A high gloss veneer wardrobe is one of the few built-in items in a villa or apartment where every decision stays visible for years. The sheen reflects light across the whole door face, so a grain that was acceptable on a sample board can look busy once it covers two metres of sliding doors. Because our High Gloss Veneer Wardrobes are made to measure rather than taken from a fixed catalogue, the specification you confirm before production starts is what determines whether the finished joinery matches the drawings. The checklist below follows the order we work through with project buyers, designers and contractors on residential wardrobe projects.

1. What the veneer itself will be

Veneer is a thin cut of real wood over a stable engineered substrate, which is why it behaves differently from solid timber. Two things need to be fixed in writing before any panel is pressed: the species and cut, and how much variation between sheets you are prepared to accept.

  • Species and cut. Within our wood veneer wardrobe range we supply Walnut Veneer Wardrobes, Natural Oak Veneer Wardrobes and Smoked Veneer Wardrobes, and the same wood veneer family also covers Wood Veneer Panels when a bedroom needs the wardrobe and the wall to read as one surface. Tell us which of these you are specifying, or send the reference sample you are working from.
  • Cut direction and grain matching. Crown cut and quarter cut look different on a large door, and grain can be matched — book-matched, mirror-matched or run in one direction across a bank of doors. This has to be agreed before pressing, because it changes how many sheets are needed from the same log batch.
  • Tolerance for variation. Real veneer varies in colour and figure between sheets. Confirm whether you want tight grain matching across all doors or a more natural spread, and keep the approved sample as the reference for the delivered order.

2. The exact dimensions — and who measures them

Made-to-measure sizing is only useful if the numbers are taken after the surrounding finishes are fixed. For each wardrobe run, confirm the finished floor level, the finished wall faces, ceiling height at both ends of the run, and the position of skirting, architraves, lights, switches and air-conditioning outlets. Floor levels in a villa rarely run perfectly flat over three metres, so we need the high and low readings rather than one nominal figure.

Also state which party supplies the site measurement: your site team, or ours during on-site guidance under our design coordination service. If the wardrobe abuts Wall Panel Systems or integrated doors, those items must be measured against the same set of levels, not separately.

3. Layout and interior fittings

The carcass is where cost is won or lost, so send a room plan with your hanging heights, drawer bank positions and any items that must be stored — long garments, suitcases, an ironing board, a safe. Where the space is awkward, our Combination Modular Wardrobes approach lets open display niches sit beside closed storage in one run, and for a separate dressing room we build L Shaped Walk in Wardrobes to the room's own dimensions. Confirm at this stage:

  • Hanging zones: single, double or pull-down rails, and their heights.
  • Drawers, trays and dividers — quantity, load rating and whether soft close is required throughout.
  • Interior finish: how much of the inside is to be the same decorative finish as the outside, since visible interiors are usually quoted differently from standard carcass boards.
  • Integrated lighting: if door-interior or niche lighting is wanted, decide now so wiring routes and transformer access are built into the design.

4. Door type, hardware and clearance

High gloss surfaces show fingerprints and edge wear more readily than a matte lacquer, so door choice is as much about use as appearance. Sliding doors save the swing clearance a hinged run needs but require clear tracks and enough wall for the panels to stack; our High Gloss Sliding Door Wardrobes are built to the opening width you provide. Hinged doors need clearance in front of every door face, including near the bed and the bathroom entry. Confirm the hardware brand or model line, the handle or integrated pull detail, and whether mirrors or glass panels are part of the door — a gloss veneer door with a mirror inset is assembled differently from a full veneer door.

5. Finish build-up and how it will be checked

"High gloss" describes a result, not a recipe. Ask us for the coating system and the number of coats, then approve a physical sample panel that includes the edge treatment, because edges are where gloss and matte boundaries become obvious. Our Custom Furniture Materials and Finishes service covers bespoke finishes and material selection with prototyping, which is useful when a project must match an existing veneer already on site or a designer's specified sheen level.

Agree the inspection reference before production: the approved sample panel, the drawing set, and the acceptable limits for colour and gloss uniformity between doors. That gives both sides one objective standard at handover instead of an opinion under showroom lighting.

6. Packaging, delivery route and installation sequence

Gloss panels are the items most often damaged in transit, so confirm the packing method — edge protection, panel orientation, and whether doors ship loose or mounted on the carcass. Our Furniture Logistics and Door-to-door Delivery service handles freight, packaging and container loading, and delivers to site. Then fix the delivery date against the trade sequence on site: wardrobes should arrive after wet trades, painting and flooring are complete, and after the levels we measured have not changed.

Confirm who installs. We provide Furniture Installation and After-sales Support, including on-site fitting and inspection, or your own joiners can fit from our drawings — in that case request the assembly drawings and fixing details early enough for them to be reviewed before the panels land.

7. Documentation and after handover

Before the order is released, ask for the drawing set with every dimension initialled, the finish schedule naming species, cut and coating system, and the packing list format your site team needs for checking on arrival. After handover, keep the approved sample panel and the finish reference: they are what make a later matching extension or replacement door possible, and they are the record you quote from when ordering spare parts.

Bringing it together

The items worth locking down before production are the veneer species, cut and grain tolerance; measured dimensions taken after finishes are fixed; the interior layout and lighting; door type and hardware; the coating system with an approved sample including edges; packing, delivery date and installer; and finally the drawing set and finish schedule. Send us those seven items and a made-to-measure high gloss veneer wardrobe stops being an approximation of the drawing and becomes the thing you specified.

To check feasibility for your project, send the room plan, your target dimensions and a photo of the space, and we will confirm what can be produced to that specification.