A sliding door that arrives with only a drawing dimension is the fastest route to a site problem. Timber movement, floor levels and track clearances all interact, and the gaps in a thin enquiry are usually discovered by the installer rather than the buyer. This guide walks through the fields we need on a Santerson wooden sliding door specification so that one confirmation round is enough, and so the doors you receive match the opening you have.
Santerson Wooden Sliding Doors — made-to-measure, with finish, layout and dimensions specified per project.
Why the specification matters more than the product name
Our sliding doors are made to measure rather than stocked in fixed sizes. That gives freedom on width, height and layout, but it also means the drawing you send becomes the door we build. When a specification is thin, two things tend to happen: substitutions get made on our side to keep production moving, and they may not match what the designer intended; or the order pauses while we ask for the missing detail, which costs days nobody planned for.
A complete specification removes both. It also makes pricing comparable across suppliers, because you are quoting the same construction, the same hardware duty rating and the same finish build-up instead of comparing three different interpretations of "wood sliding door, 1800 mm".
Field by field: what a complete specification contains
Work through the eight blocks below in order. Each one answers a question that would otherwise come back to you mid-production.
1. Opening and clearances, not just the door size
- Structural opening width and height, plus the finished floor level relative to the threshold.
- Whether the dimensions are rough opening or finished opening, and who is responsible for making good around the frame.
- Headroom above the opening for an exposed track, and whether a pocket wall, surface-mounted frame or bypass arrangement is available in that wall build-up.
- Adjacent finishes — plasterboard, stone cladding, timber panelling — so the architrave and jamb detail can be drawn to suit.
2. Layout and leaf count
State the number of leaves, which leaf is the active one, and the passing direction. For a two-leaf door, say whether both leaves pass or one is fixed. For wider openings in villas and hospitality rooms, three or four leaves on a twin track are common, and the split should follow the traffic line rather than the centre of the opening.
3. Substrate and finish build-up
Our pages describe material and finish options per project, so name the substrate you want for the leaf core and frame, then state the surface treatment: stain and clear coat, painted lacquer in a stated colour reference, or wood veneer with a specified grain direction. Where a door has to sit alongside our wood veneer pocket doors or cabinetry in the same room, ask us to match the veneer cut and sheen across both, and record that instruction on the drawing.
4. Track, hardware and duty rating
- Suspension or bottom-rolling operation, and whether a flush or exposed threshold is acceptable at that location.
- Hardware duty rating matched to leaf weight and expected use — guest room doors and heavily used shared rooms are not the same case.
- Pull handle, recessed pull, lock or no lock, and keying requirements where several doors serve one floor.
- Soft-close or bumper stops, and any acoustic or privacy requirement that affects seals and drops.
5. Glazing or solid panel
If the leaf carries glass, specify glazing type, thickness and whether clear, frosted or smoked — our glass sliding doors cover those same visual options when a project mixes solid timber and glazed leaves. Where fire rating, impact class or safety glass is required by the local authority, state that requirement explicitly; do not assume it is inherited from a previous order.
6. Room-by-room schedule and quantities
Give every door a unique code tied to a room or unit number, with quantity per code. A schedule that reads "12 doors" tells us nothing; one that reads "V03 — guest suite 2, two leaves, 1650 x 2400 mm, painted finish RAL reference to be confirmed" can be produced without interpretation.
7. Interface details and site conditions
Note anything the door has to work against: underfloor heating at the threshold, tiled floors with a level change, an existing head beam, or a ceiling finish that limits track depth. For refurbishment work, send photographs of the opening in its current state alongside the drawing.
8. Delivery, packaging and installation responsibility
State the delivery address, incoterm preference, container or consolidated shipment plan, and who installs. We handle logistics and door-to-door delivery on project orders, and installation support is available where arranged in advance — but the split of responsibility between your builder and our team needs to be fixed before production, not at handover.
Specification summary sheet
Copy this table into your enquiry. A filled version of it is what our project team works from.
| Field | What to record |
|---|---|
| Door code / room | Unique code, unit or room name, quantity per code |
| Opening size | Width and height in mm, rough or finished opening, floor level note |
| Layout | Leaf count, active leaf, passing direction, track arrangement |
| Substrate & finish | Core and frame material, surface treatment, colour or veneer reference, grain direction |
| Hardware | Operation type, duty rating, handles, lock/keying, stops, acoustic requirement |
| Panel infill | Solid panel or glazing type, glass option, any regulatory requirement |
| Interfaces | Threshold condition, adjacent finishes, headroom, site photographs |
| Logistics | Destination, shipment plan, delivery term, installer of record |
Common gaps we see, and what they cost
- Height given without a floor finish note. A 20 mm difference between structural slab and finished floor changes the frame detail and can put a leaf on the wrong running height.
- "Wood" with no substrate or sheen stated. Two buyers using that word can mean completely different constructions and budgets.
- No hardware duty rating. Under-rated runners on a heavy solid leaf show up as drag and sag after handover, when the fix is more disruptive than the specification would have been.
- Quantities without door codes. Site teams cannot place twelve identical leaves into twelve rooms without markings that match their own drawings.
A short worked example
A villa guest wing with three openings: bedroom-to-dressing-room doors, a bathroom door and a media-room screen. The specification that works lists each opening by code; records two leaves on twin track for the dressing room with one active leaf and soft-close stops; specifies the painted finish reference and matching architrave profile against the joinery already in the room; notes tiled floors with a recessed threshold at the bathroom; and marks the media-room door as flush with the wall line, which is where our flush sliding doors variant is the better starting point. Every item on that list came from a field in the summary sheet above.
Confirm before production starts
Materials, dimensions and finish selections for these doors are project-specific, so the approved drawing is the record that governs the order. Read it once against your own schedule — codes, quantities, opening sizes, finish references — and sign it only when it matches. That single confirmation prevents the change request that arrives after cutting has begun.
Send us your schedule
If you are sourcing doors and interior joinery for a villa, hotel or office fit-out, send the room schedule and opening drawings and our project team will return a specification sheet with the missing fields flagged before quoting. As a one-stop furniture and building materials supplier, we carry that same specification discipline through cabinetry, wall panelling, lighting and fixtures on the same shipment.