A swim spa on a hotel terrace or podium deck is one of the few amenities guests photograph, talk about and book around. It is also one of the easiest line items to get wrong, because the model you specify has to satisfy three different parties at once: the designer who wants the composition, the engineer who has to run power and structure to it, and the operations team that will clean and service it every week. This guide walks through how a procurement team should evaluate Outdoor Swim Spa WS-115Aⅴ during a hotel fit-out, using the published catalogue data rather than brochure language.
Start with the footprint, not the finish
The catalogued dimensions for this model are 3880 × 2200 × 1250 mm. Read those as an envelope, not a hole in your deck. In a fit-out programme you need to price and plan four clearances around that envelope before anyone talks about tile or glass:
- Access route. The shell has to travel from the delivery vehicle to its final position. On upper levels this usually means a crane pick, a tower hoist, or a route that stays clear until the unit lands. Confirm the route on the same drawing set you use for structural openings.
- Plant and service zone. Pumps, filtration and controls need a reachable position. A spa that can only be serviced by draining the pool and removing cladding will cost the operator every year it is in service.
- Edge treatment. Whether the unit is recessed, raised on a plinth, or sits on a finished slab changes the waterproofing detail, the step height, and how the surrounding paving resolves to the rim.
- Guest circulation. Robbing space, towel storage, drainage for wet feet, and sightlines from guest rooms or the restaurant all sit in the same decision as the spa position.
A practical rule for a fit-out: do not release the spa line item to tender until the access route and the plant location are drawn. Those two items drive structural work, electrical containment, and the waterproofing detail, and they are expensive to change after the slab is poured.
How to select the right configuration for how the amenity will be used
The published specification for WS-115Aⅴ lists one control system, one swim training system, one water pump, one filter pump, 24 jets in total, four LED lights, and a total power figure of 8.05 kW. The features shown on the page are water jets, LED lighting, ozone and a swim training system.
| Model | WS-115Aⅴ |
| Catalog dimensions | 3880 × 2200 × 1250 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Water pump / filter pump | 1 pc / 1 pc |
| Jet total | 24 pcs |
| LED lights | 4 pcs |
| Total power | 8.05 kW |
Two things in that list should change the way you brief the design team. First, the swim training system is a defined item on this configuration, which means the unit is positioned as lap swimming plus hydrotherapy rather than a spa pool alone. If your hotel is selling early-morning exercise and recovery as part of the wellness offer, that is the feature to write into the room category description and the spa menu. If your property only needs a small relaxation pool for two or three guests, you are paying for equipment you will not merchandise.
Second, the 8.05 kW figure is the catalogued total power for that configuration, not an installed load. Electrical design has to account for the supply available at the position, the local distribution arrangement, and any heating or heat pump option added later. Where a project needs a different pump arrangement, output or feature set, SANTERSON also publishes related configurations in the same swim and hydrotherapy range — for example Outdoor Swim Spa WS-115Aⅴ-U at the same 3880 × 2200 × 1250 mm envelope, with a different pump count, jet count, lighting count and total power figure. Same footprint, different services: that is usually the moment an engineer asks you to confirm which variant is on the drawing.
Confirm before you order: included equipment, optional accessories and electrical requirements are configuration-dependent for this range. Catalogue-listed options include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps, and availability varies by model. Get the selected configuration in writing on the quotation, and have your MEP consultant sign off the same document.
Treat the spa as part of the outdoor package, not a separate purchase
In most hotel fit-outs the swim spa lands in the same zone as loungers, shade structures and hard landscaping, and those items are usually bought from different suppliers with different lead times. The result is a finished deck with the spa installed and the furniture still in production.
SANTERSON works as a one-stop furniture and building materials supplier, covering outdoor furniture, bathroom ceramics and showers, lighting, cabinetry, wall panelling, ceilings, flooring and interior fixtures alongside the swim spa range. For an outdoor wellness zone that means the loungers, the shade structure, the poolside paving interface and the changing-room fit-out can be specified, produced and shipped on one coordination schedule rather than four. The published service scope runs from design consultation and space planning through material selection, production and quality control, project management and site coordination, to installation and handover.
For procurement that has a direct effect on your programme: one supplier means one set of shop drawings to review, one packing and container-loading plan, and one point of contact for snags. It also means the material palette around the spa — decking, wall finishes, screens, lighting — can be matched to the same project specification instead of approximated later from a sample board.
A short procurement checklist
- Confirm the exact model variant on the drawing matches the quotation, including which options are included and which are excluded.
- Have the structural engineer review the loaded weight and the support detail for the chosen position — recessed, plinth-mounted or surface-set.
- Have the electrical designer confirm supply, protection and routing against the catalogued power figure for that variant, plus any heating option.
- Agree the access and installation method before the deck is closed up, and record it in the method statement.
- Set the commissioning and handover items with the operations team: water chemistry, filter schedule, control access, and what happens when a component needs replacing.
- Order poolside furniture, shade and lighting against the same delivery window as the spa.
Specify it once, correctly
Send us the location plan, the intended use of the amenity and your target handover date, and we will confirm the configuration — included equipment, options and electrical requirements — for your project before you tender the package. Enquiries about the full product range and turnkey project service can be made through our contact page.