A run of closed bookshelves looks simple on a drawing until it reaches site: doors that do not line up, shelves that will not carry the books they were designed for, finishes that read differently under the room's lighting, and a handover list full of snags. For residential living projects, Santerson Closed Bookshelves are made to measure for each space, with the layout, material and finish confirmed per project rather than picked from a fixed catalogue size. That flexibility is exactly why approval should be gated by a short, written set of confirmations. Below is the checklist we ask project teams to close out before a shelving order is released.

1. Dimensions: what the opening actually gives you

Closed bookshelves are built around a wall, so the drawing dimensions and the site dimensions have to be reconciled before anything goes into production. Confirm these as as-built figures, taken on site after the floor, wall finishes and ceiling are complete:

  • Overall height, width and depth of the intended run, measured at several points rather than one.
  • Floor-to-ceiling condition: whether the unit is meant to touch the finished floor and finished ceiling, or whether a shadow gap or skirting return is required.
  • Obstructions: switches, sockets, sprinkler heads, air diffusers, radiators, curtain lines and door swings that cross the run.
  • Out-of-plumb and out-of-square walls, and how the scribe or filler panel will be resolved instead of left to site trimming.
  • Adjacent finishes - flooring, wall panelling and ceiling - and who carries the interface detail on the drawing.

If a full-height treatment is under consideration, compare it against Santerson Floor to Ceiling Bookshelves at the same stage. The two are specified differently: a closed unit sits within a defined opening and can be read as furniture, while a floor-to-ceiling system resolves the whole wall plane and changes how the top detail, cornices and lighting runs are drawn.

2. Internal layout: shelf spans, heights and what goes in

The internal schedule is where most change orders come from. Before approval, ask the client or architect to confirm:

  • Shelf spacing per bay - hardback books, display objects, boxed files and records all need different clear heights.
  • Clear span of each shelf and where a vertical divider or supporting standard is needed to keep long shelves from deflecting under load.
  • Adjustable versus fixed shelves, and the pitch of the adjustment system if shelves are to move later.
  • Deep versus shallow bays, and whether any bay is intended for storage rather than display.
  • Where open display niches or Santerson Modular Bookshelf Systems should break up a long closed run, so the elevation is not one uninterrupted wall of doors.

A practical rule for approval: every dimension on the internal schedule should be traceable to something the client actually intends to store. Where that is unknown, note it as an open item rather than assuming a default spacing will do.

3. Materials and finishes: what is being signed off

Made-to-measure work means the finish schedule is a specification, not a preference. Confirm in writing:

  • Carcase and door substrate, edge treatment and surface material, with the exact decorative reference - not a colour name alone.
  • Sheen level and grain direction, especially for wood-effect doors on a long run where a mismatch in grain reading is visible from across the room.
  • Internal finish: whether shelf backs and carcase interiors match the exterior or drop to a standard interior option.
  • Back panel type and thickness, and whether a reveal or shadow gap is required behind the unit.
  • A physical sample approved against the drawing before production, held on site as the reference for handover inspection.

Material availability and the exact finish options for a given configuration are confirmed with us per project; we do not assume that a finish shown on one elevation is available in every door style.

4. Doors, hardware and opening clearance

Closed bookshelves live or die on their doors. Confirm:

  • Door type - hinged, sliding or concealed within a panelled wall - and the hinge or runner specification supporting it.
  • Door size and weight limits for the chosen hardware, and where a door needs to be split because it exceeds them.
  • Handle strategy: profile handle, integrated pull or push-open mechanism, and how that reads against neighbouring joinery in the same room.
  • Opening clearance in front of and beside each door, checked against the room layout and traffic flow.
  • Reveal and gap tolerances between doors, and who signs off the alignment standard at handover.

5. Lighting and services

If shelving lighting is in scope, it has to be coordinated before the carcase is built, not after installation. Confirm the fitting type, the driver location and how it will be accessed for maintenance, plus where power is fed from and who installs that feed. Where integrated lighting is specified alongside the joinery - as with Santerson Integrated LED Media Units in a media wall - the cable routes, transformer positions and switching are drawn on the joinery layout so the electrician and the joinery package work from the same sheet. Electrical ratings and compatibility are confirmed for each cabinet design; they are not carried over from another project.

6. Interface with other building elements

Bookshelves rarely stand alone. Decide before approval how they meet the rest of the build:

  • Wall finishes behind and around the run, and whether the unit is installed before or after them.
  • Flooring direction and threshold details at any adjacent joinery.
  • Ceiling junctions, including bulkheads, cove lighting and acoustic panels above the run.
  • Structural fixing: what the wall will accept, whether additional backing or framing is needed, and who provides it.

7. Procurement route, delivery and site readiness

For projects sourcing joinery from overseas, approval should also cover the logistics that sit around the product itself. Our Custom & OEM Service covers bespoke sizing, materials and finishes with prototyping before series production, and Logistics & Door-to-Door Delivery handles freight forwarding by sea, air or rail with the associated paperwork and container loading. Confirm for your specific project: the shipping route and Incoterms, who clears customs and pays duty, the delivery address and access conditions, lift or stair capacity for long carcase sections, and how the consignment will be stored on site before installation. Import terms, transit arrangements and packaging details are agreed case by case; they are not standard assumptions.

Then confirm site readiness: a clean, dry, decorated room with services complete. Fitted joinery installed into an active site is the most common cause of damaged panels and unresolved snags.

8. Installation, inspection and handover

Finally, agree how the work will be inspected before it is signed off. Under Installation & After-sales Support, on-site installation is followed by inspection and snagging, with spare parts and replacement handled afterwards. Before approval, confirm who carries out the installation, which items are covered under warranty and for how long, what response time applies to defects, and what exclusions apply - site damage, movement of the building and unauthorised modification all sit outside a joinery warranty. Written acceptance criteria agreed at order stage make the handover meeting short; unwritten ones make it long.

A short approval record

Before releasing an order for closed bookshelves, we recommend the project team hold one signed sheet covering: as-built dimensions with wall condition noted; internal shelf schedule tied to intended use; approved physical finish sample; door and hardware specification with clearances checked; lighting and services coordination drawing; interface responsibilities for flooring, walls and ceiling; shipping terms, delivery access and storage plan; and the inspection and warranty terms for handover. Anything not on that sheet becomes a variation later.

Send us your elevation drawings, room dimensions and finish references, and we will return a specification against each of these points so your approval decision rests on confirmed details rather than assumptions.