A made-to-measure glass folding door is one of the awkward items in a furniture and building materials shipment: heavy, panelised, glazed and dimensionally unforgiving. It arrives months after the order was placed, and if the panels arrive chipped or mixed up between openings, the site programme slips no matter how well the doors were made. Before you place an order for Santerson Glass Folding Doors, packaging is worth as much attention in your purchase specification as size and finish are.

These doors are made to order. Each set is built around the dimensions, layout and finish you confirm for that specific opening, so a damaged panel cannot simply be swapped out from stock — it has to be remade to the same specification. That is exactly why the packing method, the marking system and the loading plan should be agreed in writing before production starts, not discovered at delivery.

What the product page does and does not tell you

The glass folding door listing states what can be specified: made-to-measure sizing, material and finish options, and a layout tailored to the project. It also carries the standing instruction on our configurable listings — confirm dimensions and selected specifications for each project. Packaging is not part of that public specification, because it changes with panel height, panel count, the finish you choose and the container the order ships into.

The same applies across the rest of the Folding Doors collection: a folding door travels differently from a cabinet or a lounger, and every made-to-measure item in the order carries the same risk if it is mis-packed. Treat packaging as a project-specific line on your purchase order and ask us to confirm it against your actual opening schedule.

Six points to confirm before production begins

  1. Packing unit and orientation. Ask how the leaves, frames and hardware are separated, and what stands between each panel and the next. Tall glazed leaves need rigid support and edge protection; panels packed loose against one another take the pressure of everything loaded around them.
  2. Edge and corner protection on the vertical members. Folding door leaves show damage at the corners and hinge edges first. Confirm that protectors cover both ends of every leaf, not just the outer faces of the pack.
  3. Surface protection matched to the finish. Glazed leaves need interleaving and corner guards; a wood veneer folding door needs face protection that will not mark the surface or hold moisture against it. Different finishes in one order can need different packing.
  4. Marking against your opening schedule. Every pack should carry the room or unit reference from your door schedule, plus the pack number and total pack count for that opening. Site teams who receive unmarked packs sort by eye, and that is where panels end up in the wrong apartment.
  5. Hardware and tracks packed separately. Hinges, handles, tracks and fixings should be boxed per opening with a contents list, not loose-filled into the door crates. Small parts are the items most often missing at handover.
  6. Loading plan inside the container. Confirm how the door packs will be positioned and secured, and whether they share a container with cabinetry or outdoor furniture. Our logistics and door-to-door delivery service covers packaging and container loading as part of the shipment, so the loading arrangement can be agreed with your coordinator before the container is packed.

What to put in writing on the order

A short paragraph in your purchase order removes most disputes later. It should state: the packing method you have agreed; that each pack is marked with the opening reference and pack count; that hardware travels in labelled boxes per opening; and how damaged or missing items are to be reported, with photographs taken at unloading rather than after installation. Add your inspection point — goods checked on arrival at site or at the port — so both sides know where responsibility for transit damage is assessed.

For multi-unit projects, also agree the delivery sequence. Folding doors for show apartments and for later phases should be packed and labelled so they can be released in that order, without re-handling every crate on site.

Checking the goods when they arrive

Unloading checks are quickest when the packing list has been agreed before shipment, so the site team knows how many packs to expect for each opening. Work through that list on arrival, photograph any damaged or wet packaging before you open it, then inspect each leaf for chips at the corners, marks on the face and squareness along the hanging edge. Check the hardware boxes against their contents lists. Report exceptions the same day with the pack number and photographs — a claim raised after installation is far harder to settle.

If a panel is damaged, give us the opening reference and the confirmed dimensions from your schedule. Because these doors are made to measure, any replacement follows the original specification, and an accurate record of what was ordered is what makes that replacement correct the first time.

Where packaging fits in the wider order

Doors rarely travel alone on a villa or apartment project. When SANTERSON furniture and building materials for several rooms move in one shipment, the packing plan should be read as one document: which packs hold glazed items, which hold cabinetry panels, and which container each group sits in. That single step is what lets a site team unload in the right sequence instead of breaking down every crate to find one set of leaves.

Send us your opening schedule, quantities and destination port, and we will confirm the packing method, marking system and container arrangement for your glass folding doors before production begins — so what arrives on site matches what you specified.