Corner units are the joinery item most often quoted on assumptions. A drawing shows a return of a certain length, a finish note says "match vanity", and production is asked to make the rest work. On made-to-measure bathroom storage that is exactly where rework begins. The three inputs below — measurements of the corner itself, the project brief behind the unit, and the site conditions it has to fix into — are what we need from architects, builders and interior designers before Santerson Corner Storage can be specified rather than estimated.
The corner itself, measured in two directions
Corner storage sits across a junction of two walls, so one number is never enough. We need the clear distance from the corner apex along each leg to the first obstruction — a door reveal, a window sill, a piped chase or the edge of a vanity run. Clear, not finished-to-finished, and measured after plaster, waterproofing and tiling are accounted for.
- Both leg lengths, plus whether the corner is a true 90° or out of plumb.
- Floor-to-ceiling height at the corner, not just a nominal room height, if the unit is to be full height.
- Projection you can accept into each leg — the depth that stays clear of circulation and of any door swing.
Where the corner is out of square, tell us at the same time. A scribed face frame that follows the wall rather than the drawing is straightforward to allow for in production when it is known in advance, and a problem when it is discovered on installation day.
What the unit has to hold, and what it has to hide
The same footprint reads very differently depending on contents. Towels and linen want open or glass-fronted shelves at reachable heights. Cleaning products and spare stock want closed doors and deeper shelves. Because each unit is made to measure, layout follows use rather than a fixed module — we set shelf heights around what you list, not the other way round.
| Use case | Layout we usually work to | Related collection |
|---|---|---|
| Everyday towels, robes, display pieces | Open shelves at graduated heights, top shelf set above reach for stock | Santerson Corner Open Shelving |
| Linen, toiletries and supplies stored floor to ceiling | Full-height closed carcass with adjustable shelving, deep base zone for bulk stock | Santerson Corner Tall Cabinets |
| Mixed — display at eye level, closed storage above and below | Open middle band with closed upper and lower compartments | Santerson Corner Storage |
If the corner unit is part of a wider bathroom fit-out, say so at this stage. A Santerson Floating Vanity in the same room should share carcass material, door profile and finish, and that decision is cheaper to make on paper than to correct later.
Finish, substrate and fixing conditions
Made-to-measure sizing and material and finish options are configured per project, so we need the same level of detail on the surrounding build:
- The wall build at the corner — stud, brick, or the substrate behind a tiled or wet-area surface — so fixings and any required blocking can be planned.
- Whether the unit sits in a wet zone with direct splash, which changes the board and edge treatment we specify.
- The finish reference you are matching: laminate or veneer sample, paint code, hardware style, and any adjacent joinery already on site.
- For glass-fronted doors, the glass type and whether internal lighting is wanted, and where the wiring can be accessed for servicing.
What we send back
With those inputs in hand we return a configuration for your review: dimensions, layout, material and finish schedule, and any site preparation the corner needs before installation. Where a project combines storage with vanities, tall cabinets or other built-in joinery, we can coordinate them as one package under the same specification, so carcass materials, door profiles and hardware match across the room.
Send your drawings and dimension sheet to SANTERSON and we will confirm what is still outstanding before production begins.