairwells and doorways. If your site has restricted access, say so in the enquiry; it affects packing method and installation time, and both belong in the quote.

Check 7: how the specification was confirmed

The product page notes that dimensions, storage, finish and electrical specifications need confirming for the final configuration. Treat that as a checklist of open items rather than a formality. Before you accept a quotation, ask which of these are still assumed and which are confirmed:

  • Final dimensions from a survey, with tolerances for site variation.
  • Storage configuration - shelf counts, adjustable versus fixed shelves, drawer internals.
  • Finish references with approved samples on file.
  • Electrical and lighting specification, including control and driver location.

Related items to price in the same enquiry

Mixed open and closed walls rarely stand alone. If your project also needs a full-height storage wall or a display-led combination, include the related lines in one enquiry so finishes and materials match across rooms:

Pricing these together avoids the common problem of matching finishes being quoted twice, in different materials, by two different line items.

A quick pre-award checklist

Before signing off a quotation for Santerson Mixed Open & Closed Systems, confirm you hold: a dimensioned elevation with every module sized; material and finish references with approved samples; the door, hinge, runner and handle schedule; an itemised lighting and electrical scope with responsibility assigned; the exclusions list for freight, duties, installation and making good; the trigger date that starts production; and the pack list against your site access. A quote that answers all seven checks can be compared honestly with a competitor's. One that does not is still a rough estimate, whatever the total suggests.

Send your drawings and room dimensions through the contact page if you want a quotation reviewed against these checks before award. Where a project needs several rooms specified together, furniture and building materials project procurement sets out how specification, production and delivery are coordinated in one programme.