A mid-century modern whole-house fit-out succeeds or fails on two things that are decided before any panel is cut: the quantity schedule and the way products coordinate with each other. Warm wood grain, travertine accents, arched niches and soft curved lines look effortless in a finished home. In production they are dozens of separate items — entry storage, sideboard, wardrobes, bay-window seating, kitchen cabinets, doors, wall panelling — that must share the same timber tone, the same handle detail and the same site dimensions. This guide walks through how buyers, builders and interior consultants build that schedule, using our Custom Mid-century Modern Whole House Custom Furniture Project as the working example.
Why whole-house custom furniture needs one quantity list, not several
When joinery is ordered room by room, three problems appear at installation. Timber tones drift between batches because each order was placed separately. Site dimensions are taken twice, by different people, and the second set never matches the first. And functional items that should repeat — a handle detail, a shelf depth, a skirting return — end up specified differently in every room.
A single quantity list solves all three. It records every custom item in one place, with its room, its opening dimensions, its material and finish code, its hardware, and the trade it has to interface with. That document is what we price, what you approve, and what our factory builds against.
Step 1: Break the project into a room-by-room item list
Start from the floor plan and write one line per custom item, not one line per room. In the mid-century modern house we produced, the list ran roughly as follows.
| Zone | Typical custom items to count separately | What has to be confirmed before quantity is fixed |
|---|---|---|
| Entrance | Entry storage cabinet, open display niches, travertine decorative blocks, bench seating | Clear wall length, door swing, niche heights for the artwork actually planned |
| Living room | Sideboard with floating shelves and closed cabinets, travertine countertop, media wall panelling | Appliance sizes for the coffee machine and wine set, power outlet positions, TV recess size |
| Bedrooms | Full-height integrated wardrobes, bay-window cabinet and bed platform, bedside niches | Bay-window reveal depth, ceiling height variation, hanging heights per occupant |
| Kitchen | Wood-grain cabinets, tall units, deep metal drawer sets, island carcass | Built-in appliance schedule, bench height, splashback return |
| Stair & circulation | Open bookshelf beside the staircase, vertical slat partition, decorative tile on stair risers | Riser and tread dimensions taken in place, not from drawing |
| Bathroom | Barn door, vanity unit, countertop with integrated basins | Wall setting-out for wastes and taps, waterproofing upstand |
Count each of these as its own line even when they share one finish. A wardrobe carcass and a sideboard carcass are the same board but different fabrications, and pricing or scheduling them together hides where the cost sits.
Step 2: Fix quantities with a site survey, not a drawing
For custom cabinetry, take-off from architectural drawings gets you close; it does not get you to a gap-free installation. We carry out an on-site measurement after the flooring, plaster and setting-out are complete, because those three elements change finished dimensions by enough to matter for a full-height wardrobe or an under-bench unit.
- Measure each opening at three points — top, middle, bottom — and record the smallest and largest. Old buildings are rarely square.
- Record finished floor level against a single datum used across all rooms, so units in different zones sit at consistent heights.
- Mark the position of every power outlet, switch, waste, soil pipe and light point that a cabinet will pass or cover.
- Note obstructions the drawing omits: skirting depths, cornice lines, radiators, structural columns, ceiling bulkheads.
Once those measurements are in the quantity list, they become the manufacturing dimensions. Nothing downstream — 3D rendering, sample approval, production — should be allowed to contradict them.
Step 3: Coordinate materials and finishes across the whole house
The mid-century modern look depends on a small palette repeated everywhere. In this project that palette was warm wood grain, travertine elements, cream wall paint, arched doorways and soft ambient lighting. Coordination means deciding each element once and applying it consistently.
Wood tone
Specify the timber by sample reference rather than by name, and place all cabinetry that shares that tone in one production batch. Doors, panelling and furniture frames ordered at different times can arrive with visibly different grain colour even from the same supplier.
Stone and travertine
Count stone by developed area including returns, edges and any mitred corner, not by plan area. Book-matched or vein-direction pieces need a cutting layout agreed before slabs are fabricated, which changes how much material you order.
Handles and facade detail
This project used hidden pull-free handles throughout to keep facades minimal. That single decision affects door thickness, drawer runner choice, the gap between adjacent doors, and whether a corner unit can open at all. Decide it once and apply it to every line on the list.
Curves and arches
Arched openings, curved shelving and radiused ends need their own line items with a radius stated. They are fabricated parts, not field adjustments, and they cannot be improvised on site.
Coordination rule of thumb
Anything that appears in two or more rooms should be specified once, centrally, and referenced by code everywhere else. One finish schedule, one handle schedule, one stone cutting layout.
Step 4: Sequence the interfaces with other trades
Custom furniture rarely stands alone. Each item on your quantity list has at least one interface that must be resolved before production, because the joinery and the adjacent trade are working from the same millimetres.
- Flooring: engineered wood laid before a full-height wardrobe leaves an expansion gap behind the plinth; decide which goes first and detail it.
- Electrical: integrated lighting inside niches and floating shelves needs conduit and driver access decided at design stage, not at installation.
- Wet areas: a vanity countertop with integrated basins must match the waste and tap setting-out exactly, and the waterproofing upstand has to be drawn.
- Doors and panelling: a barn door needs its track pocket, wall build-up and clear opening confirmed before the surrounding wall is closed.
Our interior design service covers exactly this — space layout planning, 3D visual renderings, drawings and production coordination with on-site guidance — so the interfaces are settled on paper rather than discovered by an installer.
Step 5: Group the order to protect finish consistency
A whole-house project can be released in one package or in phases. Both work, with different trade-offs.
| Release approach | Advantage | Watch out for |
|---|---|---|
| Single package, all rooms | One timber batch, one finish schedule, one container, consistent tone across the house | All site measurements must be final before production starts |
| Phased by zone | Matches on-site progress; earlier zones hand over sooner | Later batches may vary in grain or stone veining unless samples are retained |
| Carcass first, doors and tops later | Gives time to confirm stone and door finishes on site | Two deliveries and two installation visits to coordinate |
Whichever you choose, keep the quantity list as the master. Phases should be drawn from it, not written separately.
Step 6: Confirm what is custom and what is standard
Not everything in a house needs bespoke fabrication. Standard components — drawer boxes, runners, hinges, shelf pins, basins, tapware — buy faster and cheaper when taken from an existing range. Custom effort should go where the design demands it: full-height facades, arched niches, bay-window integration, stair-adjacent shelving.
Through our custom and OEM service, cabinet size, material, colour and function are all adjustable, with 3D modelling and prototyping before production. Related whole-house references on this site include the Mid-century Whole House Custom Cabinetry & Built-in Storage Project, which pairs a bay-window desk with drawer storage and an open staircase bookshelf, and the Arched Niche & Full House Custom Wall Cabinet Project, which combines lit display niches, a full-height seamless wardrobe and a marble bathroom vanity top.
As a one-stop furniture and building materials supplier, we also supply the finishes that sit around the joinery — engineered European oak flooring, decorative and acoustic wall panels, interior doors, vanities and ceramics, lighting. Sourcing them on the same project order means one coordination point and one delivery schedule instead of several.
Step 7: Plan packing, delivery and installation from the quantity list
The same list that drives production should drive logistics. Item counts and finished dimensions determine how many crates are needed, how they load into a container, and which zone has to arrive first. We handle freight by sea, air and rail with customs paperwork, packing and container loading, shipment tracking and door-to-door delivery, then on-site installation with inspection and snagging.
Practical checks before goods ship: confirm the receiving access at site — door widths, lift sizes, stair turns, parking for an unloading vehicle. A full-height wardrobe panel that clears the factory floor will not always clear a residential entrance hall.
A practical quantity checklist
- One line per custom item, with room, elevation and a reference number that appears on the drawings.
- Finished dimensions from an on-site survey after flooring and plaster are complete.
- Material and finish code for every surface, matched to a signed physical sample.
- Hardware schedule: hinges, runners, hidden handles and integrated lighting, with quantities per item.
- Stone areas measured with returns and edges, plus an agreed cutting layout.
- Interface notes for flooring, electrical, plumbing and door openings on each relevant line.
- Release plan: single package or phased, with the delivery order stated.
- Site access check before packing is finalised.
Work through those eight points and the quantity schedule becomes a document both your site team and our production team can build from without interpretation.
Send us your drawings and we will build the schedule with you
For a whole-house project, share your floor plans, a room list and any reference images. We return a measured take-off, a 3D design proposal and an itemised quotation covering cabinetry, doors, panelling and the matching finishes — then production, delivery and installation under one contract. Contact SANTERSON to start a project consultation.
Scope, material options, lead times and service coverage are confirmed per project during quotation; figures above describe the referenced case rather than a standard specification.