Arched French doors are one of those details that change the character of a whole elevation. The curve above the opening softens a facade, raises the perceived ceiling height inside, and signals a level of joinery that square-edged doors simply cannot deliver. That is exactly why they are also the detail most likely to cause rework: an arch radius that does not match the drawings, a frame depth that clashes with the wall build-up, or a glazing bar layout that reads wrong once installed. Below is the confirmation checklist we work through with architects, builders and interior contractors before a set of Santerson Arched French Doors goes into production.
1. Openings, not catalogue sizes
Our doors are made-to-measure, so the first sign-off is dimensional rather than stylistic. Before anything is cut, we need three things agreed in writing: the structural opening dimensions, the floor finish level, and the tolerance allowance on each side. An arched head amplifies small errors — a frame that is a few millimetres out of plumb will visibly distort the curve, whereas the same error in a rectangular door disappears into the reveal.
Please confirm whether we are sizing to the finished opening or the structural opening, and who is responsible for making good around the frame. For renovation work, existing lintels and wall alignments should be checked on site before dimensions are frozen, because an arched unit cannot be trimmed on site the way a plain door can.
2. Arch geometry: radius, springing point and symmetry
Two numbers define the arch, and both should appear on the approved drawing rather than being inferred from a photograph. The first is the radius of the curve. The second is the springing point — the height at which the straight jambs stop and the curve begins. Change either one and you change the whole proportion of the opening.
For pairs of doors, confirm whether both leaves carry a half-arch meeting at the centre mullion or whether one leaf is fixed. This decision affects the mullion width, the hardware positions and how the set is packed for shipping. We recommend issuing a dimensioned elevation sketch with the curve drawn to scale, signed off by the design lead before tooling begins.
3. Frame material, finish and how they will be proved
Material and finish are specified per project, and we support bespoke finishes, textures and surface treatments under our Custom & OEM Service. What matters at confirmation stage is not the option list but the proof: a physical sample of the selected finish, viewed in the same light as the room it will sit in, and signed against a reference number that production will follow.
Wood tones in particular read differently under warm hotel lighting and cool daylight. If your project specifies a stained or painted match to existing joinery, supply the reference standard rather than describing the colour in words. Where several door types appear across one scheme — for example modern slim frame French doors on upper levels and arched heads at the entrance — confirm that the frame profiles and finishes are intended to match or deliberately contrast, so we tool them accordingly.
4. Glazing, sightlines and hardware duty
Glazing is where a drawing and a photograph disagree most often. Confirm the glazing-bar layout against the internal mullion positions, not just the external face, and confirm whether the arch head carries decorative bars or clear glass. Sightline symmetry should be checked on the elevation before approval.
Hardware duty is a functional question that should be answered by the specifier. Arched double doors are heavier than standard leaves, so hinge loading, handle position and any closer or access requirement need to be settled at order stage rather than at handover. If the set forms part of an accessible route, confirm the clear opening width you need after the frame and leaves are accounted for.
5. Delivery sequence and site readiness
Arched units are bulky and awkward to store on a busy site, so delivery timing is part of the specification. We arrange freight by sea, air or rail with customs paperwork, packing and container loading handled through our logistics and door-to-door delivery service; what we need from your side is a named receiving contact and an agreed slot. Confirm that the openings are weather-tight, floors are levelled and the frame fixings detail matches the wall build-up before the doors arrive.
On arrival, inspect each set against the approved drawing while the packing is still intact, and record any damage on the delivery paperwork. Our installation and after-sales support includes on-site installation and inspection against the approved drawing, so agreeing the fixing detail in advance keeps that stage short.
The sign-off list, in one place
- Finished opening dimensions, floor finish levels and side tolerances confirmed against a site survey
- Arch radius and springing height drawn to scale, with the fixed-and-active leaf arrangement stated
- Frame material and finish proved by signed physical sample, referenced by code
- Glazing-bar layout checked against internal mullions; arch head treatment agreed
- Hardware duty, hinge loading and clear opening width confirmed by the specifier
- Delivery slot, receiving contact and on-site storage location agreed
- Frame fixing detail matched to the wall build-up before installation begins
Every item above is a decision your team makes once, on paper, instead of several times on site. Send us the drawings and the finish references and we will return shop drawings for your approval before production starts.
Planning an entrance elevation, a ballroom frontage or a villa living room that needs arched openings? Send your drawings to our project team at SANTERSON — a China-based manufacturer of furniture and building materials working on villa, hospitality and office projects worldwide — and we will confirm feasibility, specification and quotation before anything is tooled.