A classic sideboard rarely fails because of its style. It fails when the room was never measured properly, when the doors clash with the traffic flow, or when the interior layout was left to the factory to guess. Because our classic sideboards are made to measure for each project, the quality of your enquiry decides how well the finished piece works. The following project details are the ones we need settled before production starts.

1. Wall length, ceiling height and what sits beside the unit

Send the full wall dimension rather than the size of sideboard you have in mind. A made-to-measure carcass can fill a niche floor to ceiling or stop short at a dado line, but only if we know where the constraints are. Note the position of doors, light switches, sockets and radiators, plus any skirting or architrave that has to be scribed around. For an alcove, give the width at three heights — top, middle and bottom — because old walls are seldom square.

Then describe what sits beside the unit: a dining table, a radiator, a staircase, a hallway run. That information decides whether the doors should swing or slide, and how much clearance the piece needs to be usable rather than merely fitted.

2. How the room is used, and what goes inside

Tell us the job the piece has to do. A sideboard used for daily family meals needs deep drawers for table linen and cutlery trays. One used in a guest dining room may need more open shelving for display pieces and less closed storage. A unit that also serves as a drinks station needs space for bottles, glassware and small appliances on the worktop, with sockets planned behind it.

Interior layout is not an afterthought. Drawer stacks, adjustable shelves, wine racks, concealed compartments and cable cut-outs are all decided from your list of contents, so send that list — crockery counts, bottle capacity, appliance dimensions, artwork heights. Where a single piece has to carry table service on one side and display on the other, our decorative dining cabinets line gives you that split as a starting point.

3. Wall-mounted or freestanding, and what the floor can take

A floating unit keeps the floor clear and reads well in smaller dining rooms, but it needs a wall that can carry the load and an internal batten or fixing plan agreed before the plaster goes up. Our wall mounted sideboards are configured the same way — dimensions, finish and layout fixed to the site. A freestanding piece avoids that structural question but brings its own: floor level, rug thickness, and whether the plinth should meet a tiled or timber floor.

4. Finish, veneer and hardware against the rest of the room

Send the finishes already fixed in the space: floor, doors, kitchen fronts, ironmongery, stone worktop. Classic panelling looks correct when its moulding profile is matched to the architraves and cornices already in the room, and when the wood tone is sampled against the flooring rather than a catalogue swatch. We work from your material schedule and can match veneer, paint colour and hardware to it, or supply the ironmongery you have specified.

Lighting belongs in this decision as well. Recessed strips inside glazed bays and under open shelves need a driver position, a switch location and a cable route agreed at drawing stage — not drilled into a finished carcass on site.

5. Quantities, phasing and the drawings we work from

One sideboard in one villa and twelve units across a residential development are different procurement problems. For multiple units, confirm whether every room is identical or whether widths change floor by floor, and send the room-by-room schedule. Phased delivery is worth planning at the outset so that early rooms can be produced and released while later ones are still being measured.

Where drawings exist, send elevations and plans; where they do not, a set of site measurements with photographs is enough for us to prepare shop drawings for your approval. Nothing enters production until those drawings are signed off.

6. Delivery route, packaging and installation

The destination changes the build. A unit travelling by sea needs carcass construction, panel thickness and packaging specified so it arrives true, and flat-packed sections need a fixing sequence on site. Tell us whether the goods go to a private address, a builder's compound or a central store, and who receives them. As part of SANTERSON furniture and building materials supply, we handle production, packing and door-to-door delivery for villa and hospitality projects, with installation and snagging arranged around the site programme.

What to send with your enquiry

  • Wall and alcove dimensions at three heights, plus ceiling height and floor finish
  • Positions of doors, switches, sockets and any services behind the wall
  • A list of what the unit must store, including appliance sizes
  • The finishes already fixed in the room, with samples or a material schedule
  • Quantities, room schedule and any phasing requirements
  • Destination, receiving arrangements and preferred installation sequence

Send those details and we can price the piece accurately rather than by estimate. If you are furnishing a whole house or development, the same information supports a full joinery package — sideboards, tall cabinets and buffet cabinets built to one drawing set, in one shipment.