A swim spa destined for a villa, resort or wellness facility rarely travels alone. It is a heavy, powered, water-filled assembly that arrives with crates, spare parts and electrical components, and it has to be lifted onto a prepared base before the project team moves on to finishing works. That sequence — not the product page — is where most overseas orders lose time. This guide walks through how we plan international delivery for a project order of Outdoor Swim Spa WS-PC06ST-L, from the configuration you confirm at quotation stage to the handover checklist your site team signs off.

Start With the Configuration, Not the Container

Delivery planning begins with the exact build you order, because options change both the freight profile and the site works. The catalog specification for this model is a useful starting point, and every line below has a direct effect on logistics or installation:

ModelWS-PC06ST-L
Catalog dimensions6390 × 2400 × 1470 mm
Swim training system1 set
Control system1 set
Filter pump1 pc
Jet total6 pcs
LED lights4
Total power6.55 kW
Features shown on the product pageWater jets, LED lighting, Ozone, Swim training system

Two points matter for planning. First, the length of 6390 mm and the width of 2400 mm determine how the shell is crated and which container type it fits; access to the site — gate width, turning radius, overhead clearance — has to accommodate that crate, not just the finished spa. Second, total power is stated as 6.55 kW in the catalog for this configuration. That figure is a planning input for your electrician, and it changes once options are added.

The catalog lists control system, swim training system, filter pump, jets and LED lights for WS-PC06ST-L, while the water pump is not listed in the captured specification for this model. Confirm the included equipment list and the electrical requirements of your chosen configuration in writing before production starts — that single document drives the packing list, the customs paperwork and the site preparation.

Optional Equipment Changes the Shipment

Catalog-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Each one affects delivery in a practical way:

  • Heat pump and insulation. A heat pump adds a separate powered unit with its own wiring and condensate considerations. Insulation package changes the shell build. Both should be on the packing list as identified items so nothing is mistaken for loose accessory cartons at customs.
  • UV sterilization and sand filtration. Filtration components are bulky and, in the case of sand filter media, heavy. They are usually shipped separately from the shell and installed on site; confirm whether media travels with the order or is sourced locally.
  • Steps and access items. Steps fix the finished height at the entry point and must align with the level of your prepared base, so their dimensions belong in the base drawing before concrete is poured.
  • Water pump. Where a pump is supplied for the selected configuration, it typically arrives as a separate carton and is fitted on site. Match its model number to the electrical schedule your engineer signs off.

Freight Mode and Incoterms: Decide Who Owns Which Leg

We arrange global freight forwarding by sea, air and rail, together with customs paperwork, packaging and container loading, shipment tracking and Furniture Logistics and Door-to-door Delivery. For a swim spa order the realistic choice is sea freight; air freight is rarely economic for a shell of this size. The decision that actually shapes your budget is the Incoterm.

  • Door-to-door. One coordinated shipment from our loading point to your site, with our logistics coordinator tracking it through to delivery. This suits buyers who want a single line of accountability for a project order that may also include furniture and other building materials.
  • Port-to-port or CIF. You appoint the destination agent. You then handle import clearance, duty and inland transport yourself, which can be cheaper where you already work with a local forwarder.

Documents we prepare for the shipment include commercial invoices, packing lists and certificates of origin; import permits and any destination-side approvals remain the importer's responsibility. Cargo insurance options are available — for a single high-value shell plus electrical components, we recommend you decide on cover before loading rather than after.

Transit time, duties, taxes and inland delivery terms vary by destination and change with carrier schedules. We will quote the freight leg you select for your port or site address; please treat any transit figure in correspondence as a quotation for that shipment, not a guaranteed service level.

Packaging, Crating and Unloading

The shell ships on a crate designed for its footprint, with the jet set, LED lights, control system, filter pump and any optional equipment packed as identified cartons. Three practical notes from project deliveries:

  • Check the crate against the access route. Measure the widest constraint on the final approach — gate, doorway, garden edge or lift — before the truck arrives, and share those numbers with your crane or rigging contractor.
  • Book the lifting equipment for the delivery day, not later. A shell of this length needs a crane, forklift or gantry sized to its crated weight. Idle plant on site costs money whether or not the spa has been unloaded.
  • Photograph the crates at handover. If damage is found later, dated photographs taken at delivery support the insurance claim; opening a damaged crate without noting it weakens that claim.

Site Preparation Before the Truck Arrives

The most common cause of delay is not freight — it is a base that is not ready. Complete these before delivery is scheduled:

Base and structure

  • A level, load-bearing base sized to the 6390 × 2400 mm footprint, with drainage falls resolved around it.
  • Confirm whether the spa is installed above ground, semi-recessed or fully recessed; recessed installations need retained edges and access for maintenance before the surround is built.
  • Maintenance access kept clear to the filter pump, control system and jet fittings — these are service items, not one-time installations.

Power and controls

  • Electrical supply sized for the confirmed configuration, using the catalog figure of 6.55 kW total power as the starting point and adding any heat pump or optional equipment.
  • A dedicated circuit with the protection your local regulations require, installed and tested by a licensed electrician at the destination.
  • Position of the control system agreed on the drawings so cabling is in place before the surround or deck finish is completed.

Water, drainage and commissioning

  • Fill water supply, an overflow or skimmer route, and a drainage point for draining and cleaning.
  • Storage location for chemicals and a plan for routine water treatment; the ozone feature reduces but does not remove that routine.
  • A named site contact who can receive the delivery, sign for it and release the installation team.

Installation and Handover

Once the shell is set on the base, installation follows a short, repeatable sequence: fit the swim training system and jets to the configured count of six, mount the filter pump and plumbing, connect the four LED lights and the control system, then fill, power up and commission. Commissioning is where you verify the things that matter in operation — jet performance, water heating behaviour, filtration cycle, control response and lighting — while the installation team is still on site.

Our Furniture Installation and After-sales Support covers on-site installation, inspection with a snag list, warranty coverage, spare parts and replacement, and ongoing maintenance. For swim spa orders we recommend recording the model number WS-PC06ST-L, the confirmed option list and the commissioning readings in the project handover file. That record is what allows a later spare part request to be matched correctly without anyone guessing at the specification.

Project Orders That Travel With Other Materials

Swim spas are rarely the only item in a villa or hospitality order. Poolside loungers, outdoor furniture, bathroom fixtures and wall or floor finishes usually arrive on the same programme, and coordinating them avoids stacked deliveries competing for the same crane and the same crew. If your project needs several categories at once, we consolidate them under one procurement and delivery plan as part of our Turnkey Interior Project Solutions, so the swim spa, the surrounding furniture and the finishes reach site in a sequence your builder can work with.

A Simple Timeline to Work Backwards From

1. Confirm configurationModel, options, included equipment list and electrical requirements agreed in writing.
2. Agree freight termsIncoterm, destination, insurance cover and delivery address fixed on the order.
3. Produce and packShell built to specification; cartons identified against the packing list.
4. Prepare the site in parallelBase, power circuit, drainage and access completed while the order is in production and transit.
5. Deliver and liftRigging booked for the delivery day; crates inspected and photographed at handover.
6. Install, commission, documentSystems fitted and tested; snag list closed; specification filed for future service.

If you are specifying Outdoor Swim Spa WS-PC06ST-L for a project overseas, send us the site drawings, the destination address and the option list you want. We will confirm the configuration, quote the freight leg you need and give you a delivery plan your builder can schedule against — with the same documentation trail from production through to handover.