A swim spa submittal is the package a specifier, builder or procurement lead uses to approve the unit before it ships: shell and structure, jet and pump schedule, lighting and water features, controls, options, site requirements and commercial terms. For a project in Australia or the Middle East, where the unit arrives by sea and is craned onto a deck, an incomplete submittal turns into re-orders, dead days on site and change orders. The list below follows the information we publish on our own product pages, so you can check any supplier package against it line by line.
1. Shell, structure and finish schedule
Our premium Luxury Outdoor Swim Spa with Massage Jets, LED & Water Features is described on the product page as having an acrylic interior, a reinforced cabinet and a high-performance water system. A submittal should name each of those three layers separately rather than grouping them as "premium construction". Ask for:
- the interior surface material and the make or grade of acrylic used
- the cabinet framing and cladding build-up, including what sits between the shell and the exterior panel
- the insulation specification, which our catalogue lists as an option rather than a fixed inclusion
- the exterior colour or finish code matched to the project's deck, pergola and facade palette
- access panel locations for pumps, filters and controls, drawn on a plan view
2. Jet layout and pump schedule
Jet count alone says very little; jet position relative to the body does. Two units of similar size in our range show how much this varies. The Outdoor Swim Spa WS-130AⅨ is catalogued at 8000 × 3000 × 1400 mm with a total of 20 jets, one filter pump and one water pump. The Outdoor Swim Spa WS-115AⅨ-U, much shorter at 3880 × 2200 × 1250 mm, is listed with 23 jets and four water pumps. A submittal should therefore carry a numbered jet map, the pump quantity per function, and which seats each jet group serves.
3. Swim current and training system
Not every model carries one. The WS-130AⅨ specification lists a swim training system as one set, while the same field on the WS-115AⅨ-U page reads "Not listed". If the project brief calls for lap swimming against a current, that line has to be confirmed in writing for the exact model and configuration, together with how the current is generated and adjusted.
4. LED lighting and water features
LED counts differ widely across the range: seven on the WS-130AⅨ, four on the Outdoor Swim Spa WS-SP600, one on the WS-115AⅨ-U. State fixture locations, whether colour changing is standard or optional, and how the lights are controlled. Then list the water features by name — waterfall, laminar jet, spillover edge — because the marketing title "water features" is not a specification.
5. Water treatment and control system
Ozone appears in the "features shown" line on several of our model pages, and UV sterilization sits in the optional accessories list along with sand filtration. A submittal should say which treatment is included in the quoted configuration, which is an add-on, and what routine dosing or filter cleaning the owner is expected to carry out.
6. Electrical load and site preparation
Total power is published per model: 10.85 kW for the WS-130AⅨ, 11.85 kW for the WS-115AⅨ-U, 9.35 kW for the WS-SP600. Those figures are what the electrical engineer needs to size the circuit, and a heat pump — an option in our catalogue — changes the picture. The submittal should also fix the structural point load of the filled unit on the deck, drainage and overflow routing, lift and crane access, and the pathway from the delivery vehicle to the final position.
7. Options list with prices
Our product pages list control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps as catalog options, with availability and compatibility varying by model. Present them as a priced table so the client can decide now rather than after the container is booked.
8. Packaging, freight and installation scope
SANTERSON works as a furniture and building materials manufacturer supplying villa and hospitality projects, and our service pages describe sea, air and rail freight with customs paperwork and door-to-door delivery. The submittal should state the packing method, container type, who handles customs clearance at destination, and where supplier installation support ends and the local contractor begins.
9. Coordination with the surrounding terrace
A swim spa is rarely approved alone. The same package usually needs a shaded lounge next to it, which is why we often specify the Motorized Louvered Aluminum Pergola with LED Strip & Zip Screens alongside the water feature: rotating aluminium louvers, built-in LED strips and optional zip screens for side sun and privacy. Keeping both in one submittal keeps frame colours, lighting control and dimensions on a single drawing set.
10. Approval record and contact
Close the package with a sign-off sheet: model code, configuration, options selected, drawings revision number, approval date and the name of the person who approved it. Send your drawings and room dimensions to us through the contact page and we will return a submittal built on this structure for the model you are considering.
Figures quoted above are transcribed from the catalogued product pages for the named models. Confirm included equipment, electrical requirements and options for the selected configuration before ordering.