Noise is one of the first complaints in an open-plan villa, a hotel suite that opens onto a lounge, or an office where two meetings share one floor. Wall linings are usually specified for looks and almost never questioned for sound. If you are comparing Santerson Acoustic Panels for a project, the useful shortlist is not a price sheet — it is the set of details that decide whether the wall works after installation. Here is what procurement teams should put side by side before issuing a purchase order.
1. Fixed panel or sliding panel: choose the function first
The catalogue carries two related but different products, and mixing them up is the most common sourcing error. Santerson Acoustic Panels sit in the Paneling Systems collection — a wall lining specified to size for each space. Santerson Acoustic Sliding Panels sit in the Sliding Panel Systems collection, where the panel also moves: it closes off an area, then retracts. A fixed lining solves a reverberation or privacy problem on one surface. A sliding system solves a space-planning problem — a meeting nook inside a residence floor, a treatment room, a suite that becomes two rooms.
Ask which collection your drawing actually needs before asking for a quotation. Fixed panels and sliding panels are built, tracked and handed over differently, and the wrong choice cannot be corrected cheaply once openings are framed.
2. Made-to-measure dimensions, taken from site — not from the brochure
Both listings are configurable: sizing is made to measure, and layout is tailored to the project. That is an advantage only if your measurements are. For a comparison that means three numbers per wall — finished floor level to finished ceiling level, the clear run length, and the position of every obstruction (sockets, switches, skirting returns, door reveals, service risers). Sliding systems add more: opening width, panel stack space when open, track position, and the structural support above the opening.
A practical test for any supplier: send one elevation with dimensions and ask them to return a panel layout drawing. A manufacturer working from your drawings will show joint positions, reveal details and cut-outs. Someone reselling stock panels will not.
3. Material and finish options, matched to the room
Finish and material are selectable per project on both products, and that selection should follow the traffic the wall sees. A corridor or a function-room wall wants a surface that can be wiped and that hides edge wear. A bedroom or lounge lets you choose a softer texture. Where panels sit next to other joinery — wardrobes, media walls, concealed doors — request the finish sample alongside the cabinetry sample so the two are compared under the same light, not from separate brochures.
Order physical samples early and keep them on site until handover. Colour and texture that read well in a showroom lamp can look wrong against the actual floor and lighting package.
4. Acoustic performance: what is stated, and for which build-up
This is the item buyers most often skip. The catalogue pages describe configurable acoustic wall panels and acoustic sliding panels with material and finish options, and they direct you to confirm project requirements and acoustic performance for the selected configuration — the listing itself does not publish a single fixed performance figure. So do not compare the products on marketing wording.
Put these questions in writing to every bidder:
- Which core and facing make up the panel you are quoting, and what is the total build thickness?
- For a fixed lining: what is installed behind it — direct fix, battens, cavity, infill — and how does that change the wall assembly?
- For a sliding system: how are the top track, jambs and panel edges sealed when closed, since gaps decide real-world performance?
- Which test or rating applies to the exact configuration quoted, not to a similar panel in the range?
If a supplier cannot answer the third and fourth questions, they are quoting a decorative lining. That may still be the right product — but price and specify it as one.
5. Hardware, track and opening details for sliding systems
Sliding acoustic panels live or die on hardware. Confirm the track type and whether it is surface-mounted or recessed, the load rating for the panel height you have specified, hanging points per panel, the handle and lock specification where privacy matters, and the finish of visible ironmongery. Also confirm how many panels per opening and which direction they stack — a stack that blocks a doorway when open is a design failure nobody notices until the room is in use.
SANTERSON's partition sliding systems page sits in the same collection and makes the same point: track, hardware and opening dimensions are things to confirm per project. Treat that list as your checklist when comparing bids.
6. What sits next to the panel on the same wall
An acoustic lining is rarely the only surface in the room. Media walls, concealed doors and shelving often run into it, and each junction is where sound leaks and finishes clash. Check whether the supplier can coordinate those adjacent elements — sliding panel TV systems and decorative concealed doors appear in the same catalogue — and settle who owns each junction before order.
Ask each bidder how they handle a snag that crosses two trades. Fewer interfaces usually means fewer gaps, both literal and contractual.
7. Documentation and handover
Before ordering, confirm what arrives with the goods: dimensioned shop drawings for approval, a finish schedule keyed to each room, installation sequence for sliding tracks, spare-panel terms for future maintenance, and packing marks that match your room schedule rather than a carton number. Projects with several identical rooms fail on this point more often than on product quality.
A comparison sheet you can send today
| Item to compare | Ask every supplier for |
|---|---|
| Product family | Fixed acoustic panel lining or sliding acoustic panel system, matched to the drawing |
| Dimensions | Shop drawings from site-measured levels, lengths and obstructions |
| Build-up | Core, facing, total thickness, fixing method, cavity detail |
| Acoustic basis | Rating or test for the exact quoted configuration; edge and gap sealing for sliding panels |
| Finish | Physical sample, matched to cabinetry and lighting package |
| Hardware | Track type, load rating, panel count and stack direction, handles and locks |
| Package scope | Whether linings, joinery, doors and lighting come from one supplier |
| Logistics and handover | Packing marks by room, installation sequence, spares for maintenance |
The short version
Compare Santerson Acoustic Panels and their sliding counterparts on four things: the function you actually need, dimensions taken from site, a stated acoustic basis for the exact configuration, and hardware plus handover detail. Everything else — price per square metre, colour names, brochure photography — is secondary to those four.
Send your elevations, room schedule and target performance with the enquiry, and ask for a layout drawing back. Suppliers who can return one are quoting your wall; suppliers who cannot are quoting a panel.