A stacked laundry unit sits at the awkward intersection of joinery, plumbing and appliance selection. Get the dimensions right on paper and it installs cleanly; miss one clearance and the whole cupboard has to be rebuilt. If your design brief already names a stacked laundry unit as part of the bathroom or laundry fit-out, this article shows exactly what to send so we can price it and build it without three rounds of clarifying emails.

What a design brief usually leaves out

Most briefs we receive describe the laundry in adjectives: "compact", "clean lines", "matches the kitchen". Those are useful for the look and useless for the build. A stack is a vertical assembly, so the numbers that decide whether it works are the ones rarely written down — where the water inlet sits, which way the machine door opens, whether the tall cabinet next to it projects past the wall face, and whether the floor is tiled before or after the carcass goes in.

Our compact laundry solutions are made to measure for exactly this reason: layout, finish and dimensions follow the room drawing rather than a fixed catalogue size. The trade-off is that we need the room drawing.

The six items we need before quoting

ItemWhy it matters for a stack
Room elevation or floor plan with dimensionsSets the carcass width and height, and shows what the unit has to clear — skirting, door swings, pipework, a window sill.
Appliance make and model, or the envelope you want to allowFront-load washer and dryer heights vary by manufacturer. If appliances are not yet selected, tell us and we will design around an allowance instead of a fixed machine.
Plumbing and drainage locationInlet, outlet and any existing boxing determine whether the stack sits on the wet wall or needs services relocated.
Ventilation requirement for the dryerVented and heat-pump dryers need different provisions behind and above the unit.
Finish and door styleWhether the joinery continues from the kitchen, bathroom vanities or wardrobes decides the material and edge detail. Send the finish code or a sample reference if you have one.
Quantity and delivery destinationA single villa laundry and a repeat apartment type are quoted differently, and freight is planned per shipment.

Send the appliance question back to us if you have not settled it

You do not need a confirmed appliance schedule to start. Two approaches work, and the choice changes the drawing:

  • Design around your machines. Send the model numbers; we build the carcass and shelf heights to those dimensions and confirm the clearances back to you.
  • Design around an allowance. We size the enclosure to a generous envelope, so the buyer can choose within a range later. This costs a little width or depth in the room and saves a re-order when the appliance decision slips.

Where the laundry also has to hold linen, cleaning supplies and ironing, we usually pair the stack with washer dryer cabinets or a tall cabinet run above and beside it, so the appliance enclosure and the storage are drawn as one assembly instead of two trades meeting on site.

How the enquiry moves to production

Once we have the items above, the process follows the same steps as our other built-in work:

  1. Consultation and space planning. We review your drawings and flag conflicts — a door that fouls the machine, a drain too far from the enclosure, a finish that will not survive in a wet room.
  2. Specification and quotation. Dimensions, material, finish and hardware are listed line by line, so you can see what is included before you approve it.
  3. Production. Made-to-measure manufacturing under our custom and OEM service, with the same material palette used for your kitchen and wardrobe packages.
  4. Logistics. Freight, packaging and door-to-door delivery arranged through our logistics service, with paperwork handled on our side.
  5. Installation guidance and after-sales. Site coordination and support after handover, so the stack is set level and the services connected properly.

A short example of a workable enquiry

"Villa project, three levels. Laundry on level 1, plus two apartment-style laundries in the guest wing. Existing wet wall on the north side; washer and dryer not yet selected, please design to an allowance. Joinery to match matte handleless kitchen fronts. Send elevation options for a full-height stack with a work surface above and a pull-out hamper bay beside it."

That single paragraph gives us room geometry, services, appliance status, finish intent and scope in one pass. Attach the floor plan and we can come back with drawings rather than questions.

Checklist before you hit send

  • Dimensions marked on a plan or elevation, not estimated verbally
  • Appliance models confirmed, or an explicit "design to allowance"
  • Inlet, drain and vent positions noted
  • Finish reference or the product line it must match
  • Quantity per type, and the delivery address
  • Any site constraint: low ceiling, uneven floor, tiled-before-install sequence

Talk to us about your laundry package

As a one-stop project furnishing supplier, SANTERSON manufactures furniture and building materials in China and supplies project fit-outs end to end — design coordination, made-to-measure production, freight and installation support. Send the brief you already have; we will turn it into a specification you can approve.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com
Enquiries receive a response within 24 hours (Monday–Saturday, 8:00 AM–6:00 PM GMT+8). Full details on our contact page.