A double basin countertop looks simple on a drawing: one slab, two bowls, two sets of taps. In practice it is where three separate trades meet — the stone or panel fabricator, the ceramic supplier and the cabinet maker — which is exactly why it fails most often in imported bathroom packages. If you are buying for a villa or apartment project and considering an overseas manufacturer, this guide walks through how the Santerson Double Basin Countertop is specified and produced, what you need to send before a quotation means anything, and how to check the delivery before your installer arrives on site.
Why the double basin top is the hardest item in the bathroom package
With a single sink, an error can usually be hidden by moving the tap hole or accepting a slightly off-centre bowl. With two basins you have two cut-outs to position, two waste and trap runs to keep clear of each other, and a mirror or cabinet line that has to read symmetrically from the doorway. The distance between the two basin centres is set once and cannot be adjusted later on site without re-cutting the top.
That is the core argument for buying the top, basins and vanity as one package from a single manufacturer rather than sourcing three items from three suppliers. When one party owns the drawing, the cut-out positions, the drawer fronts below and the tap-hole layout all come off the same set of dimensions. When you assemble them separately, the joiner's cabinet, the stone merchant's slab and the ceramics supplier's basins each arrive with their own tolerances — and someone has to absorb the difference on site.
What SANTERSON actually makes for this category
SANTERSON is a China-based furniture and building materials manufacturer that supplies project customers in hospitality, villas and offices on a turnkey basis — design and specification through production, door-to-door delivery, installation support and after-sales. The bathroom range sits under its Sanitary Fixtures category, and the Countertops & Basins line covers the double basin countertop alongside related configurations you will be quoted against:
- Santerson Undermount Basin — bowl fixed beneath the underside of the top, so the counter surface sweeps into the basin and can be wiped straight into it.
- Santerson Vessel Basin (Above Counter) — bowl sits on top of the counter; a decorative choice that also raises your finished wash height.
- Integrated Basin — basin and top formed as one piece, which removes the joint that collects limescale in hard-water areas.
- Santerson Stone & Marble Surfaces — for projects where the counter, wall cladding and other wet-area surfaces need to come off the same batch of stone.
On the cabinet side, the matching options are the Santerson Double Vanity, the wall-hung Santerson Floating Vanity and the Santerson Integrated Countertop Vanity, where top and basin are specified as a single unit. Specifying the top and the vanity together is what lets drawer fronts, plinth lines and cut-outs be coordinated instead of reconciled on site.
Every item in this range is made to order. Dimensions, material and finish are set per project, so the catalogue page shows the configuration rather than a fixed specification sheet. Confirm dimensions, countertop fit, materials and installation requirements for the exact configuration you order — not for the one shown on the page.
The information to send before you ask for a price
Overseas quotations go wrong when the buyer sends a picture of a bathroom and asks for "a 1500 mm double vanity". Send these six items and the drawing that comes back will be close to final:
- Finished wash height. Counter top surface to floor, in millimetres. Vessel basins add the bowl height on top of the slab, so state whether your figure includes the basin.
- Basin centres and set-back. Distance from each finished wall to the centre of each basin, plus the distance from the finished wall to the centre of the tap hole. These two numbers decide everything downstream.
- Tapware you intend to buy. Model photos and spout reach if possible. Tall vessel mixers need a different deck depth from concealed in-wall mixers, and the wall finish build-up changes the valve position.
- Waste and trap route. Where the wastes fall, whether traps are in the wall or under the counter, and whether floor level allows the falls. Two traps side by side is where many double tops get rejected on site.
- Substrate and mounting method. Solid timber, plywood carcass, steel frame or masonry — and whether the unit is floor-standing or wall-hung. Wall-hung needs the framing set out before the wall is closed up.
- Finish sample reference. Send the actual sample or a batch number for stone and veneer, not a colour name. Names do not travel between factories.
SANTERSON's custom and OEM service covers bespoke material, finish and texture choices with flexible minimum order quantities, so a project can specify one bathroom or a repeated layout across several units on the same drawing. The practical benefit is not the discount on volume — it is that every unit in the building shares one set of dimensions.
How the production sequence protects the cut-outs
Once your dimensions are confirmed, the order should come back as a shop drawing rather than an invoice. Read it carefully; this is the only document you will be able to correct at no cost. Check four things on it: basin centres, tap-hole positions, the notch for any skirting or rebate in the wall, and where the cut-out sits relative to drawers and doors below — a drawer that cannot open because its runner passes through the waste is a common and entirely avoidable failure.
Then ask for two confirmations before production starts:
- A material and finish sample posted to you, matched to the batch that will be used. Photographs of stone are not a substitute for holding it under your own bathroom lighting.
- Written confirmation that the vanity carcass, top and basins are being produced against the same approved drawing, with one revision number on all three packing lists.
For a project with multiple bathrooms, request that the first unit ships ahead of the rest as a production sample. Install it fully — connect the wastes, check the falls, live with it for a week — before releasing the balance. It costs you one container split and saves re-making every unit.
Freight, packing and receiving
SANTERSON arranges freight forwarding by sea, air and rail with customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. For a heavy item like a stone top you should still decide the incoterm before the price is agreed, because "delivered" that stops at the wharf leaves you with the inland leg, the dock charges and the last-mile handling on a fragile crate.
Specify the packing in writing: solid timber crate rather than cardboard, foam-faced edges, tops stored on edge rather than flat, basins packed separately with their own cushioning, and corner protection on mitred edges. Ask for a photograph of the loaded crate before the container is sealed — it takes minutes at the factory and gives you something to point at if a slab arrives cracked.
On arrival, check the goods against the packing list before signing anything, and open every crate on site while the delivery is still there. Look for hairline cracks along the cut-out edges and chip-outs on the underside of the front edge, where they will be visible against the wall once installed. Note any damage on the delivery paperwork with the crate number, photograph it in context, and send it the same day.
The site checklist your installer should work from
- Confirm finished floor level before the carcass is fixed — a top ordered to a 860 mm wash height cannot absorb a 25 mm screed that was not in the drawing.
- Dry-fit the top with no adhesive, set both basins in place, and check the mirror line before committing.
- Run both wastes together and time the drain. Two basins sharing one fall can back up at the tee even when each works alone.
- Seal the cut-out rim and the wall junction with a flexible sealant matched to the top colour; hard grout at that junction will crack with movement.
- Check drawer and door operation under the counter after the traps are connected, not before.
SANTERSON lists on-site installation, inspection and snagging, warranty coverage and spare parts support as part of its service scope. Response times, warranty terms and installer availability vary by market — confirm what applies in your country for your project before you rely on it.
A short buying summary
Order the top, basins and vanity from one manufacturer against one drawing. Send wash height, basin centres, set-back, tapware details and waste routes before asking for a price. Approve a shop drawing, not an invoice. Get a finish sample in your own light. Ship one unit first and install it properly. Specify the crate. Inspect on delivery. Those six steps are what separate a double basin countertop that lands flush and symmetrical from one that ends up re-cut by your installer at 4pm on a Friday.
To price a Santerson Double Basin Countertop for your project, send the dimensions listed above to SANTERSON's project team through the contact page, together with your finish references and target delivery location.