An arched niche and full-house custom wall cabinet package is not one product but several joinery items sharing one set of drawings, one finish schedule and one delivery window. Getting the quantities right therefore means counting openings, runs and panels against a measured drawing, then locking the coordination points — arch radii, reveal depths, lighting circuits, stone edges — before production starts. The steps below follow how we build these packages for villa and apartment projects, using our arched niche and full house custom wall cabinet project as the reference case.

What one package actually contains

In the reference project, one continuous run of warm wood-grain joinery carries five different functions: an arched wall niche with built-in lighting for display, layered floating shelves, a full-height seamless wardrobe with flush panels, an integrated vanity table with drawers next to an arched textured glass window, and — in the bathroom — a double sink countertop in natural green marble. Each of those is a separate line item on a purchase list even though they read as one wall on site.

Splitting the package into its component items is the first thing to do before you count anything, because each item is measured differently:

  • Niche and shelving — counted per opening and per shelf module. Our niche shelving and custom niche paneling are made to measure, so the quantity driver is the number of recesses and their reveal depth, not floor area.
  • Full-height wardrobe walls — counted by linear metres of run and by door leaf. A full height storage wall that reads as one flat surface still needs its door count, hinge type and handle detail fixed early.
  • Vanity and countertop — the carcass and the stone top are separate orders with separate lead times. A double vanity needs basin set-out and tap hole positions confirmed before the top is cut.
  • Around it — arch-matched doors, skirting returns, cornices and any concealed door that has to sit inside the same panel line.

Counting quantities from a measured drawing

Custom joinery is quoted off dimensions, not off a catalogue box count. Work through the package in this order and your quantities will hold when production starts.

ItemUnit of measureWhat must be fixed first
Arched niche / display recessper openingOpening width and height, arch radius, reveal depth, lighting position and driver location
Floating shelvesper shelf moduleSpan, bracket concealment, wall substrate for fixings
Full-height wardrobe walllinear metre of run + per door leafFloor-to-ceiling height at several points on the run, door layout, handle or push-open choice
Integrated vanity unitper unitDrawer stack, internal fit, position of any glass window or mirror
Stone countertopper top, by cut sizeBasin type and set-out, edge profile, splashback return, tap and waste positions
Arch-matched doors and panelsper leaf / per panelOpening size after floor finishes, arch profile matching the niche, ironmongery
Integrated lightingper metre of linear fitting + per driverDriver access point, switching, dimming protocol

Two practical habits keep these numbers honest. First, take heights and widths at the finished face of the wall and floor, not the structural one — a 25 mm flooring build-up changes every wardrobe height on the run. Second, record each opening twice: once as drawn, once as measured on site. Where the two disagree, order to the site dimension and note the difference in writing.

Coordination points that decide whether the wall reads as one piece

The arched look fails quietly when individual items are each correct but do not share a language. Fix these across the whole package before any panel is cut.

  • One arch radius, repeated. The niche arch, the vanity window head and any arched door should follow the same radius and the same springing height, otherwise the curves compete. Specify the radius as a dimension on the drawing rather than as an image reference.
  • One grain direction and one batch of veneer or melamine. Wood-grain panels pulled from different batches or run in mixed directions will show at the joint between wardrobe and niche. Tell us the grain direction for each elevation and keep a whole wall within one production batch.
  • One reveal depth. Shelves, niches and doors that return into the wall should share a reveal so shadow lines line up across rooms.
  • Lighting decided with the carcass. Integrated cabinet lighting has to be routed, wired and given a driver access point at manufacture; retrofitting later means visible patching. Confirm voltage, driver location and dimming before the panels are machined.
  • Stone and joinery measured from the same drawing. The marble top bears on the vanity carcass, so its cut size, edge profile and splashback must be issued together with the cabinet dimensions, not after them.
  • Services first. Any socket inside a niche or vanity, and any waste or supply behind a double top, has to be positioned against the joinery drawing before the wall is closed up.

Order all items in one package from one manufacturer wherever you can. When niche, wardrobe, vanity and doors come from different suppliers, matching arch profiles, wood tones and reveal depths becomes a negotiation on site instead of a drawing decision — and that is where these projects lose time.

Sequencing the order against site works

A full-house joinery package moves through a fixed sequence, and each stage has something it needs from you:

  • Design and planning. Send floor plans plus the elevations you want paneled. We produce 3D renderings of each wall so the arch proportions, shelf layout and wardrobe internal fit can be signed off before anything is cut.
  • Measurement. Either our team measures on site or you send verified dimensions taken at the finished face. This is the number that becomes the order.
  • Detail confirmation and quotation. Finish schedule, panel material, arch radius, hardware, lighting and stone set-out are confirmed line by line, then priced as one package.
  • Production. Panels for a single wall are made in one batch so tone and grain match. Where you want different rooms released at different times, say so at this stage — it changes how the order is packed and shipped.
  • Logistics. Freight by sea, air or rail with customs paperwork and container loading planned around your site programme, delivered to the project address.
  • Installation and handover. Panels go up in the order the drawings show — wardrobe carcasses first, then niche and shelving modules, then doors, then stone tops, then lighting commissioning.

Build a float into the programme between measurement and installation. Site finishes almost always shift after the joinery is made, and the float absorbs that without re-cutting panels.

Before you release the order: a short checklist

  • Every elevation drawn, dimensioned and signed, with arch radius and springing height written as numbers.
  • Finish schedule confirmed per item — panel material, wood tone, glass type, stone selection — with one batch specified per continuous wall.
  • Door count, hinge or sliding system and handle choice fixed for each wardrobe run.
  • Basin, tap and waste positions confirmed against the stone top; countertop cut size issued with the carcass order.
  • Lighting positions, driver access and switching shown on the joinery drawing.
  • Site dimensions verified at the finished face, with any difference from the drawings recorded in writing.
  • Delivery address, room-of-arrival and unpacking arrangements agreed, plus a float before installation begins.

Questions buyers ask us

Can the niche, wardrobe, vanity and doors really come from one order?

Yes. That is how the reference project was built — site measurement, 3D rendering, manufacturing and on-site installation handled as one package, with panel material, wood colour, arch shape and storage layout customised to the space.

What do you need from me to price a full-house package?

Floor plans, the elevations you want paneled, and your preferred finishes. From there we produce renderings and a line-by-line quotation so you can see quantities per item rather than one lump sum.

How do you keep wood tones matching across rooms?

By keeping each continuous wall in one production batch and confirming the grain direction on the elevation drawing. If a wall is split across two shipments, we flag it before production rather than after.

If you are planning arched niches or whole-house joinery, send us your drawings for a measured quotation and rendering — the project page shows the reference case, and our contact page reaches the team directly.